# Scarlet Solar (CA)

CAISO Batteries, Solar Photovoltaic · https://askthegrid.com/assets/facilities/scarlet-solar-ca

Scarlet Solar (CA) is a hybrid solar and battery storage facility with 240 MW of EIA-reported total operating capacity and 160 MWh of reported storage energy capacity in Fresno County, California, registered as EIA Plant ID 64908. EDP Renewables North America LLC owns and operates the plant. Its grid role is hybrid solar generation with co-located battery storage used to store daytime solar energy for later delivery and grid support.

## Key facts

- Technology: Batteries, Solar Photovoltaic
- Power capacity: 240 MW
- Energy capacity: 160 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO (California Independent System Operator)
- Substation: Tranquility Switching Station
- Point of interconnection: Tranquility Switching Station
- Transmission owner: Pacific Gas and Electric Company (PG&E)
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: edp.com — EDP Renewables North America · confidence: high
- Identifiers: [{"value":"64908","system":"EIA plant ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"Q1135","system":"CAISO queue position"}] — Public Queue Report · confidence: medium
- Identifiers: [{"value":"64908","system":"EIA plant ID"},{"value":"CISO","system":"EIA balancing authority"},{"value":"CAISO","system":"ISO/RTO power market"},{"value":"Q1135","system":"CAISO queue position"}] — large generator interconnection agreement among re scarlet llc... · confidence: medium
- Description: Scarlet Solar (CA), publicly presented as Scarlet I Solar Energy Park, is an operational 240 MW solar-and-battery plant in Fresno County, California. The EIA 860M-derived record lists two generating units and a first-unit online date of June 1, 2024; the project announcement describes 200 MW of solar and a 40 MW battery energy storage system. The project has executed power purchase agreements with Ava Community Energy for 100 MW of solar and 30 MW of BESS, and with San José Clean Energy for 100 MW of solar and 10 MW of BESS. — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: medium
- Parties: [{"relationship":"Owner, developer, and operator","name":"EDP Renewables North America LLC","official_url":"https://edp.com/en/north-america/na"},{"relationship":"Offtaker / PPA counterparty","name":"Ava Community Energy","official_url":"https://avaenergy.org"},{"relationship":"Offtaker / PPA counterparty","name":"San José Clean Energy","official_url":"https://sanjosecleanenergy.org"}] — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Parties: [{"relationship":"Owner, developer, and operator","name":"EDP Renewables North America LLC","official_url":"https://edp.com/en/north-america/na"},{"relationship":"Offtaker / PPA counterparty","name":"Ava Community Energy","official_url":"https://avaenergy.org"},{"relationship":"Offtaker / PPA counterparty","name":"San José Clean Energy","official_url":"https://sanjosecleanenergy.org"}] — Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy · confidence: high
- Identifiers.3: {"value":"Q1135","system":"CAISO queue position"} — Public Queue Report · confidence: medium
- Identifiers.3: {"value":"Q1135","system":"CAISO queue position"} — large generator interconnection agreement among re scarlet llc... · confidence: medium
- Parties.0: {"relationship":"Owner, developer, and operator","name":"EDP Renewables North America LLC","official_url":"https://edp.com/en/north-america/na"} — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: medium
- Parties.1: {"relationship":"Offtaker / PPA counterparty","name":"Ava Community Energy","official_url":"https://avaenergy.org"} — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Parties.2: {"relationship":"Offtaker / PPA counterparty","name":"San José Clean Energy","official_url":"https://sanjosecleanenergy.org"} — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Parties.2: {"relationship":"Offtaker / PPA counterparty","name":"San José Clean Energy","official_url":"https://sanjosecleanenergy.org"} — Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy · confidence: high
- Site acres: 1600 — Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy · confidence: medium
- Construction scope: Scarlet I is an operational 240 MW solar-plus-battery facility with two generating units: GEN01 is a 200 MW bifacial crystalline-silicon, single-axis-tracking solar-PV unit, and GEN02 is a 40 MW lithium-ion battery generator. The documented physical scope includes PV modules and steel support structures, electrical inverters, intermediate-voltage transformers, collector cabling, two substations stepping voltage from 34.5 kV to 230 kV, a 230 kV gen-tie, and battery enclosures with associated electrical cabling. No exact installed module, inverter, battery-pack, or enclosure count is source-backed. — r · confidence: medium
