# Safe Harbor

PJM Conventional Hydroelectric · https://askthegrid.com/assets/facilities/safe-harbor

Safe Harbor is a hydroelectric facility with 417.5 MW of EIA-reported operating capacity in Lancaster County, Pennsylvania, registered as EIA Plant ID 3175. Brookfield Renewable is the current owner; Safe Harbor is the registered plant entity or operator. Safe Harbor is identified by ANDRITZ as the first hydropower project on the Susquehanna River in the United States. Its output is used primarily to serve peak electricity demand and operate the area's railroad system.

## Key facts

- Technology: Conventional Hydroelectric
- Power capacity: 417.5 MW
- Commercial operation: 1931
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM
- Substation: Manor Substation
- Point of interconnection: Manor Substation
- Transmission owner: PPL Electric Utilities Corp.
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: brookfield.com — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: medium
- Identifiers: [{"value":"3175","system":"EIA ORIS plant code"},{"value":"PJM","system":"ISO/RTO"},{"value":"1025","system":"FERC project/license number"},{"value":"P-1025-091","system":"FERC proceeding/docket"},{"value":"MAAC","system":"NERC region"},{"value":"31174101; 31174102; 31174103; 31174104; 31174105; 31174106; 31174107; 31174108; 31174109; 31174110; 31174111; 31174112","system":"GATS unit IDs"}] — Source · confidence: medium
- Identifiers: [{"value":"3175","system":"EIA ORIS plant code"},{"value":"PJM","system":"ISO/RTO"},{"value":"1025","system":"FERC project/license number"},{"value":"P-1025-091","system":"FERC proceeding/docket"},{"value":"MAAC","system":"NERC region"},{"value":"31174101; 31174102; 31174103; 31174104; 31174105; 31174106; 31174107; 31174108; 31174109; 31174110; 31174111; 31174112","system":"GATS unit IDs"}] — Regulations.gov · confidence: medium
- Owner name: Brookfield Renewable — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: high
- Description: Safe Harbor is a 417.5-MW conventional hydroelectric plant in Conestoga, Lancaster County, Pennsylvania, on the Susquehanna River. The facility has storage capabilities supporting daily peaking and participates in the PJM market. Safe Harbor Water Power Corporation is the licensee for FERC Project No. 1025; the project was constructed in 1930 and began operating in 1931. — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: medium
- Identifiers.1: {"value":"PJM","system":"ISO/RTO"} — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: medium
- Identifiers.3: {"value":"P-1025-091","system":"FERC proceeding/docket"} — Regulations.gov · confidence: high
- Identifiers.4: {"value":"MAAC","system":"NERC region"} — Source · confidence: medium
- Identifiers.5: {"value":"31174101; 31174102; 31174103; 31174104; 31174105; 31174106; 31174107; 31174108; 31174109; 31174110; 31174111; 31174112","system":"GATS unit IDs"} — Source · confidence: medium
- Parties.0: {"relationship":"Owner","name":"Brookfield Renewable","official_url":"https://bep.brookfield.com/"} — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: high
- Unit configuration: Conventional hydroelectric, run-of-river facility with 14 hydraulic turbine-generator units: 2 × 2 MW, 5 × 32 MW, 2 × 33 MW, and 5 × 37.5 MW. — Safe Harbor hydroelectric plant - Global Energy Monitor · confidence: medium
- Power mw: 417.5 — Safe Harbor P-1025 - Hydropower Reform Coalition · confidence: medium
- Unit count: 14 — Safe Harbor P-1025 · confidence: medium
- Product url: https://www.andritz.com/products-en/hydro/modernization-renewal — Modernization and rehabilitation of hydropwer plants · confidence: medium
