# Sequoia 1

ERCOT asset profile · https://askthegrid.com/assets/facilities/sequoia-1

Enbridge Solar (Sequoia I), LLC - Eastland County - ERCOT

Sequoia 1 is a 401.4 MW solar photovoltaic facility in Eastland County, Texas, identified in FERC/EIA records as plant 68200 with generator ID SEQ1. The facility is owned and operated by Enbridge Solar (Sequoia I), LLC, formerly Enbridge Solar (Eldorado), LLC. It represents the approximately 401 MW Phase One of Enbridge's 815 MW Sequoia Solar project. Sequoia 1 became operational in December 2025 and reached full operational status in May 2026.

## Metrics

- **Nameplate capacity:** 401.4 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 68200 — plant-68200

## Facts

- **Technology:** Solar Photovoltaic
- **Operator:** Sequoia 1 Solar Project

## Related parties

- **Project company / owner:** Enbridge Solar (Sequoia I), LLC — Owner / project company ([source](https://www.enbridge.com/stories/2026/may/sequoia-solar-phase-one-now-fully-operational))
- **Former owner:** Enbridge Solar (Eldorado), LLC — Former legal project-company name ([source](https://assets.comptroller.texas.gov/ch313/1752/1752-baird-enbridge-amendcert2.pdf))
- **Developer / sponsor / parent company:** Enbridge Inc. — Developer / project sponsor ([source](https://www.enbridge.com/))
- **Former owner / developer:** Tri Global Energy, LLC — Predecessor developer ([source](https://www.enbridge.com/stories/2022/september/acquisition-of-tri-global-energy-provides-big-boost-to-enbridges-renewables-business))
- **Operator:** Sequoia 1 Solar Project — EIA utility / operator name
- **Balancing authority / market operator:** Electric Reliability Council of Texas (ERCOT) — Balancing authority and market operator ([source](https://www.ercot.com/))
- **EPC contractor / construction contractor:** Rosendin Electric — Engineering, procurement, and construction contractor ([source](https://www.rosendin.com/sectors/energy/))
- **Equipment supplier:** Nextracker — Tracker supplier
- **Offtaker / power marketer:** AT&T — Power purchase agreement offtaker ([source](https://www.att.com/))
- **Offtaker / power marketer:** Toyota North America — Power purchase agreement offtaker
- **Offtaker / power marketer:** PepsiCo — Power purchase agreement offtaker
- **Offtaker / power marketer:** Donaldson Company — Power purchase agreement offtaker ([source](http://donaldson.com/en))

## Sources

- [enbridge.com](http://enbridge.com/investment-center/reports-and-sec-filings/-/media/Enb/Documents/Investor-Relations/NoticeAndAccess/2026/ENB_2025_Annual_Report_EN.pdf) — enbridge.com · public_source — Source retained for exact-record publication review.
- [assets.comptroller.texas.gov](https://assets.comptroller.texas.gov/ch313/1752/1752-baird-enbridge-amendcert2.pdf) — assets.comptroller.texas.gov · authoritative — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/sequoia-1
Website: [Enbridge Solar (Sequoia I), LLC](https://www.enbridge.com/stories/2026/may/sequoia-solar-phase-one-now-fully-operational)

Source: Ask the Grid — https://askthegrid.com/
