# STACK Infrastructure DFW02 Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/stack-infrastructure-dfw02-data-center-campus--grid-load-49ae35c0c7964242

STACK Infrastructure is building the DFW02 data center campus in Lancaster, Dallas County, Texas, on a marketed 193 acres. News reported on October 30, 2026 that construction was underway on DFW02A-P2. STACK's brochure lists 312 MW of critical capacity, expandable to 504 MW, with committed power from Oncor through a dedicated on-site substation. Earlier plans listed smaller totals. State registrations cover three buildings of about 360,000 square feet each.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 1000 E Beltline Road, Lancaster, Dallas County County, TX
- Operator: STACK Infrastructure (exact asset)
- Developer: SI DFW02A, LLC (exact asset)

## Power and grid context

- Critical it load: 312 MW · proposed · campus — Campus critical capacity in the expanded-campus brochure
- Critical it load: Up to 504 MW · proposed · campus — Marketed expansion ceiling for critical capacity
- Reported unspecified: 54 MW · proposed · phase · DFW02B — Second building as reported from a STACK sales brochure
- ISO/RTO: ERCOT
- Electric utility: Oncor
- Substation: Dedicated on-site substation with committed Oncor power

## Compute and operations

- Critical IT load: 312 MW

## Sources

- [Vercel Security Checkpoint](https://www.groundbreak.city/dfw/stack-dfw02a-p2-data-center-under-construction-lancaster)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2025010772)
- [www.stackinfra.com](https://www.stackinfra.com/wp-content/uploads/2024/10/DFW02-Campus-Brochure_web.pdf)
- [Just a moment...](https://www.datacenterdynamics.com/en/news/stack-files-for-second-building-at-lancaster-campus-texas/)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2027002755)
- [https://public.destinyhosted.com/lancadocs/2024/CCREG/20240408_2096/932_BO_Stack%20380%20Grant.pdf](https://public.destinyhosted.com/lancadocs/2024/CCREG/20240408_2096/932_BO_Stack%20380%20Grant.pdf)
- [STACK Adds 220MW South Dallas Campus | STACK](https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-texas-footprint-with-a-new-220mw-flagship-south-dallas-campus/)
- [www.stackinfra.com](https://www.stackinfra.com/wp-content/uploads/2024/04/DFW02-Brochure_6.25.2024.pdf)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1000+E+Beltline+Road%2C+Lancaster%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1000+E+Beltline+Road%2C+Lancaster%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026008287)
- [https://public.destinyhosted.com/lancadocs/2024/CCREG/20240408_2096/4736_380_Agreement_-_Stack_-_Final_-_3-28-24.pdf](https://public.destinyhosted.com/lancadocs/2024/CCREG/20240408_2096/4736_380_Agreement_-_Stack_-_Final_-_3-28-24.pdf)

---

Canonical page: https://askthegrid.com/assets/facilities/stack-infrastructure-dfw02-data-center-campus--grid-load-49ae35c0c7964242
Profile generated: 2026-11-02T22:41:39.533164Z
Source: Ask the Grid — https://askthegrid.com/