# Solano Wind

CAISO Onshore Wind Turbine · https://askthegrid.com/assets/facilities/solano-wind

Solano Wind is a wind power facility with 300.5 MW of EIA-reported operating capacity in Solano County, California, registered as EIA Plant ID 7526. Sacramento Municipal Util Dist is the registered plant entity or operator.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 300.5 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CAISO (EIA-linked balancing-authority code: CISO)

## Source-backed facts

- Owner logo domain: smud.org — SMUD - Sacramento · confidence: medium
- Identifiers: [{"value":"7526","system":"EIA plant ID"},{"value":"7526","system":"FERC MBR plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"2B","system":"EIA generator ID"},{"value":"USWNDR_2_SMUD","system":"CAISO resource ID"},{"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"},{"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"},{"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"}] — Electric Power Monthly - U.S. Energy Information Administration (EIA) · confidence: medium
- Identifiers: [{"value":"7526","system":"EIA plant ID"},{"value":"7526","system":"FERC MBR plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"2B","system":"EIA generator ID"},{"value":"USWNDR_2_SMUD","system":"CAISO resource ID"},{"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"},{"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"},{"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"}] — MBR | Index · confidence: medium
- Identifiers: [{"value":"7526","system":"EIA plant ID"},{"value":"7526","system":"FERC MBR plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"2B","system":"EIA generator ID"},{"value":"USWNDR_2_SMUD","system":"CAISO resource ID"},{"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"},{"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"},{"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"}] — Curtailed and Non-Operational Generator AM Report Nov 27, 2019 · confidence: medium
- Identifiers: [{"value":"7526","system":"EIA plant ID"},{"value":"7526","system":"FERC MBR plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"2B","system":"EIA generator ID"},{"value":"USWNDR_2_SMUD","system":"CAISO resource ID"},{"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"},{"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"},{"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"}] — Queue Report Export · confidence: medium
- Identifiers: [{"value":"7526","system":"EIA plant ID"},{"value":"7526","system":"FERC MBR plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"2B","system":"EIA generator ID"},{"value":"USWNDR_2_SMUD","system":"CAISO resource ID"},{"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"},{"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"},{"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"}] — SMUD - Solano Wind Project Phase 3 · confidence: medium
- Owner name: Sacramento Municipal Utility District — Electric Power Monthly - U.S. Energy Information Administration (EIA) · confidence: medium
- Description: Solano Wind is an operating SMUD wind project in Solano County near Rio Vista, California. SMUD’s official May 2024 release identifies the combined Solano Wind Project at approximately 300 MW and 830 GWh of annual generation after completion of the Solano 4 phase. Solano 4 added 85.5 MW through 19 Vestas V150 turbines, while CAISO records identify the associated resources as SOLANO WIND FARM and Solano Wind Project Phase 3. — New wind turbines begin spinning advancing SMUDs zero carbon promise · confidence: medium
- Description: Solano Wind is an operating SMUD wind project in Solano County near Rio Vista, California. SMUD’s official May 2024 release identifies the combined Solano Wind Project at approximately 300 MW and 830 GWh of annual generation after completion of the Solano 4 phase. Solano 4 added 85.5 MW through 19 Vestas V150 turbines, while CAISO records identify the associated resources as SOLANO WIND FARM and Solano Wind Project Phase 3. — Solano 4 Wind Project · confidence: medium
- Description: Solano Wind is an operating SMUD wind project in Solano County near Rio Vista, California. SMUD’s official May 2024 release identifies the combined Solano Wind Project at approximately 300 MW and 830 GWh of annual generation after completion of the Solano 4 phase. Solano 4 added 85.5 MW through 19 Vestas V150 turbines, while CAISO records identify the associated resources as SOLANO WIND FARM and Solano Wind Project Phase 3. — Curtailed and Non-Operational Generator AM Report Nov 27, 2019 · confidence: medium
- Canonical name: Solano Wind — Electric Power Monthly - U.S. Energy Information Administration (EIA) · confidence: high
- Canonical name: Solano Wind — MBR | Index · confidence: high
- Identifiers.0: {"value":"7526","system":"EIA plant ID"} — Electric Power Monthly - U.S. Energy Information Administration (EIA) · confidence: high
- Identifiers.1: {"value":"7526","system":"FERC MBR plant code"} — MBR | Index · confidence: medium
