STACK’s NAL01 campus in New Albany comprises NAL01A and the NAL01B expansion. The operator lists a 40-acre campus, with 156,000 square feet for A and 354,000 square feet for B. NAL01B is marketed for shell and turnkey deployments with committed power, dual utility feeds and liquid-to-chip cooling options. Its brochure describes 51 MW of future critical capacity; this is not measured demand. The campus’s historic address is 7300 Souder Road. Building-specific design specifications remain separate rather than being applied to every facility on the site.

## Identity and location

- Operating status: unknown
- Asset scope: campus
- Location: 7300 Souder Road, New Albany, OH
- Operator: STACK Infrastructure (exact asset) — https://www.stackinfra.com/locations/americas/new-albany/nal01/

## Development

- Site status: STACK lists NAL01A at156,000 square feet and NAL01B at354,000 square feet. The NAL01B brochure describes a17-acre expansion site within the established campus; this is not the full campus acreage.
- Site area: 40 acres
- Buildings: 2
- Construction: NAL01B is marketed as future standalone capacity supporting shell and turnkey deployments. The reviewed brochure does not establish a completed opening date.

## Compute and operations

- Operating context: The expansion is marketed for AI and cloud infrastructure, including shell and turnkey deployments.

## Sources

- [https://www.stackinfra.com/locations/americas/new-albany/nal01/](https://www.stackinfra.com/locations/americas/new-albany/nal01/)
- [https://www.stackinfra.com/wp-content/uploads/2022/02/STACK_Authorized_User_Form.pdf](https://www.stackinfra.com/wp-content/uploads/2022/02/STACK_Authorized_User_Form.pdf)
- [https://www.stackinfra.com/wp-content/uploads/2024/10/NAL01B-Brochure_Web.pdf](https://www.stackinfra.com/wp-content/uploads/2024/10/NAL01B-Brochure_Web.pdf)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/stack-new-albany-nal01-campus
Profile generated: 2026-09-05T22:13:12.206319Z
Source: Ask the Grid — https://askthegrid.com/