- Financing summary: For the 33.3% interest, LS Power reported a $303 million enterprise value consisting of a $289 million cash purchase price, customary working-capital adjustments, and assumption of approximately $14 million in net project debt; this was sale consideration and assumed project debt, not separately identified project financing. For Exelon's remaining 67% interest, Brookfield announced an approximately $613 million purchase price on 2014-05-15, funded through available liquidity and capital from Brookfield Renewable. The Brookfield release does not identify a separate project-finance debt facility for that purchase. — Brookfield Renewable Acquires Remaining Interest in 417... · confidence: medium
- Quality notes.0: The EIA plant record reports 417.50 MW of nameplate capacity, while 2014 transaction announcements round the facility to 417 MW; this directory uses 417.5 MW for EIA plant 3175. — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: medium
- Quality notes.1: The 2014 ownership change comprised separate transactions: LS Power's 33.3% interest was sold at a $303 million enterprise value, while Brookfield agreed to acquire Exelon's remaining 67% for approximately $613 million. — Brookfield Renewable Acquires Remaining Interest in 417... · confidence: medium
- Timeline.1: {"event":"Commercial operation","date":"1931","detail":"The project started operation in 1931."} — Safe Harbor Dam · confidence: medium
- Timeline.4: {"event":"Generator refurbishment contract","date":"2013-09","detail":"Safe Harbor Water Power Corporation assigned ANDRITZ HYDRO a contract to refurbish two generators that were more than 80 years old."} — Brookfield Renewable Completes U.S. Hydro Acquisition · confidence: medium
- Timeline.6: {"event":"Sale of 33.3% interest","date":"2014-04-04","detail":"LS Power Equity Advisors, through a managed private fund, closed the sale of its 33.3% ownership interest and 50% voting rights to a Brookfield Renewable subsidiary."} — Brookfield Renewable Acquires Remaining Interest in 417... · confidence: medium
- Timeline.7: {"event":"Agreement to acquire remaining interest","date":"2014-05-15","detail":"Brookfield announced an agreement with Exelon Corporation to acquire the remaining 67% interest for approximately $613 million."} — Brookfield Renewable Completes Safe Harbor Acquisition · confidence: high
- Commercial parties.3: {"relationship":"Seller of remaining 67% interest","name":"Exelon Corporation","detail":"Brookfield agreed in May 2014 to acquire Exelon's remaining 67% interest in the facility for approximately $613 million; the seller was described as an Exelon subsidiary.","official_url":"https://www.exeloncorp.com/"} — Brookfield Renewable Acquires Remaining Interest in 417... · confidence: medium
- Commercial parties.3: {"relationship":"Seller of remaining 67% interest","name":"Exelon Corporation","detail":"Brookfield agreed in May 2014 to acquire Exelon's remaining 67% interest in the facility for approximately $613 million; the seller was described as an Exelon subsidiary.","official_url":"https://www.exeloncorp.com/"} — Brookfield acquires remaining 67% of Pennsylvania's 413-... · confidence: medium
- Acquisition detail: On March 28, 2014, Brookfield Renewable and its institutional partners completed the acquisition of a 33% economic interest in the 417 MW Safe Harbor hydroelectric facility from a private seller. Brookfield assumed approximately 40% of the investment, with institutional partners funding the remainder. — Source · confidence: high
- Acquisition date: 2014-03-28 — Source · confidence: high
- Seller: Unnamed private seller — Source · confidence: medium
- Ownership interest pct: 33 — Source · confidence: high
- Prior owner: Unnamed private seller — Source · confidence: medium
- Acquirer: Brookfield Renewable and its institutional partners — Source · confidence: medium
- Transaction scope: ownership_stake — Source · confidence: high
- Substation: Manor Substation — 171 FERC ¶ 61237 · confidence: medium
- Interconnection voltage kv: 230 — Source · confidence: medium
- Balancing authority: PJM — Source · confidence: high
- Replacement or repowering: Relicensing is underway rather than a stated replacement or repowering; refurbishment of units 3 and 7 was undertaken to extend their operating life. — Source · confidence: medium