- Identifiers.2: {"value":"1","system":"EIA generator ID"} — 2013 Form EIA-860 Data · confidence: medium
- Identifiers.3: {"value":"2","system":"EIA generator ID"} — Electric Power Monthly - U.S. Energy Information Administration (EIA) · confidence: high
- Identifiers.4: {"value":"2B","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.5: {"value":"USWNDR_2_SMUD","system":"CAISO resource ID"} — Curtailed and Non-Operational Generator AM Report Nov 27, 2019 · confidence: medium
- Identifiers.6: {"value":"USWNDR_2_SMUD2","system":"CAISO resource ID"} — Curtailed and Non-Operational Generator AM Report Nov 27, 2019 · confidence: medium
- Identifiers.7: {"value":"107","system":"CAISO queue position — Solano Wind Project Phase 3, 115 kV"} — Queue Report Export · confidence: medium
- Identifiers.8: {"value":"2006012017","system":"California CEQA SCH number — Solano Wind Project Phase 3"} — SMUD - Solano Wind Project Phase 3 · confidence: high
- Parties.0: {"relationship":"Owner","name":"Sacramento Municipal Utility District","official_url":"https://www.smud.org/"} — MBR | Index · confidence: medium
- Parties.0: {"relationship":"Owner","name":"Sacramento Municipal Utility District","official_url":"https://www.smud.org/"} — SMUD - Sacramento · confidence: medium
- Parties.1: {"relationship":"Operator","name":"Sacramento Municipal Utility District","official_url":"https://www.smud.org/"} — MBR | Index · confidence: medium
- Parties.1: {"relationship":"Operator","name":"Sacramento Municipal Utility District","official_url":"https://www.smud.org/"} — Solano 4 Wind Project · confidence: medium
- Parties.2: {"relationship":"Turbine OEM and full EPC contractor for Solano 4","name":"Vestas","official_url":"https://www.vestas.com/"} — Vestas secures 86 MW repowering order in the USA · confidence: high
- Interconnection: Existing Russel Substation, Solano County — Solano 4 Wind Project · confidence: medium
- Site acres: 5900 — Solano 4 Wind Project · confidence: medium
- Product url: https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw — Wind Turbines · confidence: medium
- Product url: https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw — LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf · confidence: medium
- Product url: https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw — PowerPlus® · confidence: medium
- Kind: wind — Source · confidence: high
- Manufacturer domain: vestas.com — Vestas receives 128 MW order in California, USA · confidence: high
- Manufacturer domain: vestas.com — Source · confidence: high
- Equipment models: [{"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf","count":53,"unit_mw":3,"name":"Vestas V90-3.0 MW"},{"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/brochures/vestas-powerplus/PowerPlus_Brochure.pdf.coredownload.inline.pdf","count":31,"unit_mw":1.8,"name":"Vestas V90-1.8 MW"},{"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw","count":19,"unit_mw":4.5,"name":"Vestas V150-4.5 MW"}] — Vestas receives 128 MW order in California, USA · confidence: medium
- Manufacturer name: Vestas — Vestas receives 128 MW order in California, USA · confidence: high
- Manufacturer name: Vestas — Source · confidence: high
- Equipment models.0: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf","count":53,"unit_mw":3,"name":"Vestas V90-3.0 MW"} — Vestas receives 128 MW order in California, USA · confidence: medium
- Equipment models.1: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/brochures/vestas-powerplus/PowerPlus_Brochure.pdf.coredownload.inline.pdf","count":31,"unit_mw":1.8,"name":"Vestas V90-1.8 MW"} — Vestas receives 128 MW order in California, USA · confidence: high
- Equipment models.1: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/brochures/vestas-powerplus/PowerPlus_Brochure.pdf.coredownload.inline.pdf","count":31,"unit_mw":1.8,"name":"Vestas V90-1.8 MW"} — PowerPlus® · confidence: high
- Equipment models.2: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw","count":19,"unit_mw":4.5,"name":"Vestas V150-4.5 MW"} — Source · confidence: high
- Equipment models.2: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/4-mw-platform/v150-4-5-mw","count":19,"unit_mw":4.5,"name":"Vestas V150-4.5 MW"} — Wind Turbines · confidence: high
- Quality notes: ["The 2011 transaction applied to Solano Wind Phase 3 rather than the entire multi-phase project; SMUD continued to purchase all Phase 3 output and later repurchased the plant.","The disclosed $288 million figure is the Phase 3 sale consideration. SMUD’s financial statements separately describe financing-agreement accounting, a $28 million 2011 deposit, and $63.1 million of proceeds received in 2013.","Capacity figures are scope-specific: Phase 3 is documented at 128 MW, Solano 4 at 85.5 MW, and SMUD reports the combined post-Solano 4 project at approximately 300 MW."] — Source · confidence: high
