# Riverside Generating LLC

PJM Natural Gas Fired Combustion Turbine · https://askthegrid.com/assets/facilities/riverside-generating-llc

Riverside Generating LLC is a natural gas-fired power facility with 1,150 MW of EIA-reported nameplate capacity in Lawrence County, Kentucky, registered as EIA Plant ID 55198. Riverside Generating Co LLC owns and operates the plant. It is an operating PJM peaking resource with five natural-gas combustion-turbine units. Its grid role is primarily peaking generation: simple-cycle gas units kept available and dispatched when economically advantageous.

## Key facts

- Technology: Natural Gas Fired Combustion Turbine
- Power capacity: 1150 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)
- Substation: Kentucky Power's Baker Switchyard
- Point of interconnection: Kentucky Power's Baker Switchyard
- Transmission owner: Kentucky Power
- Interconnection voltage: 345 kV

## Source-backed facts

- Owner logo domain: lspower.com — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Official project url: https://www.lspower.com/news/ls-power-completes-purchase-generating-assets-dynegy/ — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: medium
- Identifiers.8: {"value":"ZELDA 1 RIVERSIDE","system":"PJM capacity resource"} — Sheet1 · confidence: high
- Identifiers.9: {"value":"ZELDA 2 RIVERSIDE","system":"PJM capacity resource"} — Sheet1 · confidence: high
- Identifiers.11: {"value":"ZELDA 4 FOOTHILLS","system":"PJM capacity resource"} — Sheet1 · confidence: high
- Identifiers.12: {"value":"ZELDA 5 FOOTHILLS","system":"PJM capacity resource"} — Sheet1 · confidence: medium
- Identifiers.13: {"value":"2017-00472","system":"Kentucky PSC docket"} — Source · confidence: high
- Parties.3: {"relationship":"Retail station-power utility","name":"Kentucky Power Company","official_url":null} — Source · confidence: high
- Parties.4: {"relationship":"Turbine supplier","name":"Siemens","official_url":"https://www.siemens-energy.com"} — Power plant profile: Riverside Gas Fired Power Plant, US · confidence: medium
- Parties.5: {"relationship":"Engineering-services contractor","name":"NAES","official_url":"https://www.naes.com"} — The Scramble To Get Riverside a New Transformer - NAES · confidence: medium
- Parties.6: {"relationship":"Transformer and turbine-services supplier","name":"ProEnergy Services","official_url":null} — The Scramble To Get Riverside a New Transformer - NAES · confidence: medium
- Interconnection: Kentucky Power's Baker 345 kV Substation; PJM interconnection — Kentucky Power Company's Response Brief · confidence: medium
- Construction scope: KBR was selected as EPC contractor. The Riverside build comprises the Zelda site with three Siemens 501F A natural-gas-fired simple-cycle combustion turbines and the Foothills site with two Siemens 501F natural-gas-fired simple-cycle combustion turbines. The documented scope also includes administration and control buildings, a natural-gas yard, balance-of-plant equipment, generators, electrical bus duct, generator step-up transformers, and separate network/transmission upgrades to Baker Substation. — Power plant profile: Riverside Gas Fired Power Plant, US · confidence: medium
- Construction scope: KBR was selected as EPC contractor. The Riverside build comprises the Zelda site with three Siemens 501F A natural-gas-fired simple-cycle combustion turbines and the Foothills site with two Siemens 501F natural-gas-fired simple-cycle combustion turbines. The documented scope also includes administration and control buildings, a natural-gas yard, balance-of-plant equipment, generators, electrical bus duct, generator step-up transformers, and separate network/transmission upgrades to Baker Substation. — Source · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html — Aeroderivative, Industrial and Heavy-Duty Gas Turbines · confidence: medium
- Manufacturer domain: siemens-energy.com — Aeroderivative, Industrial and Heavy-Duty Gas Turbines · confidence: high
- Product family: Siemens 501F / SGT6-5000F — Aeroderivative, Industrial and Heavy-Duty Gas Turbines · confidence: medium
- Equipment models.1: {"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html","count":2,"unit_mw":230,"name":"Siemens Model 501F — Foothills units"} — Dynegy to build second power plant in Kentucky · confidence: medium
- Description: Riverside Generating LLC is an operating natural-gas-fired simple-cycle plant in Lawrence County, Kentucky, with five 230 MW-class combustion-turbine units totaling 1,150 MW of nameplate capacity. The facility is physically one Riverside site, while PJM identifies Units 1–3 as Zelda and Units 4–5 as Foothills; the first three units entered service in 2001 and the latter two in 2002. Dynegy developed the Riverside and Foothills phases, LS Power acquired the Riverside asset from Dynegy in December 2009, and NRG completed its acquisition of the LS Power generation portfolio in January 2026. KBR provided EPC services, Siemens supplied the turbines, and IHI Power Services provided operation and maintenance services beginning in 2018. — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: medium
- Quality notes: ["Capacity figures vary by reporting scope: current EIA-derived plant data lists 1,150 MW nameplate capacity, while LS Power described Riverside as 836 MW in its 2009 acquisition release and the 2009 purchase agreement defined the Riverside/Foothills project at approximately 960 MW nominal.","The Kentucky PSC record describes the Zelda and Foothills units as two PJM-identified portions located at one physical Riverside site; they should not be treated as unrelated nearby plants.","Commercial-operation dating differs by source: the generator record gives June 2002 for Units 4–5, while a Kentucky PSC response places Foothills service with Kentucky Power around February 2002. Both sources place the Foothills phase in 2002.","No standalone Riverside allocation is disclosed for the 2009 sale or the 2026 LS Power portfolio transaction. The reported amounts are portfolio or multi-project values, and the 2015 refinancing covered Riverside together with two University Park projects.","The plant is listed as operational with five operational units and no planned units as of August 2, 2026; no retirement or repowering milestone is reported in the cited status