- Construction scope: Scarlet I is an operational 240 MW solar-plus-battery facility with two generating units: GEN01 is a 200 MW bifacial crystalline-silicon, single-axis-tracking solar-PV unit, and GEN02 is a 40 MW lithium-ion battery generator. The documented physical scope includes PV modules and steel support structures, electrical inverters, intermediate-voltage transformers, collector cabling, two substations stepping voltage from 34.5 kV to 230 kV, a 230 kV gen-tie, and battery enclosures with associated electrical cabling. No exact installed module, inverter, battery-pack, or enclosure count is source-backed. — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: medium
- Equipment models: [] — r · confidence: medium
- Construction scope: Scarlet I is an operational 240 MW solar-plus-battery facility with two generating units: GEN01 is a 200 MW bifacial crystalline-silicon, single-axis-tracking solar-PV unit, and GEN02 is a 40 MW lithium-ion battery generator. The documented physical scope includes PV modules and steel support structures, electrical inverters, intermediate-voltage transformers, collector cabling, two substations stepping voltage from 34.5 kV to 230 kV, a 230 kV gen-tie, and battery enclosures with associated electrical cabling. No exact installed module, inverter, battery-pack, or enclosure count is source-backed. — r · confidence: medium
- Description: Scarlet Solar (CA), publicly presented as Scarlet I Solar Energy Park, is an operational 240 MW solar-and-battery plant in Fresno County, California, with two EIA-listed generating units and a first-unit online date of June 1, 2024. The commissioned Scarlet I configuration comprises 200 MW of solar generation and a 40 MW/160 MWh battery energy storage system. EDP Renewables North America LLC operates the plant through RE Scarlet LLC, its project-company subsidiary. County filings initially identified RE Scarlet LLC as a wholly owned subsidiary of Recurrent Energy in 2018 and later identified it as an EDP Renewables North America subsidiary; a March 2022 PPA assignment is documented, but no project sale consideration or dated acquisition transaction is disclosed. Construction was planned in phases beginning in the late-2021 period, followed by Scarlet I's July 2024 public unveiling. — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: medium
- Description: Scarlet Solar (CA), publicly presented as Scarlet I Solar Energy Park, is an operational 240 MW solar-and-battery plant in Fresno County, California, with two EIA-listed generating units and a first-unit online date of June 1, 2024. The commissioned Scarlet I configuration comprises 200 MW of solar generation and a 40 MW/160 MWh battery energy storage system. EDP Renewables North America LLC operates the plant through RE Scarlet LLC, its project-company subsidiary. County filings initially identified RE Scarlet LLC as a wholly owned subsidiary of Recurrent Energy in 2018 and later identified it as an EDP Renewables North America subsidiary; a March 2022 PPA assignment is documented, but no project sale consideration or dated acquisition transaction is disclosed. Construction was planned in phases beginning in the late-2021 period, followed by Scarlet I's July 2024 public unveiling. — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: medium
- Description: Scarlet Solar (CA), publicly presented as Scarlet I Solar Energy Park, is an operational 240 MW solar-and-battery plant in Fresno County, California, with two EIA-listed generating units and a first-unit online date of June 1, 2024. The commissioned Scarlet I configuration comprises 200 MW of solar generation and a 40 MW/160 MWh battery energy storage system. EDP Renewables North America LLC operates the plant through RE Scarlet LLC, its project-company subsidiary. County filings initially identified RE Scarlet LLC as a wholly owned subsidiary of Recurrent Energy in 2018 and later identified it as an EDP Renewables North America subsidiary; a March 2022 PPA assignment is documented, but no project sale consideration or dated acquisition transaction is disclosed. Construction was planned in phases beginning in the late-2021 period, followed by Scarlet I's July 2024 public unveiling. — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: medium
