Surry is a nuclear power facility with 1,695 MW of EIA-reported nameplate capacity in Surry County, Virginia, registered as EIA Plant ID 3806. Virginia Electric & Power Co owns and operates the plant. The plant's generating configuration is two three-loop Westinghouse pressurized-water reactors (PWRs) using nuclear fuel.

## Key facts

- Technology: Nuclear
- Power capacity: 1695 MW
- Operating status: operating
- Retirement: 2021

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM

## Source-backed facts

- Owner logo domain: dominionenergy.com — Surry Power Station | Dominion Energy · confidence: medium
- Owner logo domain: dominionenergy.com — Dominion Energy: Home · confidence: medium
- Identifiers: [{"value":"3806","system":"EIA plant code"},{"value":"1","system":"EIA generator ID — Surry Unit 1"},{"value":"2","system":"EIA generator ID — Surry Unit 2"},{"value":"50-280","system":"NRC docket — Unit 1"},{"value":"50-281","system":"NRC docket — Unit 2"},{"value":"PJM","system":"ISO/RTO"}] — Features (PrimSource) · confidence: medium
- Identifiers: [{"value":"3806","system":"EIA plant code"},{"value":"1","system":"EIA generator ID — Surry Unit 1"},{"value":"2","system":"EIA generator ID — Surry Unit 2"},{"value":"50-280","system":"NRC docket — Unit 1"},{"value":"50-281","system":"NRC docket — Unit 2"},{"value":"PJM","system":"ISO/RTO"}] — Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000) · confidence: medium
- Identifiers: [{"value":"3806","system":"EIA plant code"},{"value":"1","system":"EIA generator ID — Surry Unit 1"},{"value":"2","system":"EIA generator ID — Surry Unit 2"},{"value":"50-280","system":"NRC docket — Unit 1"},{"value":"50-281","system":"NRC docket — Unit 2"},{"value":"PJM","system":"ISO/RTO"}] — Report: Dominion defends proposal to keep Surry nuclear... · confidence: medium
- Description: Surry Power Station is a nuclear power plant in Surry County, Virginia, on the south bank of the James River across from historic Jamestown. EIA ownership data lists Surry Units 1 and 2 and identifies Virginia Electric & Power Co. as both the operator and 100% owner. — Surry Power Station | Dominion Energy · confidence: medium
- Parties: [{"relationship":"Owner","name":"Virginia Electric & Power Co","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Operator","name":"Virginia Electric & Power Co","official_url":"https://www.dominionenergy.com/en/About/Making-Energy/Nuclear-Facilities/Surry-Power-Station"},{"relationship":"Licensee / operating brand","name":"Dominion Energy","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"OEM / replacement steam-generator supplier","name":"Westinghouse Electric Company","official_url":"https://info.westinghousenuclear.com/"}] — Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000) · confidence: medium
- Parties: [{"relationship":"Owner","name":"Virginia Electric & Power Co","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Operator","name":"Virginia Electric & Power Co","official_url":"https://www.dominionenergy.com/en/About/Making-Energy/Nuclear-Facilities/Surry-Power-Station"},{"relationship":"Licensee / operating brand","name":"Dominion Energy","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"OEM / replacement steam-generator supplier","name":"Westinghouse Electric Company","official_url":"https://info.westinghousenuclear.com/"}] — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Identifiers.0: {"value":"3806","system":"EIA plant code"} — Features (PrimSource) · confidence: medium
- Identifiers.3: {"value":"50-280","system":"NRC docket — Unit 1"} — Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000) · confidence: medium
- Identifiers.4: {"value":"50-281","system":"NRC docket — Unit 2"} — Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000) · confidence: medium
- Identifiers.5: {"value":"PJM","system":"ISO/RTO"} — Report: Dominion defends proposal to keep Surry nuclear... · confidence: medium
- Parties.2: {"relationship":"Licensee / operating brand","name":"Dominion Energy","official_url":"https://www.dominionenergy.com/en/"} — Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000) · confidence: medium
- Parties.2: {"relationship":"Licensee / operating brand","name":"Dominion Energy","official_url":"https://www.dominionenergy.com/en/"} — Dominion Energy: Home · confidence: medium
- Parties.3: {"relationship":"OEM / replacement steam-generator supplier","name":"Westinghouse Electric Company","official_url":"https://info.westinghousenuclear.com/"} — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: high
- Unit configuration: Two three-loop Westinghouse pressurized-water reactors (PWRs) using nuclear fuel. — Safety Evaluation Report Related to the License Renewal of North Anna Power Station, Units 1 and 2, and Surry Power Station, Units 1 and 2 (NUREG-1766) | Nuclear Regulatory Commission · confidence: high
- Construction scope: Surry consists of two Westinghouse three-loop pressurized-water reactor units. The documented installed configuration includes three Model 51F steam generators per unit, or six total. Dominion and Westinghouse separately contracted for six replacement steam generators based on Westinghouse’s original F-Series units, with delivery beginning in 2028 and installation beginning in 2029; those replacements are future scope rather than installed equipment as of 2026-08-02. — Surry Power Station, Units 1 and 2 - License Amendment Request Permanent Alternate Repair Criteria For Steam Generator Tube Inspection and Repair. · confidence: medium
- Product url: https://westinghousenuclear.com/data-sheet-library/steam-generator-engineering-product-portfolio — Steam Generator Engineering Product Portfolio | Westinghouse Nuclear · confidence: medium
- Product url: https://westinghousenuclear.com/data-sheet-library/steam-generator-engineering-product-portfolio — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Kind: nuclear — EIA - State Nuclear Profiles · confidence: high
- Manufacturer domain: westinghousenuclear.com — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: high
- Equipment models: [{"manufacturer_domain":"westinghousenuclear.com","product_url":null,"count":2,"unit_mw":829,"name":"Westinghouse three-loop pressurized-water reactor"},{"manufacturer_domain":"westinghousenuclear.com","product_url":"https://westinghousenuclear.com/data-sheet-library/steam-generator-engineering-product-portfolio","count":6,"unit_mw":null,"name":"Westinghouse Model 51F steam generator"}] — Surry Power Station, Units 1 and 2 - License Amendment Request Permanent Alternate Repair Criteria For Steam Generator Tube Inspection and Repair. · confidence: medium