- Quality notes: ["The 2011 transaction applied to Solano Wind Phase 3 rather than the entire multi-phase project; SMUD continued to purchase all Phase 3 output and later repurchased the plant.","The disclosed $288 million figure is the Phase 3 sale consideration. SMUD’s financial statements separately describe financing-agreement accounting, a $28 million 2011 deposit, and $63.1 million of proceeds received in 2013.","Capacity figures are scope-specific: Phase 3 is documented at 128 MW, Solano 4 at 85.5 MW, and SMUD reports the combined post-Solano 4 project at approximately 300 MW."] — Table of Contents · confidence: high
- Financing summary: In December 2011, SMUD sold the nearly completed 128 MW Solano Wind Phase 3 to Citigroup for $288 million. The structure gave Citigroup the benefits available to a tax-paying renewable-energy owner, while SMUD purchased all Phase 3 output under a power purchase agreement and held repurchase options at the sixth, eighth, or fifteenth anniversary of commercial operation. SMUD expected the transaction to save customers $60 million to $70 million over six years. SMUD’s audited financial statements accounted for the transaction as a financing agreement, recorded a $28 million deposit in 2011, and reported $63.1 million of sale proceeds received in 2013; these amounts are separate from the disclosed $288 million sale consideration. SMUD exercised the six-year repurchase option and completed the ownership transfer in April 2018. — Source · confidence: high
- Financing summary: In December 2011, SMUD sold the nearly completed 128 MW Solano Wind Phase 3 to Citigroup for $288 million. The structure gave Citigroup the benefits available to a tax-paying renewable-energy owner, while SMUD purchased all Phase 3 output under a power purchase agreement and held repurchase options at the sixth, eighth, or fifteenth anniversary of commercial operation. SMUD expected the transaction to save customers $60 million to $70 million over six years. SMUD’s audited financial statements accounted for the transaction as a financing agreement, recorded a $28 million deposit in 2011, and reported $63.1 million of sale proceeds received in 2013; these amounts are separate from the disclosed $288 million sale consideration. SMUD exercised the six-year repurchase option and completed the ownership transfer in April 2018. — Table of Contents · confidence: high
- Quality notes.0: The 2011 transaction applied to Solano Wind Phase 3 rather than the entire multi-phase project; SMUD continued to purchase all Phase 3 output and later repurchased the plant. — Source · confidence: high
- Quality notes.1: The disclosed $288 million figure is the Phase 3 sale consideration. SMUD’s financial statements separately describe financing-agreement accounting, a $28 million 2011 deposit, and $63.1 million of proceeds received in 2013. — Table of Contents · confidence: high
- Quality notes.2: Capacity figures are scope-specific: Phase 3 is documented at 128 MW, Solano 4 at 85.5 MW, and SMUD reports the combined post-Solano 4 project at approximately 300 MW. — Solano Wind Project Phase 3 · confidence: high
- Quality notes.2: Capacity figures are scope-specific: Phase 3 is documented at 128 MW, Solano 4 at 85.5 MW, and SMUD reports the combined post-Solano 4 project at approximately 300 MW. — Source · confidence: high
- Commercial parties.2: {"relationship":"Parent of former Phase 3 purchaser","name":"Citigroup","detail":"Citigroup purchased the 128 MW Phase 3 expansion for $288 million through its subsidiary and benefited from the tax-owner structure of the transaction.","official_url":"https://www.citigroup.com/"} — Source · confidence: high
- Commercial parties.3: {"relationship":"Turbine OEM and EPC contractor","name":"Vestas","detail":"Supplied the 19 V150-4.5 MW turbines for Solano 4 and provided the full engineering, procurement, construction, delivery, installation, commissioning, and long-term service package.","official_url":"https://www.vestas.com/"} — Vestas secures 86 MW repowering order in the USA · confidence: high
- Timeline.0: {"event":"Initial wind generation installed","date":"1994","detail":"SMUD first installed wind generation on its Solano County property."} — SMUD wind power plant expansion adds 15 new turbines · confidence: medium
- Timeline.1: {"event":"Early project expansion","date":"2003-05","detail":"Fifteen new turbines began producing an additional 10 MW for SMUD customers; the expansion was reported as producing power ahead of its scheduled commercial-production date."} — SMUD wind power plant expansion adds 15 new turbines · confidence: medium
- Timeline.2: {"event":"Solano Phase 2A commissioned","date":"2006-05","detail":"Phase 2A was commissioned with eight 3.0 MW Vestas V-90 wind turbine generators."} — Finding of No Significant Impact · confidence: medium
- Timeline.3: {"event":"Phases 1 and 2 operating milestone","date":"2007","detail":"SMUD’s environmental documentation states that its existing Phases 1 and 2 had installed 102 MW of wind capacity since 2007."} — Solano Wind Project Phase 3 · confidence: medium

