Enel's Ellis County solar-and-storage project at Saltillo

Stampede is Enel's solar-and-storage project in Ellis County. EIA's June 2026 inventory records 255.9 MW of solar nameplate plus a 72.2 MW / 115 MWh battery; Enel separately markets the project on DC bases as 326 MWdc solar and 86 MWdc storage.

## Profile

- **Date difference:** Enel says solar began producing in June 2024 and announced project operations in August while storage remained in final commissioning. EIA assigns October 2024 to the battery and November 2025 to the solar generator.
- **Planned equipment:** The 2021 SGIA describes a planned inverter design, not the final as-built equipment.

## Metrics

- **Plant nameplate:** 328.1 MW — EIA total: 255.9 MW solar plus 72.2 MW battery.
- **Solar nameplate:** 255.9 MW AC — EIA registry; separate from Enel's 326 MWdc basis.
- **Battery:** 72.2 MW / 115 MWh — EIA registry; approximately 1.59 hours.
- **Renewable attributes:** >522,000 MWh/year — 15-year Nestlé agreement.

## Facts

- **Developer:** Enel North America
- **Tax equity / attribute buyer:** Nestlé
- **POI:** Saltillo 345 kV Switching Station

## Related parties

- **Developer / operator:** Enel North America — Official project release ([source](https://www.enelnorthamerica.com/about-us/newsroom/search-press/press/2024/08/stampede-nestle))
- **Tax equity / attribute buyer:** Nestlé — Official Enel agreement announcement ([source](https://www.enelnorthamerica.com/about-us/newsroom/search-press/press/2024/08/stampede-nestle))

---