# Shady Oaks Wind 2

PJM asset profile · https://askthegrid.com/assets/facilities/shady-oaks-wind-2

## Current generation inventory

EIA plant 66568 · Inventory reporting month: 2026-08.

- wind: 108.3 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -89.0598, 41.666523
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2025-12-22 00:47:33+00:00
- Map prepared: 2026-10-10T23:05:22.557022+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Shady Oaks Wind 2 is a 108.3 MW onshore wind turbine plant in Lee County. Shady Oaks II, listed by EIA as Shady Oaks Wind 2, is a 108 MW wind project in Lee County, Illinois, about 50 miles west of Chicago, with 22 turbines. Liberty, part of Algonquin Power & Utilities, announced a collaboration with JPMorgan Chase, which will purchase approximately 70% of the output. The Lee County Board approved its special use permit in July 2020, and construction began in May 2021 under a contract with White Construction, a subsidiary of Infrastructure and Energy Alternatives.

## Reviewed metrics

- **Nameplate capacity:** 108.3 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 66568 — plant-66568

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Shady Oaks Wind 2, LLC

## Related parties

- **Developer:** Liberty — developer ([source](https://algonquinpower.com))
- **Offtaker:** JPMorgan Chase — offtaker ([source](https://www.jpmorganchase.com))
- **EPC contractor / construction contractor:** White Construction — epc_contractor
- **Parent company:** Infrastructure and Energy Alternatives — parent_company

## Sources

- [public.onboardmeetings.com](https://public.onboardmeetings.com/Meeting/wAFZFBV%2FMytGPQcAwIgSBJSvoqJv%2FhGFpJ8pY%2FJa7tEA/hV16d00j6gVGafN34cG43ZJkFZu8U0m1qQL65VhNFG4A/sbOdJPHkPqaeJQADJiMKCJ34xM8CtcZTpdOVe8gMO%2FsA/QaZ3Xhr4hkTh1GiTgs%2Fn1RC5NJoLqcRTAi9h5IgbCSUA/Agenda%20Document) — public.onboardmeetings.com · public_source — Source retained for exact-record publication review.
- [newswire.ca](https://www.newswire.ca/news-releases/liberty-and-jpmorgan-chase-collaborate-on-108-mw-wind-project-in-illinois-856221246.html) — newswire.ca · public_source — Source retained for exact-record publication review.
- [windpowerengineering.com](https://www.windpowerengineering.com/iea-awarded-construction-contract-for-illinois-wind-farm/) — windpowerengineering.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/shady-oaks-wind-2
Website: [Algonquin Power & Utilities](https://algonquinpower.com)

Source: Ask the Grid — https://askthegrid.com/