- Quality notes: ["EIA plant 64908 corresponds to Scarlet I; Scarlet II is a separate later phase with a separate EIA plant record and is not included in the 240 MW figure.","The original county environmental filings evaluated a larger proposed Scarlet project of up to 400 MW of solar and 400 MW of storage, whereas the commissioned Scarlet I configuration is 200 MW of solar plus 40 MW/160 MWh of storage.","The March 21, 2022 record documents assignment of the Ava/EBCE PPA to RE Scarlet 1 LLC; it does not identify a project sale, sale consideration, buyer, seller, or project-financing amount."] — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: high
- Financing summary: No project-debt amount, tax-equity commitment, lender, sale consideration, or portfolio transaction value is disclosed in the cited Scarlet I materials. The disclosed commercial contract history is separate from project financing: EBCE executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC on June 21, 2019, and the agreement was assigned to RE Scarlet 1 LLC on March 21, 2022. — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: medium
- Financing summary: No project-debt amount, tax-equity commitment, lender, sale consideration, or portfolio transaction value is disclosed in the cited Scarlet I materials. The disclosed commercial contract history is separate from project financing: EBCE executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC on June 21, 2019, and the agreement was assigned to RE Scarlet 1 LLC on March 21, 2022. — 400 MW · confidence: medium
- Timeline: [{"event":"Initial project application and predecessor applicant","date":"2018","detail":"Fresno County's initial study identified RE Scarlet LLC as the applicant and a wholly owned subsidiary of Recurrent Energy. The filing described phased construction beginning as early as mid-2020 and completion of the final phase as early as late 2021."},{"event":"Ava / EBCE PPA executed","date":"2019-06-21","detail":"East Bay Community Energy executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC."},{"event":"EDP applicant record and environmental review","date":"2021","detail":"The county environmental review identified RE Scarlet LLC as a wholly owned subsidiary of EDP Renewables North America LLC and evaluated a larger proposed Scarlet project interconnecting at PG&E's Tranquility Switching Station."},{"event":"PPA assignment to project company","date":"2022-03-21","detail":"The EBCE PPA was assigned from EDPR CA Solar Park VI LLC to RE Scarlet 1 LLC. This is a documented contract assignment, not a disclosed project sale."},{"event":"Ava / EBCE schedule-relief amendment","date":"2023-02-15","detail":"EBCE authorized an amendment to the PPA with RE Scarlet 1 LLC, extending the online date to November 1, 2023 from the previously expected March 30, 2023 date."},{"event":"First unit online / commercial operation","date":"2024-06-01","detail":"The EIA 860M-derived plant record reports Scarlet Solar's first unit online on June 1, 2024; the plant is listed as operational at 240 MW with two generating units."},{"event":"Public unveiling of Scarlet I","date":"2024-07-17","detail":"EDP Renewables North America and Ava Community Energy held the Scarlet I ribbon-cutting in Fresno County. The project was publicly described as a 200 MW solar facility paired with 40 MW/160 MWh of battery storage."},{"event":"Separate Scarlet II phase announced","date":"2025-05-06","detail":"EDP described Scarlet II as following Scarlet I and separately identified Scarlet II as a 200 MW solar project with a 150 MW/600 MWh BESS. Scarlet II is not part of EIA plant 64908."}] — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: medium
- Timeline: [{"event":"Initial project application and predecessor applicant","date":"2018","detail":"Fresno County's initial study identified RE Scarlet LLC as the applicant and a wholly owned subsidiary of Recurrent Energy. The filing described phased construction beginning as early as mid-2020 and completion of the final phase as early as late 2021."},{"event":"Ava / EBCE PPA executed","date":"2019-06-21","detail":"East Bay Community Energy executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC."},{"event":"EDP applicant record and environmental review","date":"2021","detail":"The county environmental review identified RE Scarlet LLC as a wholly owned subsidiary of EDP Renewables North America LLC and evaluated a larger proposed Scarlet project interconnecting at PG&E's Tranquility Switching Station."},{"event":"PPA assignment to project company","date":"2022-03-21","detail":"The EBCE PPA was assigned from EDPR CA Solar Park VI LLC to RE Scarlet 1 LLC. This is a documented contract assignment, not a disclosed project sale."},{"event":"Ava / EBCE schedule-relief amendment","date":"2023-02-15","detail":"EBCE authorized an amendment to the PPA with RE Scarlet 1 LLC, extending the online date to November 1, 2023 from the previously expected March 30, 2023 date."