## Timeline

- 1930 — Original construction
  The Safe Harbor Project was constructed in 1930.
  Source: Source (https://safeharborrelicensing.brookfieldusprojects.com/)
- 1931 — Commercial operation
  The project started operation in 1931.
  Source: Source (https://safeharborrelicensing.brookfieldusprojects.com/)
- 1982-1986 — Capacity expansion
  Expansion construction began on April 12, 1982; five new turbine-generator units came online between April 13, 1985 and April 12, 1986.
  Source: Safe Harbor Dam (https://en.wikipedia.org/wiki/Safe_Harbor_Dam)
- 2013-09 — Generator refurbishment contract
  Safe Harbor Water Power Corporation assigned ANDRITZ HYDRO a contract to refurbish two generators that were more than 80 years old.
  Source: Safe Harbor - HYDROPOWER (https://www.andritz.com/hydro-en/hydronews/25/hy-news-25-15-safeharbor-hydro)
- 2014-08-08 — Full acquisition completed
  Brookfield Renewable and its institutional partners completed the previously announced acquisition of the Safe Harbor hydroelectric facility.
  Source: Brookfield Renewable Completes Safe Harbor Acquisition (https://bep.brookfield.com/press-releases/bep/brookfield-renewable-completes-safe-harbor-acquisition)
- 2030-04-22 — Current license expiration
  The current FERC License No. 1025 expires on April 22, 2030; no retirement or repowering date is established in the project history.
  Source: Source (https://safeharborrelicensing.brookfieldusprojects.com/)

## Sources

- [Brookfield Renewable Completes U.S. Hydro Acquisition](https://bep.brookfield.com/press-releases/bep/brookfield-renewable-completes-us-hydro-acquisition) — bep.brookfield.com · tier other
- [Source](https://www.puc.pa.gov/electric/pdf/Qualified_Alternative_Energy_Systems.pdf) — puc.pa.gov · tier regulatory
- [Safe Harbor Relicensing](https://safeharborrelicensing.brookfieldusprojects.com/) — safeharborrelicensing.brookfieldusprojects.com · tier other
- [Regulations.gov](https://www.regulations.gov/document/FERC-2025-0695-0001) — regulations.gov · tier regulatory
- [Safe Harbor - HYDROPOWER](https://www.andritz.com/hydro-en/hydronews/25/hy-news-25-15-safeharbor-hydro) — andritz.com · tier other
- [Safe Harbor P-1025 - Hydropower Reform Coalition](https://hydroreform.org/hydro-project/safe-harbor-p-1025/) — hydroreform.org · tier other
- [H-1 | P-15332-001 | Federal Energy Regulatory Commission](https://www.ferc.gov/media/h-1-p-15332-001) — ferc.gov · tier regulatory
- [Safe Harbor hydroelectric plant - Global Energy Monitor](https://www.gem.wiki/Safe_Harbor_hydroelectric_plant) — gem.wiki · tier other
- [Modernization and rehabilitation of hydropwer plants](https://www.andritz.com/products-en/hydro/modernization-renewal) — andritz.com · tier other
- [Brookfield Renewable Acquires Remaining Interest in 417 ...](https://bep.brookfield.com/press-releases/bep/brookfield-renewable-acquires-remaining-interest-417-mw-safe-harbor) — bep.brookfield.com · tier other
- [Safe Harbor Dam](https://en.wikipedia.org/wiki/Safe_Harbor_Dam) — en.wikipedia.org · tier other
- [Brookfield Renewable Completes Safe Harbor Acquisition](https://bep.brookfield.com/press-releases/bep/brookfield-renewable-completes-safe-harbor-acquisition) — bep.brookfield.com · tier other
- [Brookfield acquires remaining 67% of Pennsylvania's 413- ...](https://www.renewableenergyworld.com/energy-business/new-project-development/brookfield-acquires-remaining-67-of-pennsylvania-s-413-mw-safe-harbor-hydropower-project/) — renewableenergyworld.com · tier other
- [Source](https://www.puc.pa.gov/pcdocs/1871494.pdf) — puc.pa.gov · tier regulatory
- [171 FERC ¶ 61237](https://www.ferc.gov/sites/default/files/2020-06/E-21-061820.pdf) — ferc.gov · tier regulatory
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-rpm-existing-resource-list-post.xlsx) — pjm.com · tier other
- [Source](https://www.andritz.com/resource/blob/31252/929754d70c2dfc2b54055d3a8d6cee0b/hy-25-safe-harbor-data.pdf) — andritz.com · tier other

## Data quality

- The EIA plant record reports 417.50 MW of nameplate capacity, while 2014 transaction announcements round the facility to 417 MW; this directory uses 417.5 MW for EIA plant 3175. No retirement date is established. The documented 2013 equipment work was refurbishment of two generators rather than a stated repowering, and the project remains under a license expiring in 2030.

---

Canonical page: https://askthegrid.com/assets/facilities/safe-harbor

Source: Ask the Grid — https://askthegrid.com/
