# Riot Platforms Corsicana Campus

ERCOT data center · https://askthegrid.com/assets/facilities/riot-platforms-corsicana-campus--grid-load-8da76b6dcc5c0745

Riot Platforms' Corsicana campus at 6980 FM 709 S in Navarro County, Texas, connects to ERCOT at 345 kV with 1,000 MW of available capacity. Construction began in 2023 and bitcoin mining started in 2024. Riot is developing AI and HPC data center buildings under its Standard Design; a two-story, 335,428 sq ft data center building (Project Ditto, $400 million) was registered with TDLR with construction from April 2026 to May 2028. Riot curtails mining under ERCOT demand response programs.

## Identity and location

- Operating status: expanding
- Asset scope: campus
- Location: 6980 FM 709 S, Corsicana, TX
- Operator: Riot Platforms (campus) — https://www.riotplatforms.com

## Power and grid context

- Reported unspecified: 1,000 MW · reported · campus — Available capacity at Corsicana per Riot's Q3 2025 update; Riot describes it as 1 GW of fully approved capacity; basis unspecified.
- Reported unspecified: 168 MW · reported · building · Standard Design expansion — Core & shell building for AI and HPC workloads in the expansion under development; basis unspecified.
- Balancing authority: ERCOT
- Interconnection voltage: 345 kV

## Development

- Construction: Construction began in 2023 and mining operations began in 2024; core and shell development for AI/HPC data center buildings is under way.

## Compute and operations

- Facility classes: crypto_mining, ai_hpc

## Sources

- [https://d2ghdaxqb194v2.cloudfront.net/2865/198620.pdf](https://d2ghdaxqb194v2.cloudfront.net/2865/198620.pdf)
- [FRS Facility Detail Report | Envirofacts | US EPA](https://frs-public.epa.gov/ords/frs_public2/fii_query_dtl.disp_program_facility?p_registry_id=110072060803)
- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=6980+FM+709+S%2C+Corsicana%2C+TX%2C+75110&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Our Campuses | Riot Platforms](https://www.riotplatforms.com/locations/)
- [Corsicana | Riot Platforms](https://www.riotplatforms.com/locations/corsicana/)
- [Riot Platforms Reports Second Quarter 2026 Financial Results and Strategic Highlights | Riot Platforms](https://www.riotplatforms.com/riot-platforms-reports-second-quarter-2026-financial-results-and-strategic-highlights/)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026020144)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/riot-platforms-corsicana-campus--grid-load-8da76b6dcc5c0745
Profile generated: 2026-10-09T16:44:41.967925Z
Source: Ask the Grid — https://askthegrid.com/