},{"event":"First unit online / commercial operation","date":"2024-06-01","detail":"The EIA 860M-derived plant record reports Scarlet Solar's first unit online on June 1, 2024; the plant is listed as operational at 240 MW with two generating units."},{"event":"Public unveiling of Scarlet I","date":"2024-07-17","detail":"EDP Renewables North America and Ava Community Energy held the Scarlet I ribbon-cutting in Fresno County. The project was publicly described as a 200 MW solar facility paired with 40 MW/160 MWh of battery storage."},{"event":"Separate Scarlet II phase announced","date":"2025-05-06","detail":"EDP described Scarlet II as following Scarlet I and separately identified Scarlet II as a 200 MW solar project with a 150 MW/600 MWh BESS. Scarlet II is not part of EIA plant 64908."}] — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: medium
- Timeline: [{"event":"Initial project application and predecessor applicant","date":"2018","detail":"Fresno County's initial study identified RE Scarlet LLC as the applicant and a wholly owned subsidiary of Recurrent Energy. The filing described phased construction beginning as early as mid-2020 and completion of the final phase as early as late 2021."},{"event":"Ava / EBCE PPA executed","date":"2019-06-21","detail":"East Bay Community Energy executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC."},{"event":"EDP applicant record and environmental review","date":"2021","detail":"The county environmental review identified RE Scarlet LLC as a wholly owned subsidiary of EDP Renewables North America LLC and evaluated a larger proposed Scarlet project interconnecting at PG&E's Tranquility Switching Station."},{"event":"PPA assignment to project company","date":"2022-03-21","detail":"The EBCE PPA was assigned from EDPR CA Solar Park VI LLC to RE Scarlet 1 LLC. This is a documented contract assignment, not a disclosed project sale."},{"event":"Ava / EBCE schedule-relief amendment","date":"2023-02-15","detail":"EBCE authorized an amendment to the PPA with RE Scarlet 1 LLC, extending the online date to November 1, 2023 from the previously expected March 30, 2023 date."},{"event":"First unit online / commercial operation","date":"2024-06-01","detail":"The EIA 860M-derived plant record reports Scarlet Solar's first unit online on June 1, 2024; the plant is listed as operational at 240 MW with two generating units."},{"event":"Public unveiling of Scarlet I","date":"2024-07-17","detail":"EDP Renewables North America and Ava Community Energy held the Scarlet I ribbon-cutting in Fresno County. The project was publicly described as a 200 MW solar facility paired with 40 MW/160 MWh of battery storage."},{"event":"Separate Scarlet II phase announced","date":"2025-05-06","detail":"EDP described Scarlet II as following Scarlet I and separately identified Scarlet II as a 200 MW solar project with a 150 MW/600 MWh BESS. Scarlet II is not part of EIA plant 64908."}] — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: medium
- Quality notes.0: EIA plant 64908 corresponds to Scarlet I; Scarlet II is a separate later phase with a separate EIA plant record and is not included in the 240 MW figure. — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Quality notes.1: The original county environmental filings evaluated a larger proposed Scarlet project of up to 400 MW of solar and 400 MW of storage, whereas the commissioned Scarlet I configuration is 200 MW of solar plus 40 MW/160 MWh of storage. — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: high
- Quality notes.2: The March 21, 2022 record documents assignment of the Ava/EBCE PPA to RE Scarlet 1 LLC; it does not identify a project sale, sale consideration, buyer, seller, or project-financing amount. — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: high
- Timeline.1: {"event":"Ava / EBCE PPA executed","date":"2019-06-21","detail":"East Bay Community Energy executed a solar-and-storage PPA with EDPR CA Solar Park VI LLC."} — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: high
- Timeline.3: {"event":"PPA assignment to project company","date":"2022-03-21","detail":"The EBCE PPA was assigned from EDPR CA Solar Park VI LLC to RE Scarlet 1 LLC. This is a documented contract assignment, not a disclosed project sale."} — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: high
- Timeline.4: {"event":"Ava / EBCE schedule-relief amendment","date":"2023-02-15","detail":"EBCE authorized an amendment to the PPA with RE Scarlet 1 LLC, extending the online date to November 1, 2023 from the previously expected March 30, 2023 date."} — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: high
