# Stanton Energy Reliability Center Hybrid

CAISO Batteries, Natural Gas Fired Combustion Turbine · https://askthegrid.com/assets/facilities/stanton-energy-reliability-center-hybrid

Stanton Energy Reliability Center Hybrid is a hybrid natural gas generation and battery storage facility with 161 MW of EIA-reported total operating capacity and 8.6 MWh of reported storage energy capacity in Orange County, California, registered as EIA Plant ID 60698. SERC is identified as the first new-build application of the Hybrid Enhanced Gas Turbine (Hybrid EGT) technology, combining GE LM6000 simple-cycle generation with integrated lithium-ion battery storage. It was developed as a local-reliability resource for the West Los Angeles Basin area of Southern California Edison’s service territory.

## Key facts

- Technology: Batteries, Natural Gas Fired Combustion Turbine
- Power capacity: 161 MW
- Energy capacity: 8.6 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO (CAISO)
- Substation: Barre Substation
- Point of interconnection: Barre Substation
- Transmission owner: Southern California Edison Company (SCE)
- Interconnection voltage: 66 kV

## Source-backed facts

- Identifiers: [{"value":"60698","system":"EIA Plant ID"},{"value":"CISO","system":"EIA Balancing Authority"},{"value":"CAISO","system":"Power Market"},{"value":"16-AFC-01","system":"California Energy Commission Docket"}] — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Description: Stanton Energy Reliability Center Hybrid is an operational gas-and-battery power plant in Orange County, California, with four generating units totaling 161 MW and its first unit online July 1, 2020. The SERC facility is located at 10711 Dale Avenue in Stanton and uses two GE LM6000 simple-cycle combustion turbines integrated with lithium-ion battery systems. The California Energy Commission records commercial operation on October 6, 2020 under docket 16-AFC-01. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Identifiers.3: {"value":"16-AFC-01","system":"California Energy Commission Docket"} — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Parties.5: {"relationship":"Independent engineer and construction-monitoring provider","name":"E3","official_url":null} — Stanton Energy Reliability Center - NAES · confidence: high
- Parties.9: {"relationship":"Emission Reduction Unit vendor","name":"Mitsubishi Power Americas","official_url":null} — Stanton Energy Reliability Center Hybrid Supplies Power When Southern California Needs It Most · confidence: high
- Unit configuration: Natural-gas-fired simple-cycle hybrid consisting of two GE LM6000 Hybrid EGT combustion turbines, each integrated with a 10 MW lithium-ion battery system; total battery capacity is 20 MW / 8.6 MWh. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Commercial operation date: 2020-10-06 — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Duration hours: 0.43 — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Energy mwh: 8.6 — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Construction scope: Two natural-gas-fired General Electric LM6000 PC SPRINT simple-cycle combustion-turbine generator units, each rated at 51.049 MW gross, integrated with two 10 MW/4.3 MWh lithium-ion BESS sets housed in two purpose-built battery enclosures. The facility also includes water injection, SCR and oxidation-catalyst emissions controls, synchronous-condensing capability, and associated support equipment. — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Product url: https://www.gevernova.com/gas-power/services/gas-turbines/upgrades/hybrid-egt — LM6000 Hybrid EGT | GE Vernova · confidence: medium
- Kind: other — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Containers: 2 — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Containers: 2 — Stanton Energy Reliability Center · confidence: high
- Manufacturer domain: gevernova.com — DOCKETED · confidence: medium
- Product family: LM6000 Hybrid EGT / LM6000 PC SPRINT — DOCKETED · confidence: medium
- Manufacturer name: General Electric (GE) — Stanton Energy Reliability Center | California Energy Commission · confidence: high
- Equipment models.0: {"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/gas-turbines/lm6000","count":2,"unit_mw":51.049,"name":"LM6000 PC SPRINT hybrid-enhanced gas turbine"} — DOCKETED · confidence: high
- Equipment models.1: {"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/services/gas-turbines/upgrades/hybrid-egt","count":2,"unit_mw":10,"name":"Hybrid EGT integrated lithium-ion BESS"} — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Quality notes: ["EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Quality notes: ["EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Source · confidence: medium