## Timeline

- 1994 — Initial wind generation installed
  SMUD first installed wind generation on its Solano County property.
  Source: SMUD wind power plant expansion adds 15 new turbines (https://www.power-eng.com/renewables/wind-energy/smud-wind-power-plant-expansion-adds-15-new-turbines/)
- 2003-05 — Early project expansion
  Fifteen new turbines began producing an additional 10 MW for SMUD customers; the expansion was reported as producing power ahead of its scheduled commercial-production date.
  Source: SMUD wind power plant expansion adds 15 new turbines (https://www.power-eng.com/renewables/wind-energy/smud-wind-power-plant-expansion-adds-15-new-turbines/)
- 2007 — Phases 1 and 2 operating milestone
  SMUD’s environmental documentation states that its existing Phases 1 and 2 had installed 102 MW of wind capacity since 2007.
  Source: Solano Wind Project Phase 3 (https://ceqanet.lci.ca.gov/2006012017/3)
- 2012-05 — Phase 3 completion
  SMUD announced completion of Phase 3. The phase comprised 55 turbines, added 128 MW, was completed on time and $5 million under budget, and brought the project to 230 MW at that stage.
  Source: SMUD completes Solano Wind Project (https://www.power-eng.com/renewables/wind-energy/smud-completes-solano-wind-project/)
- 2020 — Solano 4 construction began
  Construction of the Solano 4 repowering project began in late 2020.
  Source: Source (https://smud.org/Corporate/Environmental-Leadership/Power-Sources/Solano-4-Wind)
- 2024-05 — Solano 4 entered operation
  Solano 4 replaced 23 older turbines with 19 Vestas V150 turbines and entered commercial operation in spring 2024, adding 85.5 MW.
  Source: Source (https://smud.org/Corporate/About-us/News-and-Media/2024/2024/New-wind-turbines-begin-spinning-advancing-SMUDs-zero-carbon-promise)

