# Riverstart Solar Park III

PJM asset profile · https://askthegrid.com/assets/facilities/riverstart-solar-park-iii

## Current generation inventory

EIA plant 66269 · Inventory reporting month: 2026-08.

- solar: 100 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -85.12663, 40.055556
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2026-01-13 01:22:11+00:00
- Map prepared: 2026-10-10T23:05:22.559576+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Riverstart Solar Park III is a 100 MW solar photovoltaic plant in Randolph County. Riverstart III is the 100 MW third phase of the Riverstart Solar Park in Randolph County, Indiana, launched by EDP Renewables North America on April 1, 2025. Amazon has contracted for all 100 MW through a long-term power purchase agreement. The phase sits alongside the earlier two phases of the 300 MW park, and EDPR NA lists the solar park among the operating projects in its Indiana portfolio of 1.7 GW.

## Reviewed metrics

- **Nameplate capacity:** 100 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 66269 — plant-66269

## Facts

- **Technology:** Solar Photovoltaic
- **Operator:** Riverstart Solar Park III LLC
- **Operating status:** Operating

## Related parties

- **Owner / developer:** EDP Renewables North America — owner ([source](https://www.edp.com/en/north-america))
- **Offtaker:** Amazon — offtaker ([source](https://www.aboutamazon.com))

## Sources

- [solarpowerworldonline.com](https://www.solarpowerworldonline.com/2025/04/edp-renewables-completes-3rd-phase-of-indiana-solar-project/) — solarpowerworldonline.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/riverstart-solar-park-iii
Website: [EDP Renewables North America](https://www.edp.com/en/north-america)

Source: Ask the Grid — https://askthegrid.com/
