# Stephens Ranch Wind Energy LLC

ERCOT asset profile · https://askthegrid.com/assets/facilities/stephens-ranch-wind-energy-llc

Lotus Infrastructure · Borden and Lynn counties · ERCOT

Stephens Ranch Wind Energy is a 376 MW, two-phase wind project in Borden and Lynn counties, Texas. EIA's May 2026 inventory carries separate 211 MW and 165 MW plant records dated December 2014 and April 2015; those registry dates are shown separately from the developer's commercial-operation dates. Lotus identifies the project as a current investment.

## Profile

- **Grid role:** Two-phase utility-scale wind generation in ERCOT.
- **Phase I:** 211 MW · commercial operation November 2014 · 118 GE 1.79 MW turbines.
- **Phase II:** 165 MW · commercial operation May 2015.
- **Registry scope:** EIA carries 211 MW and 165 MW records dated December 2014 and April 2015.

## Metrics

- **Project capacity:** 376 MW — 211 MW + 165 MW
- **Phase I:** 211 MW — Commercial November 2014
- **Phase II:** 165 MW — Commercial May 2015
- **Phase I turbines:** 118 — GE 1.79 MW
- **Phase I construction debt:** $265M — Exact phase scope
- **Registry anchor:** Plant 57983 — Borden County record

## Facts

- **Phase I construction debt:** $265 million — Lotus financing announcement · confidence: high

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Lotus Stephens Ranch investment record](https://www.lotusinfrastructure.com/our-investments/) — Lotus Infrastructure · official — Current investment status, two-phase capacity, and project location.
- [Lotus Phase I operating announcement](https://www.lotusinfrastructure.com/news/lotus-stephens-ranch-wind-project-phase-i-in-texas-becomes-operational/) — Lotus Infrastructure · official — Phase I capacity, commercial-operation month, turbine count, EPC contractor, and site scope.
- [Lotus Phase II operating announcement](https://www.lotusinfrastructure.com/news/stephens-ranch-wind-project-phase-ii-becomes-operational/) — Lotus Infrastructure · official — Phase II capacity and commercial-operation month.

---

Canonical page: https://askthegrid.com/assets/facilities/stephens-ranch-wind-energy-llc
Website: [Lotus Infrastructure](https://lotusinfrastructure.com/)
Profile published: 2026-07-17T03:34:50.809Z
Source: Ask the Grid — https://askthegrid.com/