material."] — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Financing summary: In August 2009, Dynegy agreed to sell the generation portfolio containing Riverside to LS Power for $1.025 billion in cash plus 245 million Dynegy Class B shares; the transaction also involved $235 million principal amount of Dynegy senior unsecured notes. No Riverside-specific allocation of that consideration is disclosed. In September 2015, LS Power refinanced Riverside together with University Park North and University Park South using a $550 million seven-year term loan and a $10 million revolving facility; the lender and Riverside-specific allocation were not disclosed. On January 30, 2026, NRG completed its acquisition of the LS Power portfolio. NRG reported preliminary total consideration of $10.579 billion, consisting of $6.851 billion of cash including adjustments and $3.728 billion of stock consideration, and disclosed $4.357 billion of debt issuance plus $2.494 billion drawn under a revolving credit facility to fund the cash consideration. LS Power described the broader sale as approximately $13 billion in cash and NRG stock. These 2009 and 2026 figures are portfolio transaction values, not Riverside-specific purchase prices or project financing amounts. — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Financing summary: In August 2009, Dynegy agreed to sell the generation portfolio containing Riverside to LS Power for $1.025 billion in cash plus 245 million Dynegy Class B shares; the transaction also involved $235 million principal amount of Dynegy senior unsecured notes. No Riverside-specific allocation of that consideration is disclosed. In September 2015, LS Power refinanced Riverside together with University Park North and University Park South using a $550 million seven-year term loan and a $10 million revolving facility; the lender and Riverside-specific allocation were not disclosed. On January 30, 2026, NRG completed its acquisition of the LS Power portfolio. NRG reported preliminary total consideration of $10.579 billion, consisting of $6.851 billion of cash including adjustments and $3.728 billion of stock consideration, and disclosed $4.357 billion of debt issuance plus $2.494 billion drawn under a revolving credit facility to fund the cash consideration. LS Power described the broader sale as approximately $13 billion in cash and NRG stock. These 2009 and 2026 figures are portfolio transaction values, not Riverside-specific purchase prices or project financing amounts. — Source · confidence: medium
- Financing summary: In August 2009, Dynegy agreed to sell the generation portfolio containing Riverside to LS Power for $1.025 billion in cash plus 245 million Dynegy Class B shares; the transaction also involved $235 million principal amount of Dynegy senior unsecured notes. No Riverside-specific allocation of that consideration is disclosed. In September 2015, LS Power refinanced Riverside together with University Park North and University Park South using a $550 million seven-year term loan and a $10 million revolving facility; the lender and Riverside-specific allocation were not disclosed. On January 30, 2026, NRG completed its acquisition of the LS Power portfolio. NRG reported preliminary total consideration of $10.579 billion, consisting of $6.851 billion of cash including adjustments and $3.728 billion of stock consideration, and disclosed $4.357 billion of debt issuance plus $2.494 billion drawn under a revolving credit facility to fund the cash consideration. LS Power described the broader sale as approximately $13 billion in cash and NRG stock. These 2009 and 2026 figures are portfolio transaction values, not Riverside-specific purchase prices or project financing amounts. — LS Power Completes $13 Billion Milestone Transaction with NRG Energy - LS Power · confidence: medium
- Timeline: [{"event":"Zelda site land acquisition","date":"2000","detail":"The Kentucky PSC record states that the real estate for Riverside Units 1–3, identified by PJM as the Zelda site, was originally acquired in 2000."},{"event":"Foothills construction announced","date":"2001-04-16","detail":"Dynegy announced plans for the 330 MW natural-gas-fired Foothills Generating Project in Lawrence County, adjacent to its 500 MW Riverside Generating Project. The announcement described two Siemens Westinghouse 501F combustion turbines and expected commercial operation in the second quarter of 2002."},{"event":"Initial Riverside commercial operation","date":"2001-07","detail":"The first Riverside units entered operation in July 2001; the generator record gives July 2001 as the first-operation date for GTG1, GTG2, and GTG3."},{"event":"Foothills units entered service","date":"2002","detail":"Riverside Units 4–5, identified by PJM as the Foothills portion, were placed into operation in 2002. The generator record gives June 2002, while a Kentucky PSC response states that Foothills began service with Kentucky Power around February 2002."},{"event":"Sale agreement announced","date":"2009-08-10","detail":"Dynegy announced definitive agreements to sell selected natural-gas generation assets, including Riverside, to LS Power for $1.025 billion in cash and 245 million Dynegy Class B shares."},{"event":"Acquisition by LS Power completed","date":"2009-12-01","detail":"LS Power announced completion of its purchase of generating assets from Dynegy, including Riverside, described at that time as an 836 MW natural-gas-fired simple-cycle facility in Kentucky."},{"event":"Multi-project refinancing","date":"2015-09","detail":"LS Power completed a refinancing covering the Riverside, University Park North, and University Park South gas-fired projects. The financing comprised a $550 million seven-year term loan and a $10 million revolving facility."},{"event":"O&M contract commenced","date":"2018","detail":"IHI Power Services' operation and maintenance contract for the Riverside project commenced in 2018 for a stated five-year term."},{"event":"Acquisition by NRG completed","date":"2026-01-30","detail":"NRG completed its acquisition of the LS Power portfolio, which included Riverside Generating Company, LLC in its listed generation-facility schedule. The portfolio comprised 18 natural-gas-fired facilities totaling approximately 13 GW."},{"event":"Operational status","date":"2026-08-02","detail":"The plant is listed as operational with five operational generators totaling 1,150 MW of nameplate capacity and no planned units."}] — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: medium