## Sources

- [SMUD - Sacramento](https://www.smud.org/) — smud.org · tier other
- [Electric Power Monthly - U.S. Energy Information Administration (EIA)](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06) — eia.gov · tier regulatory
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=309) — mbrweb.ferc.gov · tier regulatory
- [Curtailed and Non-Operational Generator AM Report Nov 27, 2019](https://www.caiso.com/documents/curtailed-non-operational-generator-am-report-20191127.html) — caiso.com · tier other
- [Queue Report Export](https://www.caiso.com/documents/publicqueuereport.pdf) — caiso.com · tier other
- [SMUD - Solano Wind Project Phase 3](https://ceqanet.lci.ca.gov/2006012017) — ceqanet.lci.ca.gov · tier regulatory
- [New wind turbines begin spinning advancing SMUDs zero carbon promise](https://www.smud.org/Corporate/About-us/News-and-Media/2024/2024/New-wind-turbines-begin-spinning-advancing-SMUDs-zero-carbon-promise) — smud.org · tier other
- [Solano 4 Wind Project](https://www.smud.org/Corporate/Environmental-Leadership/Power-Sources/Solano-4-Wind) — smud.org · tier other
- [Vestas secures 86 MW repowering order in the USA](https://www.vestas.com/en/media/company-news/2022/vestas-secures-86-mw-repowering-order-in-the-usa-c3593431) — vestas.com · tier other
- [2013 Form EIA-860 Data](https://downloads.regulations.gov/OSHA-H005C-2006-0870-0430/attachment_4.pdf) — downloads.regulations.gov · tier regulatory
- [Vestas receives 128 MW order in California, USA](https://news.cision.com/vestas-wind-systems-a-s/r/vestas-receives-128-mw-order-in-california--usa,c2964508) — news.cision.com · tier other
- [Source](https://vestas.com/en/media/company-news/2022/vestas-secures-86-mw-repowering-order-in-the-usa-c3593431) — vestas.com · tier other
- [Source](https://smud.org/Corporate/Environmental-Leadership/Power-Sources/Solano-4-Wind) — smud.org · tier other
- [Wind Turbines](https://us.vestas.com/en-us/products) — us.vestas.com · tier other
- [LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf](https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA_V903MW_version_1_1.pdf.coredownload.inline.pdf) — vestas.com · tier other
- [PowerPlus®](https://www.vestas.com/content/dam/vestas-com/global/en/brochures/vestas-powerplus/PowerPlus_Brochure.pdf.coredownload.inline.pdf) — vestas.com · tier other
- [Source](https://smud.org/Corporate/About-us/News-and-Media/2024/2024/New-wind-turbines-begin-spinning-advancing-SMUDs-zero-carbon-promise) — smud.org · tier other
- [Solano Wind Project Phase 3](https://ceqanet.lci.ca.gov/2006012017/3) — ceqanet.lci.ca.gov · tier regulatory
- [Information Packet - SMUD Board Finance & Audit Committee and Special Board of Directors Meeting - June 15, 2021](https://www.smud.org/-/media/Documents/Corporate/About-Us/Board-Meetings-and-Agendas/2021/Jun/Finance-Audit-Info-Packet---Jun-15-2021.ashx) — smud.org · tier other
- [Source](https://www.nrc.gov/docs/ML1216/ML12163A409.pdf) — nrc.gov · tier regulatory
- [Table of Contents](https://www.smud.org/es/-/media/Documents/Corporate/About-Us/Company-Information/Reports-and-Documents/2014-2021/2015/2015-Audited-Financials.ashx) — smud.org · tier other
- [SMUD wind power plant expansion adds 15 new turbines](https://www.power-eng.com/renewables/wind-energy/smud-wind-power-plant-expansion-adds-15-new-turbines/) — power-eng.com · tier other
- [Finding of No Significant Impact](https://www.fws.gov/sites/default/files/documents/FONSI-and-EA_Solano-Wind-eagle-permit.pdf) — fws.gov · tier regulatory
- [Source](https://www.smud.org/-/media/Documents/Corporate/About-Us/Company-Information/Reports-and-Documents/2014-2021/2017/SMUD-2017-Audit-Final_03_12_18.ashx) — smud.org · tier other
- [SMUD completes Solano Wind Project](https://www.power-eng.com/renewables/wind-energy/smud-completes-solano-wind-project/) — power-eng.com · tier other
- [Source](https://www.smud.org/-/media/About-Us/Newsletters/Reports-and-Statements/2018-Annual-Report/AnnualReportFinancials2018.ashx) — smud.org · tier other
- [Solano 5 Wind Repower Project](https://www.smud.org/Corporate/Environmental-Leadership/Power-Sources/Solano-5-Wind-Repower-Project) — smud.org · tier other

## Data quality

- The 2011 transaction applied to Solano Wind Phase 3 rather than the entire multi-phase project; SMUD continued to purchase all Phase 3 output and later repurchased the plant. Capacity figures are scope-specific: Phase 3 is documented at 128 MW, Solano 4 at 85.5 MW, and SMUD reports the combined post-Solano 4 project at approximately 300 MW.

---