- Quality notes: ["EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Stanton Energy Reliability Center - NAES · confidence: medium
- Financing summary: E3 provided financing-related technical support, including a project-financing role and later construction monitoring on behalf of lenders. The cited materials do not disclose a financing amount, financing instrument, financial-close date, or lender names. Vanir separately reports a $30 million construction cost for work started in 2019 and completed in 2020; that figure is not identified as project financing or sale consideration. — Stanton Energy Reliability Center - NAES · confidence: medium
- Quality notes.0: EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Quality notes.0: EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Source · confidence: medium
- Quality notes.0: EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system. — Stanton Energy Reliability Center - NAES · confidence: medium
- Quality notes.1: Commercial-operation dates vary by scope: the gas facility is reported as operating in July 2020, the BESS soon thereafter, and the CEC records the project commercial-operation date as October 6, 2020. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Quality notes.1: Commercial-operation dates vary by scope: the gas facility is reported as operating in July 2020, the BESS soon thereafter, and the CEC records the project commercial-operation date as October 6, 2020. — Stanton Energy Reliability Center - NAES · confidence: medium
- Quality notes.2: A 2018 interconnection filing proposed adding a 20 MW inverter-based battery facility that would have produced a 170 MW project, but the cited filing does not establish the completion date or final relationship of that proposal to the current 161 MW EIA record. — Source · confidence: medium
- Quality notes.3: Public project materials identify original joint-venture ownership and project financing support, but disclose no buyer, seller, acquisition consideration, sale date, or completed ownership-transfer transaction. — Stanton Energy Reliability Center - NAES · confidence: medium
- Commercial parties.6: {"relationship":"Independent engineer and construction-monitoring provider","name":"E3 Consulting","detail":"Served as independent engineer, supported the financing process, and provided construction monitoring on behalf of lenders.","official_url":"https://www.e3co.com"} — Stanton Energy Reliability Center - NAES · confidence: medium
- Commercial parties.7: {"relationship":"Interconnection and distribution counterparty","name":"Southern California Edison Company","detail":"Was the distribution provider and counterparty to the Stanton Energy Reliability Center generator interconnection agreement; SERC was developed to support reliability in the SCE West Los Angeles Basin area.","official_url":"https://www.sce.com"} — Stanton Energy Reliability Center | Vanir · confidence: medium
- Substation: Barre Substation — Source · confidence: high
- Interconnection voltage kv: 66 — Source · confidence: medium
- Status detail: The exact EIA plant is currently operational, with four operational generators totaling 161 MW. The underlying Stanton facility is a 98 MW natural-gas hybrid project with two GE LM6000 turbines and integrated batteries. CAISO records identify Stanton 1 and Stanton 2 as resources STANTN_2_STAGT1 and STANTN_2_STAGT2; a July 2025 CAISO report showed Stanton 2 in a forced/curtailed condition, which is an outage status rather than a retirement or mothball designation. No formally announced retirement, deactivation, seasonal-operation date, or repowering plan is supported by the retrieved records. — Stanton Energy Reliability Center | California Energy Commission · confidence: medium
- Status detail: The exact EIA plant is currently operational, with four operational generators totaling 161 MW. The underlying Stanton facility is a 98 MW natural-gas hybrid project with two GE LM6000 turbines and integrated batteries. CAISO records identify Stanton 1 and Stanton 2 as resources STANTN_2_STAGT1 and STANTN_2_STAGT2; a July 2025 CAISO report showed Stanton 2 in a forced/curtailed condition, which is an outage status rather than a retirement or mothball designation. No formally announced retirement, deactivation, seasonal-operation date, or repowering plan is supported by the retrieved records. — Curtailed · confidence: medium
- Grid role: Local-reliability and peaking generation for SCE's West Los Angeles Basin subarea, with integrated battery storage providing fast grid-support capability. — Stanton Energy Reliability Center · confidence: high
- Operating status: operating — Stanton Energy Reliability Center | California Energy Commission · confidence: high