- Timeline.6: {"event":"Public unveiling of Scarlet I","date":"2024-07-17","detail":"EDP Renewables North America and Ava Community Energy held the Scarlet I ribbon-cutting in Fresno County. The project was publicly described as a 200 MW solar facility paired with 40 MW/160 MWh of battery storage."} — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Timeline.7: {"event":"Separate Scarlet II phase announced","date":"2025-05-06","detail":"EDP described Scarlet II as following Scarlet I and separately identified Scarlet II as a 200 MW solar project with a 150 MW/600 MWh BESS. Scarlet II is not part of EIA plant 64908."} — EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California · confidence: high
- Commercial parties.0: {"relationship":"Owner, developer, and operator","name":"EDP Renewables North America LLC","detail":"EDP Renewables North America is identified as the parent of RE Scarlet LLC, and its public materials state that it and its subsidiaries develop, construct, own, and operate renewable generation and storage assets. The EIA plant record identifies EDPR NA as Scarlet Solar's operator.","official_url":"https://www.edpr.com/north-america/"} — 400 MW · confidence: high
- Commercial parties.1: {"relationship":"Project company and applicant","name":"RE Scarlet LLC / RE Scarlet 1 LLC","detail":"RE Scarlet LLC was the Fresno County project applicant. It was identified as a Recurrent Energy subsidiary in the 2018 initial study and as an EDP Renewables North America subsidiary in the later environmental review. The EBCE PPA was assigned to RE Scarlet 1 LLC in March 2022.","official_url":null} — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: medium
- Commercial parties.3: {"relationship":"Offtaker / PPA counterparty","name":"Ava Community Energy","detail":"Ava, formerly East Bay Community Energy, is the offtaker for 100 MW of Scarlet I solar generation and 30 MW / 120 MWh of battery storage under its executed agreement with the project.","official_url":"https://avaenergy.org"} — CAC Item C5 Staff Report Item 12 TO: East Bay Community Energy Board of Directors FROM: Marie Fontenot, Vice President · confidence: high
- Commercial parties.3: {"relationship":"Offtaker / PPA counterparty","name":"Ava Community Energy","detail":"Ava, formerly East Bay Community Energy, is the offtaker for 100 MW of Scarlet I solar generation and 30 MW / 120 MWh of battery storage under its executed agreement with the project.","official_url":"https://avaenergy.org"} — EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy · confidence: high
- Commercial parties.4: {"relationship":"Offtaker / PPA counterparty","name":"San José Clean Energy","detail":"San José Clean Energy contracted for 100 MW of Scarlet solar generation and 10 MW of on-site battery storage. Its public project description identifies Scarlet I as the facility serving that contract.","official_url":"https://sanjosecleanenergy.org"} — Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy · confidence: high
- Commercial parties.5: {"relationship":"Original PPA seller / project counterparty","name":"EDPR CA Solar Park VI LLC","detail":"EBCE's solar-and-storage PPA was executed with EDPR CA Solar Park VI LLC on June 21, 2019, before being assigned to RE Scarlet 1 LLC on March 21, 2022.","official_url":null} — Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet · confidence: high
- Acquisition detail: No source-backed acquisition or ownership-interest transfer was identified for the exact Scarlet Solar plant. Fresno County records show that RE Scarlet LLC was wholly owned by Recurrent Energy in 2018 and by EDP Renewables North America in later project records, but they do not document a sale, assignment, or other ownership transaction. — Scarlet Solar Energy Project (EIR No. 7230) · confidence: medium
- Prior owner: Recurrent Energy, as the historical parent of RE Scarlet LLC; no seller or transfer transaction is documented. — Scarlet Solar Energy Project (EIR No. 7230) · confidence: medium
- Substation: Tranquility Switching Station — Source · confidence: high
- Substation: Tranquility Switching Station — r · confidence: high
- Interconnection voltage kv: 230 — Source · confidence: high
- Interconnection voltage kv: 230 — r · confidence: high

## Timeline

- 2018 — Initial project application and predecessor applicant
  Fresno County's initial study identified RE Scarlet LLC as the applicant and a wholly owned subsidiary of Recurrent Energy. The filing described phased construction beginning as early as mid-2020 and completion of the final phase as early as late 2021.
