Stream Data Centers operates the DFWA facility at 1813 Lookout Drive in Garland, Texas, which was commissioned in January 2020 and expanded to 275,000 square feet. The facility provides 43 MW of critical capacity and was fully leased by a major cloud customer in 2023.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 1813 Lookout Drive, Garland, Dallas County, TX
- Operator: Stream Data Centers (exact asset) — https://www.streamdatacenters.com/locations/dallas-data-centers/
- Developer: Stream Data Centers (exact asset) — https://www.streamdatacenters.com/locations/dallas-data-centers/

## Power and grid context

- Utility service: 95 MW · reported · exact asset · DFWA1 — On-site Oncor substation reported for the expanded DFWA facility; this is substation capacity, not the facility's critical IT load.
- Utility service: 80 MW · reported · exact asset · DFW VII — Two 40 MW utility feeds, with 40 MW reserved from each of two 47.5 MVA transformers; reported as redundant utility-feed capacity and not as critical IT load.
- Critical it load: 15 MW · reported · phase · DFW VII — Original DFW VII facility design supports 15 MW of 2N critical load.
- Critical it load: 30 MW · target · phase · DFW VII — Original DFW VII brochure describes expansion capability to more than 30 MW of critical load.
- Critical it load: 43 MW · reported · exact asset · DFWA1 — Stream reports 43 MW of critical capacity for the expanded 275,000-square-foot DFWA facility at full build.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: Oncor Electric Delivery (Oncor)
- Point of interconnection: The facility connects through the on-site Oncor substation adjacent to the property, using direct underground feeds from the substation transformers; the exact named electrical point of interconnection was not identified.
- Substation: On-site Oncor substation; the operator reports a 95 MW substation serving DFWA, but no DFWA-specific public name was identified.

## Development

- Site status: Operating and fully leased; the expanded DFWA facility is described by Stream as a 275,000-square-foot hyperscale data center with 43 MW of capacity. The initial DFW VII phase was commissioned in January 2020.
- Site area: 23 acres
- Gross floor area: 275,000 square feet
- Construction: Stream commissioned the first phase, DFW VII, in January 2020 as a 138,132-square-foot facility on a roughly 23-acre Garland site. Subsequent work included Phase 2 and Phase 3 interior/data-hall fit-outs and a master-planned expansion at 1717 Lookout Drive. Stream describes the resulting DFWA1 expanded facility as 275,000 square feet with 43 MW of critical capacity; the entire facility was fully leased in 2023.

## Compute and operations

- Facility classes: hyperscale, colocation, cloud
- Workloads: hyperscale cloud computing, colocation
- Announced tenants: Unnamed major cloud customer
- Critical IT load: 43 MW
- Operating context: Operating Stream Data Centers hyperscale facility at 1813 Lookout Drive, Garland. DFW VII was commissioned in January 2020; the expanded DFWA1 building provides 43 MW of critical capacity and approximately 275,000 square feet. The facility was fully leased to a major cloud customer in 2023.

## Sources

- [http://electricityrates.com/texas/ercot](http://electricityrates.com/texas/ercot)
- [Stream: DFWA-1 Data Center](https://baxtel.com/data-center/stream-dfwa-1)
- [Data Centers in Texas](https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php)
- [Stream Data Centers DFW VII | 1813 Lookout Drive, Dallas ...](https://datacenterhawk.com/marketplace/providers/stream-data-centers/1813-lookout-drive/dfw-vii)
- [Fetched web page](https://images1.showcase.com/d2/07m1sipwj3hc-0lmFGuMiRAM4ZCKZhT69ZBsrVah1pQ/document.pdf)
- [Stream Data Center DFW VII | JE Dunn Construction](https://jedunn.com/projects/stream-data-center-dfw-vii/)
- [Stream Data Centers GRL-STREAM-DFW7 — Garland, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/garland/grl-stream-dfw7/)
- [Stream Data Centers TABS2021018683 — Garland, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/garland/tabs2021018683/)
- [Stream Data Centers TABS2022007231 — Garland, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/garland/tabs2022007231/)
- [Dallas TX1 Data Center](https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center)
- [Stream DC DFW VII - Garland - Specs](https://www.datacentermap.com/usa/texas/dallas/dfw-garland/specs/)
- [Stream Data Centers: DFW VII Data Center](https://www.datacenters.com/stream-dfw-vii)
- [Fetched web page](https://www.ercot.com/files/docs/2017/01/24/GPL_N-GRIP_Report_JAN2017_v8.pdf)
- [Meeting Agendas and Minutes | Garland, TX](https://www.garlandtx.gov/801/Meeting-Agendas-and-Minutes)
- [1813 Lookout Dr, Garland, TX 75044 | LoopNet](https://www.loopnet.com/Listing/1813-Lookout-Dr-Garland-TX/17397302/)
- [Judge Graham Reports ‘No Audible Noise’ at Garland Data Centers | Olney Enterprise](https://www.olneyenterprise.com/news/judge-graham-reports-%E2%80%98no-audible-noise%E2%80%99-garland-data-centers) — Olney Enterprise · 2025-11-12
- [Dallas Area Data Center Solutions - Stream Data Centers](https://www.streamdatacenters.com/locations/dallas-data-centers/)
- [Stream Data Centers DFW VII Hyperscale Facility in Dallas](https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/) — Stream Data Centers · 2018-12-18
- [Commissions New Hyperscale Data Center in Garland, Texas](https://www.streamdatacenters.com/news/stream-data-centers-commissions-new-hyperscale-data-center-in-garland-texas)
- [Commissions New Hyperscale Data Center in Garland, Texas](https://www.streamdatacenters.com/news/stream-data-centers-commissions-new-hyperscale-data-center-in-garland-texas/) — Stream Data Centers · 2020-01-14
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2021018683)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2022005637)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2022006854)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2022007231)
- [TDLR TABS - Project Details - Texas.gov](https://www.tdlr.texas.gov/TABS/Projects/TABS2022022354)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2021018683)

## Data quality

- The exact asset is Stream Data Centers DFWA at 1813 Lookout Drive, Garland; Stream identifies DFW VII as the first phase and DFWA1 as the expanded building.
- Stream’s official materials describe the initial DFW VII facility and the later expanded DFWA/DFWA1 building as related phases of the same Garland site. Figures and descriptions therefore should not be merged without identifying the phase.
- A separate NTT facility at 2008 Lookout Drive in Garland was excluded because it is a different operator and address.
- The evidence supports exact-asset or operator-and-location matching for the articles listed below. No tenant is named in the reviewed exact-site sources, so no tenant is reported.
- The reviewed evidence did not establish a formal community group, petition, exact-site public hearing record, opposition proceeding, or litigation involving DFWA/DFW VII.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---