- Product family: Westinghouse Model 51F / F-Series steam generators — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Equipment models.1: {"manufacturer_domain":"westinghousenuclear.com","product_url":"https://westinghousenuclear.com/data-sheet-library/steam-generator-engineering-product-portfolio","count":6,"unit_mw":null,"name":"Westinghouse Model 51F steam generator"} — Surry Power Station, Units 1 and 2 - License Amendment Request Permanent Alternate Repair Criteria For Steam Generator Tube Inspection and Repair. · confidence: medium
- Description: Surry Power Station is a two-unit Westinghouse pressurized-water reactor facility in Surry County, Virginia. EIA ownership data lists Virginia Electric & Power Co. as both operator and 100% owner of Surry Units 1 and 2. Construction began in 1968; Unit 1 entered commercial operation on 1972-12-22 and Unit 2 on 1973-05-01. The NRC approved subsequent renewed licenses in 2021, permitting operation through 2052 for Unit 1 and 2053 for Unit 2. Westinghouse contracted in 2023 to supply six replacement steam generators for the license-renewal program, with delivery expected to begin in 2028 and installation in 2029. — Surry Power Station, Units 1 and 2 - Record of Decision · confidence: medium
- Description: Surry Power Station is a two-unit Westinghouse pressurized-water reactor facility in Surry County, Virginia. EIA ownership data lists Virginia Electric & Power Co. as both operator and 100% owner of Surry Units 1 and 2. Construction began in 1968; Unit 1 entered commercial operation on 1972-12-22 and Unit 2 on 1973-05-01. The NRC approved subsequent renewed licenses in 2021, permitting operation through 2052 for Unit 1 and 2053 for Unit 2. Westinghouse contracted in 2023 to supply six replacement steam generators for the license-renewal program, with delivery expected to begin in 2028 and installation in 2029. — Surry Power Station Units 1 And 2, 2024 Annual... · confidence: medium
- Description: Surry Power Station is a two-unit Westinghouse pressurized-water reactor facility in Surry County, Virginia. EIA ownership data lists Virginia Electric & Power Co. as both operator and 100% owner of Surry Units 1 and 2. Construction began in 1968; Unit 1 entered commercial operation on 1972-12-22 and Unit 2 on 1973-05-01. The NRC approved subsequent renewed licenses in 2021, permitting operation through 2052 for Unit 1 and 2053 for Unit 2. Westinghouse contracted in 2023 to supply six replacement steam generators for the license-renewal program, with delivery expected to begin in 2028 and installation in 2029. — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Quality notes: ["No project-level acquirer, seller, transaction consideration, or transaction month/year is identified; the available ownership record instead lists Virginia Electric & Power Co. as the 100% owner and operator of both units.","Capacity conventions differ: the NRC record cites 1,676 MWe of Surry generating capacity, while an EIA-derived listing reports 1,695 MW of nameplate capacity. The description uses the NRC generating-capacity figure where plant-level capacity is stated.","The 2032–2078 decommissioning schedule in a 2019 SEC filing reflected the then-current licenses; the 2021 subsequent renewals changed the authorized operating horizon to 2052 and 2053.","The 2023 modernization contract explicitly covers six replacement steam generators; no equipment count is inferred from capacity.","A secondary-source figure reports $1.868 billion in 2007-dollar construction cost. It is treated as a construction-cost estimate, not as project financing, sale consideration, or a portfolio transaction value."] — Surry Power Station, Units 1 and 2 - Record of Decision · confidence: medium
- Quality notes: ["No project-level acquirer, seller, transaction consideration, or transaction month/year is identified; the available ownership record instead lists Virginia Electric & Power Co. as the 100% owner and operator of both units.","Capacity conventions differ: the NRC record cites 1,676 MWe of Surry generating capacity, while an EIA-derived listing reports 1,695 MW of nameplate capacity. The description uses the NRC generating-capacity figure where plant-level capacity is stated.","The 2032–2078 decommissioning schedule in a 2019 SEC filing reflected the then-current licenses; the 2021 subsequent renewals changed the authorized operating horizon to 2052 and 2053.","The 2023 modernization contract explicitly covers six replacement steam generators; no equipment count is inferred from capacity.","A secondary-source figure reports $1.868 billion in 2007-dollar construction cost. It is treated as a construction-cost estimate, not as project financing, sale consideration, or a portfolio transaction value."] — Surry Nuclear Power Plant · confidence: medium
- Financing summary: Project-financing terms, lenders, acquisition consideration, and sale consideration are not disclosed in the cited project and regulatory records. A secondary-source construction-cost estimate of $1.868 billion in 2007 dollars is reported, but it is not identified as financing or transaction value. — Surry Nuclear Power Plant · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Hog Island: 1968–1973 | Virginia DWR · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Surry Power Station Units 1 And 2, 2024 Annual... · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2. · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Surry Power Stations - License Renewal Application | Nuclear Regulatory Commission · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Dominion Energy Announces Surry Power Station Receives Regulatory Approval to Extend Operations; Helps Virginia Meet its Clean Energy Goals · confidence: medium