  Source: Source (https://www.fresnocountyca.gov/files/sharedassets/county/v/1/vision-files/files/30304-eir7230_scarlet-solar_initial-study_2018-09-07.pdf)
- 2019-06-21 — Power purchase agreement
  East Bay Community Energy executed a PPA with EDPR CA Solar Park VI LLC on June 21, 2019, later assigned to RE Scarlet 1, LLC on March 21, 2022. The agreement covers 100 MW solar and 30 MW/120 MWh lithium-ion battery storage over 20 years.
  Source: Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet (https://avaenergy.org/wp-content/uploads/2023/02/10._Consent_Item_10_-_RE_Scarlet_1_LLC_Contract_Amendment_zxmnh1.pdf)
- 2021 — EDP applicant record and environmental review
  The county environmental review identified RE Scarlet LLC as a wholly owned subsidiary of EDP Renewables North America LLC and evaluated a larger proposed Scarlet project interconnecting at PG&E's Tranquility Switching Station.
  Source: Scarlet Solar Energy Project (EIR No. 7230) (https://ceqanet.lci.ca.gov/2018091022/2)
- 2023-02-15 — Ava / EBCE schedule-relief amendment
  EBCE authorized an amendment to the PPA with RE Scarlet 1 LLC, extending the online date to November 1, 2023 from the previously expected March 30, 2023 date.
  Source: Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet (https://avaenergy.org/wp-content/uploads/2023/02/10._Consent_Item_10_-_RE_Scarlet_1_LLC_Contract_Amendment_zxmnh1.pdf)
- 2024-07-17 — Public unveiling of Scarlet I
  EDP Renewables North America and Ava Community Energy held the Scarlet I ribbon-cutting in Fresno County. The project was publicly described as a 200 MW solar facility paired with 40 MW/160 MWh of battery storage.