- Timeline: [{"event":"Zelda site land acquisition","date":"2000","detail":"The Kentucky PSC record states that the real estate for Riverside Units 1–3, identified by PJM as the Zelda site, was originally acquired in 2000."},{"event":"Foothills construction announced","date":"2001-04-16","detail":"Dynegy announced plans for the 330 MW natural-gas-fired Foothills Generating Project in Lawrence County, adjacent to its 500 MW Riverside Generating Project. The announcement described two Siemens Westinghouse 501F combustion turbines and expected commercial operation in the second quarter of 2002."},{"event":"Initial Riverside commercial operation","date":"2001-07","detail":"The first Riverside units entered operation in July 2001; the generator record gives July 2001 as the first-operation date for GTG1, GTG2, and GTG3."},{"event":"Foothills units entered service","date":"2002","detail":"Riverside Units 4–5, identified by PJM as the Foothills portion, were placed into operation in 2002. The generator record gives June 2002, while a Kentucky PSC response states that Foothills began service with Kentucky Power around February 2002."},{"event":"Sale agreement announced","date":"2009-08-10","detail":"Dynegy announced definitive agreements to sell selected natural-gas generation assets, including Riverside, to LS Power for $1.025 billion in cash and 245 million Dynegy Class B shares."},{"event":"Acquisition by LS Power completed","date":"2009-12-01","detail":"LS Power announced completion of its purchase of generating assets from Dynegy, including Riverside, described at that time as an 836 MW natural-gas-fired simple-cycle facility in Kentucky."},{"event":"Multi-project refinancing","date":"2015-09","detail":"LS Power completed a refinancing covering the Riverside, University Park North, and University Park South gas-fired projects. The financing comprised a $550 million seven-year term loan and a $10 million revolving facility."},{"event":"O&M contract commenced","date":"2018","detail":"IHI Power Services' operation and maintenance contract for the Riverside project commenced in 2018 for a stated five-year term."},{"event":"Acquisition by NRG completed","date":"2026-01-30","detail":"NRG completed its acquisition of the LS Power portfolio, which included Riverside Generating Company, LLC in its listed generation-facility schedule. The portfolio comprised 18 natural-gas-fired facilities totaling approximately 13 GW."},{"event":"Operational status","date":"2026-08-02","detail":"The plant is listed as operational with five operational generators totaling 1,150 MW of nameplate capacity and no planned units."}] — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Timeline.5: {"event":"Acquisition by LS Power completed","date":"2009-12-01","detail":"LS Power announced completion of its purchase of generating assets from Dynegy, including Riverside, described at that time as an 836 MW natural-gas-fired simple-cycle facility in Kentucky."} — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: high
- Timeline.6: {"event":"Multi-project refinancing","date":"2015-09","detail":"LS Power completed a refinancing covering the Riverside, University Park North, and University Park South gas-fired projects. The financing comprised a $550 million seven-year term loan and a $10 million revolving facility."} — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Commercial parties.2: {"relationship":"2009 buyer; former parent/developer","name":"LS Power","detail":"LS Power completed the December 2009 acquisition of Riverside from Dynegy and subsequently owned and operated the project portfolio that included Riverside.","official_url":"https://www.lspower.com"} — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: medium
- Commercial parties.2: {"relationship":"2009 buyer; former parent/developer","name":"LS Power","detail":"LS Power completed the December 2009 acquisition of Riverside from Dynegy and subsequently owned and operated the project portfolio that included Riverside.","official_url":"https://www.lspower.com"} — LS Power Completes $13 Billion Milestone Transaction with NRG Energy - LS Power · confidence: medium
- Quality notes.0: Capacity figures vary by reporting scope: current EIA-derived plant data lists 1,150 MW nameplate capacity, while LS Power described Riverside as 836 MW in its 2009 acquisition release and the 2009 purchase agreement defined the Riverside/Foothills project at approximately 960 MW nominal. — LS Power Completes Purchase of Generating Assets from Dynegy - LS Power · confidence: medium
- Quality notes.0: Capacity figures vary by reporting scope: current EIA-derived plant data lists 1,150 MW nameplate capacity, while LS Power described Riverside as 836 MW in its 2009 acquisition release and the 2009 purchase agreement defined the Riverside/Foothills project at approximately 960 MW nominal. — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Quality notes.0: Capacity figures vary by reporting scope: current EIA-derived plant data lists 1,150 MW nameplate capacity, while LS Power described Riverside as 836 MW in its 2009 acquisition release and the 2009 purchase agreement defined the Riverside/Foothills project at approximately 960 MW nominal. — Source · confidence: medium
- Quality notes.3: No standalone Riverside allocation is disclosed for the 2009 sale or the 2026 LS Power portfolio transaction. The reported amounts are portfolio or multi-project values, and the 2015 refinancing covered Riverside together with two University Park projects. — LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power · confidence: medium
- Quality notes.3: No standalone Riverside allocation is disclosed for the 2009 sale or the 2026 LS Power portfolio transaction. The reported amounts are portfolio or multi-project values, and the 2015 refinancing covered Riverside together with two University Park projects. — Source · confidence: medium
- Substation: Kentucky Power's Baker Switchyard — v. · confidence: high
- Transmission owner: Kentucky Power — v. · confidence: medium
- Transmission owner: Kentucky Power — Source · confidence: medium

