# SDC Capital Partners Twin Creeks Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/sdc-capital-partners-twin-creeks-data-center-campus--grid-load-a8bdac7f3585e09a

Twin Creeks is a data center campus site on the south side of Cochran Mill Road in Loudoun County, Virginia, near Leesburg. An affiliate of SDC Capital Partners bought 97.15 acres in November 2025 for $615.05 million. The site has zoning approval for up to five two-story data centers totaling 1.6 million square feet and an on-site substation. Engineering plans for buildings 1 through 3 and for buildings 4 and 5 were in review with the county in 2026. No campus power figure is published; Dominion Energy has proposed a Twin Creeks Substation.

## Identity and location

- Operating status: approved
- Asset scope: campus
- Location: 42277 Cochran Mill Rd, Leesburg, Loudoun County, VA
- Developer: SDC Capital Partners (exact asset)

## Power and grid context

- ISO/RTO: PJM
- Electric utility: Dominion Energy Inc
- Point of interconnection: Proposed double circuit 230 kV connection to existing Edwards Ferry-Pleasant View Line #203
- Substation: Dominion Energy proposed Twin Creeks Substation with four 112 MVA 230-34.5 kV transformers, designed for an ultimate build-out of five

## Sources

- [Just a moment...](https://www.datacenterdynamics.com/en/news/sdc-capital-partners-buys-97-acres-of-data-center-zoned-land-in-virginia-for-615-million/)
- [Query: LOLA_PLANS_POLY (ID: 0)](https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0/query?where=PlanNumber%3D%27EPLAN-2026-0111%27&outFields=PlanNumber,PlanApplicationDate,PlanType,PlanStatus,PlanName,PlanDescription&returnGeometry=false&f=html)
- [Query: LOLA_PLANS_POLY (ID: 0)](https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0/query?where=PlanNumber%3D%27EPLAN-2026-0078%27&outFields=PlanNumber,PlanApplicationDate,PlanType,PlanStatus,PlanName,PlanDescription&returnGeometry=false&f=html)
- [www.dominionenergy.com](https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-2-of-3-2024.pdf)
- [Query: LOLA_PLANS_POLY (ID: 0)](https://logis.loudoun.gov/gis/rest/services/Projects/LOLA_DATA/MapServer/0/query?where=PlanNumber%3D%27STPL-2022-0040%27&outFields=PlanNumber,PlanApplicationDate,PlanType,PlanStatus,PlanName,PlanDescription&returnGeometry=false&f=html)
- [Twin Creeks Assemblage - JK Landholdings](https://www.jklandholdings.net/property-listing/twin-creeks-assemblage/)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=42277+Cochran+Mill+Rd%2C+Leesburg%2C+VA&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=42277+Cochran+Mill+Rd%2C+Leesburg%2C+VA&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [www.loudoun.gov](https://www.loudoun.gov/DocumentCenter/View/219212/400MRHI-Sales-for-2026-PDF)
- [Error 403 Forbidden](https://www.northernvirginiamag.com/news/2025/11/06/chuck-kuhn-sells-leesburg-land-to-data-center-developer-for-615-million/)

---

Canonical page: https://askthegrid.com/assets/facilities/sdc-capital-partners-twin-creeks-data-center-campus--grid-load-a8bdac7f3585e09a
Profile generated: 2026-11-02T21:33:15.289351Z
Source: Ask the Grid — https://askthegrid.com/