## Timeline

- 2018-05-08 — Interconnection modification proposed
  A Southern California Edison interconnection filing described a proposal to add a 20 MW inverter-based battery facility, resulting in a proposed total project capacity of 170 MW.
  Source: Source (https://efiling.energy.ca.gov/GetDocument.aspx?tn=223402&DocumentContentId=23615)
- 2018-11-07 — CEC certification
  The California Energy Commission certified the Stanton Energy Reliability Center under docket 16-AFC-01.
  Source: Stanton Energy Reliability Center | California Energy Commission (https://www.energy.ca.gov/powerplant/simple-cycle/stanton-energy-reliability-center)
- 2020-07 — Gas facility commercial operation
  NAES reported that the gas facility achieved commercial operation in July 2020, with the BESS reaching commercial operation soon thereafter; the EIA-derived plant record identifies the first unit as online July 1, 2020.
  Source: Stanton Energy Reliability Center - NAES (https://www.naes.com/stanton-energy-reliability-center/)
- 2020-10-06 — CEC-recorded commercial operation
  The California Energy Commission records October 6, 2020 as the project’s commercial-operation date.
  Source: Stanton Energy Reliability Center | California Energy Commission (https://www.energy.ca.gov/powerplant/simple-cycle/stanton-energy-reliability-center)

## Sources

- [Stanton Energy Reliability Center | California Energy Commission](https://www.energy.ca.gov/powerplant/simple-cycle/stanton-energy-reliability-center) — energy.ca.gov · tier regulatory
- [Stanton Energy Reliability Center Hybrid Supplies Power When Southern California Needs It Most](https://www.powermag.com/stanton-energy-reliability-center-hybrid-supplies-power-when-southern-california-needs-it-most/) — powermag.com · tier other
- [Stanton Energy Reliability Center - NAES](https://www.naes.com/stanton-energy-reliability-center/) — naes.com · tier other
- [VIDEO: California PUC mostly approves energy storage deals for ...](https://www.renewableenergyworld.com/energy-storage/california-puc-mostly-approves-energy-storage-deals-for-sce-pg-e/) — renewableenergyworld.com · tier other
- [DOCKETED](https://efiling.energy.ca.gov/GetDocument.aspx?tn=222519&DocumentContentId=23568) — efiling.energy.ca.gov · tier regulatory
- [LM6000 Hybrid EGT | GE Vernova](https://www.gevernova.com/gas-power/services/gas-turbines/upgrades/hybrid-egt) — gevernova.com · tier other
- [Stanton Energy Reliability Center](https://ceqanet.lci.ca.gov/2018119007) — ceqanet.lci.ca.gov · tier regulatory
- [Source](https://efiling.energy.ca.gov/GetDocument.aspx?tn=223402&DocumentContentId=23615) — efiling.energy.ca.gov · tier regulatory
- [Stanton Energy Reliability Center | Vanir](https://www.vanir.com/projects/stanton-energy-reliability-center/) — vanir.com · tier other
- [Source](https://efiling.energy.ca.gov/GetDocument.aspx?tn=214206-5&DocumentContentId=23413) — efiling.energy.ca.gov · tier regulatory
- [Announced Resource Retirement and Mothball List posted | California ISO](https://www.caiso.com/notices/announced-resource-retirement-and-mothball-list-posted-4) — caiso.com · tier other
- [Curtailed](https://www.caiso.com/documents/curtailed-non-operational-generator-am-report-20250712.xlsx) — caiso.com · tier other
- [Local Capacity Requirements (“LCR”) RFO | SCE](https://www.sce.com/about-sce/energy-procurement/solicitations/archive/lcr-rfo) — sce.com · tier other

## Data quality

- EIA plant data report 161 MW and four units, while CEC and project materials describe the SERC configuration as 98 MW with a 20 MW battery system; Commercial-operation dates vary by scope: the gas facility is reported as operating in July 2020, the BESS soon thereafter, and the CEC records the project commercial-operation date as October 6, 2020. A 2018 interconnection filing proposed adding a 20 MW inverter-based battery facility that would have produced a 170 MW project, but the cited filing does not establish the completion date or final relationship of that proposal to the current 161 MW EIA record. Public project materials identify original joint-venture ownership and project financing support, but disclose no buyer, seller, acquisition consideration, sale date, or completed ownership-transfer transaction. The $30 million figure reported by Vanir is identified as construction cost, not as debt financing, sale consideration, or a portfolio transaction value.

---