## Timeline

- 2001-04-16 — Foothills construction announced
  Dynegy announced plans for the 330 MW natural-gas-fired Foothills Generating Project in Lawrence County, adjacent to its 500 MW Riverside Generating Project. The announcement described two Siemens Westinghouse 501F combustion turbines and expected commercial operation in the second quarter of 2002.
  Source: Dynegy to build second power plant in Kentucky (https://www.power-eng.com/coal/plant-decommissioning/dynegy-to-build-second-power-plant-in-kentucky/)
- 2002 — Foothills units entered service
  Riverside Units 4–5, identified by PJM as the Foothills portion, were placed into operation in 2002. The generator record gives June 2002, while a Kentucky PSC response states that Foothills began service with Kentucky Power around February 2002.
  Source: Source (https://psc.ky.gov/pscecf/2017-00472/audra%40gosssamfordlaw.com/04202018054536/Riverside_PSCDR1_042018.pdf)
- 2009-08-10 — Sale agreement announced
  Dynegy announced definitive agreements to sell selected natural-gas generation assets, including Riverside, to LS Power for $1.025 billion in cash and 245 million Dynegy Class B shares.
  Source: Source (https://www.sec.gov/Archives/edgar/data/1379895/000137989509000014/ex99-2.htm)
- 2015-09 — Multi-project refinancing
  LS Power completed a refinancing covering the Riverside, University Park North, and University Park South gas-fired projects. The financing comprised a $550 million seven-year term loan and a $10 million revolving facility.
  Source: LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power (https://www.lspower.com/news/ls-power-completes-refinancing-university-park-north-university-park-south-riverside-projects/)

