# SB Energy Milam Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/sb-energy-milam-data-center-campus--grid-load-e8ebfa05b56f3190

The Milam Data Center is an AI data center campus under construction near Burlington in Milam County, Texas. SB Energy is developing it and says it will be the long-term owner and operator, with OpenAI as the customer. Lease disclosures cover about 753 MW of critical IT capacity in two buildings, with a last ready-for-service year of 2028. High-voltage interconnection is planned in phases for an initial campus load of about 660 MW, and SB Energy says it plans new generation to support the site.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 3755 County Road 134, Burlington, Milam County, TX
- Operator: SB Energy (exact asset)
- Owner: SB Energy (exact asset)
- Developer: SB Energy (exact asset)
- Owner: Milam County Data Center LLC (exact asset)
- Tenant: OpenAI (exact asset)

## Power and grid context

- Critical it load: About 753 MW · under_construction · campus — Critical IT capacity across the two leased buildings in the issuer prospectus
- Critical it load: 308 MW · under_construction · target 2028 · building — Milam County 1, last ready-for-service year
- Critical it load: 445 MW · under_construction · target 2028 · building — Milam County 2, last ready-for-service year
- Reported unspecified: 1,200 MW · reported · campus — Announced scale of the OpenAI data center site in Milam County
- Utility service: About 660 MW · target · campus — Total initial campus load across the phased high-voltage interconnections
- Utility service: 200 MW · target · target 2026 · campus — Phase 1-A interconnection from Orion 1
- Utility service: 230 MW · target · target 2026 · campus — Phase 1-B interconnection from Orion 2
- Utility service: 230 MW · target · target 2027 · campus — Phase 1-C interconnection from Orion 3
- ISO/RTO: ERCOT

## Compute and operations

- Facility classes: AI data center
- Announced tenants: OpenAI
- Critical IT load: 753 MW

## Sources

- [Milam Data Center - SB Energy | Milam County, TX](https://milamdc.com/)
- [Roscoe Stirmer on Building the Milam Data Center](https://milamdc.com/updates/roscoe-stirmer-on-construction-progress/)
- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/2133037/000162828026059639/sbenergy-sx1.htm)
- [OpenAI and SoftBank Group Partner with SB Energy](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026017746)
- [FAQs - Milam Data Center | Milam County, TX](https://milamdc.com/faqs/)
- [Page Not Found - Texas Commission on Environmental Quality](https://www2.tceq.texas.gov/wq_dpa/index.cfm?fuseaction=home.permit_list_by_permit&permit_number=TXR1598ZP)

---

Canonical page: https://askthegrid.com/assets/facilities/sb-energy-milam-data-center-campus--grid-load-e8ebfa05b56f3190