  Source: EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy (https://avaenergy.org/news/edp-renewables-cuts-ribbon-on-scarlet-i-solar-energy-park-in-fresno-county-ca/)

## Sources

- [EDP Renewables North America](https://edp.com/en/north-america/na) — edp.com · tier other
- [Public Queue Report](https://www.caiso.com/documents/publicqueuereport.xlsx) — caiso.com · tier other
- [large generator interconnection agreement among re scarlet llc ...](https://sanjosecleanenergy.org/wp-content/uploads/2023/11/2.2.4.1.2-RE-Scarlet_CAISO-PGE_Interconnection-Agreement_Redacted.pdf) — sanjosecleanenergy.org · tier other
- [Scarlet Solar Energy Park](https://edp.com/en/north-america/na/projects/scarlet-solar-energy-park) — edp.com · tier other
- [EDP Renewables Cuts Ribbon On Scarlet I Solar Energy Park In Fresno County, CA - Ava Community Energy](https://avaenergy.org/news/edp-renewables-cuts-ribbon-on-scarlet-i-solar-energy-park-in-fresno-county-ca/) — avaenergy.org · tier other
- [Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy](https://sanjosecleanenergy.org/meet-scarlet-your-new-solar-power-plant/) — sanjosecleanenergy.org · tier other
- [Source](https://www.fresnocountyca.gov/files/sharedassets/county/v/1/vision-files/files/30304-eir7230_scarlet-solar_initial-study_2018-09-07.pdf) — fresnocountyca.gov · tier regulatory
- [Meet Scarlet - Your New Solar Power Plant - San Jose Clean Energy](https://sanjosecleanenergy.org/meet-scarlet-your-new-solar-power-plant) — sanjosecleanenergy.org · tier other
- [EDP Renewables North America Unveils 200 MW Solar and 150 MW Energy Storage Addition to Existing 1.1 GW Portfolio in California](https://edp.com/en/north-america/na/media/edp-renewables-north-america-unveils-200-mw-solar-and-150-mw-energy-storage) — edp.com · tier other
- [r](https://www.fresnocountyca.gov/files/sharedassets/county/v/1/vision-files/files/55418-scarlet-solar-draft-eir.pdf) — fresnocountyca.gov · tier regulatory
- [Scarlet Solar Energy Project (EIR No. 7230)](https://ceqanet.lci.ca.gov/2018091022/2) — ceqanet.lci.ca.gov · tier regulatory
- [Consent Item 10 East Bay Community Energy Board of Directors TO: Jim Dorrance, Power Resources Manager FROM: SUBJECT: RE Scarlet](https://avaenergy.org/wp-content/uploads/2023/02/10._Consent_Item_10_-_RE_Scarlet_1_LLC_Contract_Amendment_zxmnh1.pdf) — avaenergy.org · tier other
- [400 MW](https://edp.com/sites/default/files/document/2025-05/CA%20Scarlet%20Solar%20Energy%20Fact%20Sheet.pdf) — edp.com · tier other
- [CAC Item C5 Staff Report Item 12 TO: East Bay Community Energy Board of Directors FROM: Marie Fontenot, Vice President](https://avaenergy.org/wp-content/uploads/2022/10/C5._Item_C5_-_IRP_Analysis_and_Approval_of_CPUC_filing_Action_-_FINAL_1_k6qay7.pdf) — avaenergy.org · tier other
- [EDP Renewables Cuts Ribbon on Scarlet I Solar Energy Park in Fresno County, CA](https://edp.com/en/north-america/na/media/edp-renewables-cuts-ribbon-scarlet-i-solar-energy-park-fresno-county-ca) — edp.com · tier other
- [Source](https://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M608/K066/608066405.PDF) — docs.cpuc.ca.gov · tier regulatory
- [Source](https://www.caiso.com/documents/metering-exemption-listing-report-2026.pdf) — caiso.com · tier other
- [Source](https://www.caiso.com/documents/may-1-2026-final-2027-local-capacity-technical-report-and-update-regarding-2027-flexible-capacity-needs-assessment-resource-adequacy-program-r-25-10-003.pdf) — caiso.com · tier other
- [EDP Renewables Completes Scarlet II Solar and Energy ...](https://www.energyonline.com/Industry/News.aspx?NewsID=36232&EDP_Renewables_Completes_Scarlet_II_Solar_and_Energy_Storage_Project_in_California) — energyonline.com · tier other
- [Source](https://avaenergy.org/news/edp-renewables-cuts-ribbon-on-scarlet-i-solar-energy-park-in-fresno-county-ca) — avaenergy.org · tier other

## Data quality

- EIA plant 64908 corresponds to Scarlet I; Scarlet II is a separate later phase with a separate EIA plant record and is not included in the 240 MW figure. The original county environmental filings evaluated a larger proposed Scarlet project of up to 400 MW of solar and 400 MW of storage, whereas the commissioned Scarlet I configuration is 200 MW of solar plus 40 MW/160 MWh of storage. The March 21, 2022 record documents assignment of the Ava/EBCE PPA to RE Scarlet 1 LLC; it does not identify a project sale, sale consideration, buyer, seller, or project-financing amount.

---