- Timeline: [{"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."},{"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."},{"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."},{"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."},{"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."},{"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."},{"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."},{"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."},{"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."},{"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."},{"event":"Ownership and transaction status","date":null,"detail":"EIA ownership data lists Virginia Electric & Power Co. as the 100% owner and operator of both units. No separate project-level acquisition, sale, acquirer, seller, or transaction month/year is identified in the cited records."},{"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."}] — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Commercial parties: [{"relationship":"Owner and operator","name":"Virginia Electric & Power Co","detail":"EIA ownership data lists Virginia Electric & Power Co. as the utility operator and 100% owner of Surry Units 1 and 2.","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Licensee and operating brand","name":"Dominion Energy Virginia","detail":"NRC and Federal Register records identify Dominion Energy Virginia as the operating license applicant/licensee associated with Virginia Electric & Power Co.; Dominion announced the 2021 license extension and the 2023 modernization program.","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Nuclear technology supplier and replacement-equipment supplier","name":"Westinghouse Electric Company","detail":"The NRC identifies Westinghouse as supplier of the units’ nuclear steam-supply systems and turbine generators. Westinghouse separately announced the 2023 contract to supply six replacement steam generators.","official_url":"https://www.westinghousenuclear.com/"}] — Source · confidence: medium
- Commercial parties: [{"relationship":"Owner and operator","name":"Virginia Electric & Power Co","detail":"EIA ownership data lists Virginia Electric & Power Co. as the utility operator and 100% owner of Surry Units 1 and 2.","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Licensee and operating brand","name":"Dominion Energy Virginia","detail":"NRC and Federal Register records identify Dominion Energy Virginia as the operating license applicant/licensee associated with Virginia Electric & Power Co.; Dominion announced the 2021 license extension and the 2023 modernization program.","official_url":"https://www.dominionenergy.com/en/"},{"relationship":"Nuclear technology supplier and replacement-equipment supplier","name":"Westinghouse Electric Company","detail":"The NRC identifies Westinghouse as supplier of the units’ nuclear steam-supply systems and turbine generators. Westinghouse separately announced the 2023 contract to supply six replacement steam generators.","official_url":"https://www.westinghousenuclear.com/"}] — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Commercial parties.2: {"relationship":"Nuclear technology supplier and replacement-equipment supplier","name":"Westinghouse Electric Company","detail":"The NRC identifies Westinghouse as supplier of the units’ nuclear steam-supply systems and turbine generators. Westinghouse separately announced the 2023 contract to supply six replacement steam generators.","official_url":"https://www.westinghousenuclear.com/"} — Source · confidence: medium
- Commercial parties.2: {"relationship":"Nuclear technology supplier and replacement-equipment supplier","name":"Westinghouse Electric Company","detail":"The NRC identifies Westinghouse as supplier of the units’ nuclear steam-supply systems and turbine generators. Westinghouse separately announced the 2023 contract to supply six replacement steam generators.","official_url":"https://www.westinghousenuclear.com/"} — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Timeline.0: {"event":"Construction began","date":"1968","detail":"Virginia DWR records that construction began on the Surry Nuclear Power Plant."} — Hog Island: 1968–1973 | Virginia DWR · confidence: high
- Timeline.1: {"event":"Unit 1 commercial operation","date":"1972-12-22","detail":"NRC operating-report material states that Surry Unit 1 achieved commercial operation on December 22, 1972."} — Surry Power Station Units 1 And 2, 2024 Annual... · confidence: high
- Timeline.2: {"event":"Unit 2 commercial operation","date":"1973-05-01","detail":"NRC operating-report material states that Surry Unit 2 achieved commercial operation on May 1, 1973."} — Surry Power Station Units 1 And 2, 2024 Annual... · confidence: high
- Timeline.3: {"event":"Unit 2 steam-generator replacement program","date":"1978-10","detail":"An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979."} — Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2. · confidence: medium
- Timeline.4: {"event":"Unit 1 steam-generator replacement program","date":"1979-11","detail":"An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980."} — Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2. · confidence: medium
- Timeline.5: {"event":"Initial license renewal","date":"2003-03-20","detail":"The NRC issued renewed licenses for Surry Units 1 and 2, adding 20 years of operation after the initial 40-year licenses."} — Surry Power Stations - License Renewal Application | Nuclear Regulatory Commission · confidence: high
- Timeline.6: {"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."} — Dominion Energy Announces Surry Power Station Receives Regulatory Approval to Extend Operations; Helps Virginia Meet its Clean Energy Goals · confidence: high
- Timeline.6: {"event":"Subsequent license renewal approved","date":"2021-05-04","detail":"The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053."} — Surry Power Station, Units 1 and 2 - Record of Decision · confidence: high
- Timeline.7: {"event":"Replacement steam-generator contract","date":"2023-05-16","detail":"Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program."} — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: high
- Timeline.8: {"event":"Replacement steam-generator deliveries expected","date":"2028","detail":"Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028."} — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Timeline.9: {"event":"Replacement steam-generator installation expected","date":"2029","detail":"Westinghouse stated that installation was expected to begin in 2029."} — Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment · confidence: medium
- Timeline.11: {"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."} — Surry Power Station, Units 1 and 2 - Record of Decision · confidence: medium
- Timeline.11: {"event":"Retirement status","date":null,"detail":"No retirement or decommissioning event is identified. The 2021 subsequent renewals authorize operation through 2052 for Unit 1 and 2053 for Unit 2."} — Dominion Energy Announces Surry Power Station Receives Regulatory Approval to Extend Operations; Helps Virginia Meet its Clean Energy Goals · confidence: medium