## Sources

- [LS Power Completes a Refinancing of the University Park North, University Park South and Riverside Projects - LS Power](https://www.lspower.com/news/ls-power-completes-refinancing-university-park-north-university-park-south-riverside-projects/) — lspower.com · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-rpm-existing-resource-list-post.xlsx) — pjm.com · tier other
- [Source](https://psc.ky.gov/pscecf/2017-00472/audra%40gosssamfordlaw.com/04202018054536/Riverside_PSCDR1_042018.pdf) — psc.ky.gov · tier regulatory
- [LS Power Completes Purchase of Generating Assets from Dynegy - LS Power](https://www.lspower.com/news/ls-power-completes-purchase-generating-assets-dynegy/) — lspower.com · tier other
- [The Scramble To Get Riverside a New Transformer - NAES](https://www.naes.com/the-scramble-to-get-riverside-a-new-transformer/) — naes.com · tier other
- [Power plant profile: Riverside Gas Fired Power Plant, US](https://www.power-technology.com/data-insights/power-plant-profile-riverside-gas-fired-power-plant-us/) — power-technology.com · tier other
- [Kentucky Power Company's Response Brief](https://psc.ky.gov/pscecf/2017-00472/sebishop%40aep.com/11202018035950/Kentucky_Power_Companys_Response_brief_11202018.pdf) — psc.ky.gov · tier regulatory
- [Source](https://psc.ky.gov/pscecf/2017-00472/audra%40gosssamfordlaw.com/11052018024724/Riverside_Notice_110518.pdf) — psc.ky.gov · tier regulatory
- [COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION In the Matter of: RIVERSIDE GENERATING COMPANY, L.L.C. ) ) v. )](https://psc.ky.gov/pscecf/2017-00472/audra%40gosssamfordlaw.com/11052018024724/Riverside_Brief_110518.pdf) — psc.ky.gov · tier regulatory
- [Aeroderivative, Industrial and Heavy-Duty Gas Turbines](https://www.siemens-energy.com/global/en/home/products-services/product-offerings/gas-turbines.html) — siemens-energy.com · tier other
- [Dynegy to build second power plant in Kentucky](https://www.power-eng.com/coal/plant-decommissioning/dynegy-to-build-second-power-plant-in-kentucky/) — power-eng.com · tier other
- [LS Power Completes Purchase of Generating Assets from Dynegy - LS Power](https://www.lspower.com/news/ls-power-completes-purchase-generating-assets-dynegy) — lspower.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1379895/000137989509000014/ex99-2.htm) — sec.gov · tier regulatory
- [Source](https://investors.nrg.com/static-files/4335d901-1657-4223-9f7e-b6be97b7bb71) — investors.nrg.com · tier other
- [LS Power Completes $13 Billion Milestone Transaction with NRG Energy - LS Power](https://lspower.com/news/ls-power-completes-13-billion-milestone-transaction-with-nrg-energy) — lspower.com · tier other
- [v.](https://psc.ky.gov/PSCSCF/2017%20cases/2017-00472/20190514_PSC_ORDER.pdf) — psc.ky.gov · tier regulatory
- [Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)](https://www.eia.gov/electricity/data/eia860m/) — eia.gov · tier regulatory

## Data quality

- Capacity figures vary by reporting scope: current EIA-derived plant data lists 1,150 MW nameplate capacity, while LS Power described Riverside as 836 MW in its 2009 acquisition release and the 2009 purchase agreement defined the Riverside/Foothills project at approximately 960 MW nominal. The Kentucky PSC record describes the Zelda and Foothills units as two PJM-identified portions located at one physical Riverside site; they should not be treated as unrelated nearby plants. Commercial-operation dating differs by source: the generator record gives June 2002 for Units 4–5, while a Kentucky PSC response places Foothills service with Kentucky Power around February 2002. Both sources place the Foothills phase in 2002. No standalone Riverside allocation is disclosed for the 2009 sale or the 2026 LS Power portfolio transaction. The reported amounts are portfolio or multi-project values, and the 2015 refinancing covered Riverside together with two University Park projects. The plant is listed as operational with five operational units and no planned units as of August 2, 2026; no retirement or repowering milestone is reported in the cited status material.

---

Canonical page: https://askthegrid.com/assets/facilities/riverside-generating-llc

Source: Ask the Grid — https://askthegrid.com/