## Timeline

- 1968 — Construction began
  Virginia DWR records that construction began on the Surry Nuclear Power Plant.
  Source: Hog Island: 1968–1973 | Virginia DWR (https://www.dwr.virginia.gov/blog/timeline/hog-island-1968-1973/)
- 1978-10 — Unit 2 steam-generator replacement program
  An NRC replacement schedule placed Unit 2 steam-generator replacement during October 1978 through May 1979.
  Source: Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2. (https://www.nrc.gov/docs/ML1909/ML19093B022.pdf)
- 1979-11 — Unit 1 steam-generator replacement program
  An NRC replacement schedule placed Unit 1 steam-generator replacement during November 1979 through April 1980.
  Source: Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2. (https://www.nrc.gov/docs/ML1909/ML19093B022.pdf)
- 2021-05-04 — Subsequent license renewal approved
  The NRC approved a further 20-year extension, authorizing Unit 1 to operate through May 25, 2052, and Unit 2 through January 29, 2053.
  Source: Surry Power Station, Units 1 and 2 - Record of Decision (https://www.nrc.gov/docs/ML2009/ML20091L985.pdf)
- 2023-05-16 — Replacement steam-generator contract
  Westinghouse announced a contract with Dominion Energy to design, manufacture, and deliver six replacement steam generators supporting Surry’s subsequent license-renewal program.
  Source: Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment (https://info.westinghousenuclear.com/news/westinghouse-partners-with-dominion-energy-to-further-modernize-virginia-nuclear-power-plant-with-advanced-equipment)
- 2028 — Replacement steam-generator deliveries expected
  Westinghouse stated that delivery of the replacement steam generators was expected to begin in 2028.
  Source: Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment (https://info.westinghousenuclear.com/news/westinghouse-partners-with-dominion-energy-to-further-modernize-virginia-nuclear-power-plant-with-advanced-equipment)
- 2029 — Replacement steam-generator installation expected
  Westinghouse stated that installation was expected to begin in 2029.
  Source: Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment (https://info.westinghousenuclear.com/news/westinghouse-partners-with-dominion-energy-to-further-modernize-virginia-nuclear-power-plant-with-advanced-equipment)

## Sources

- [Surry Power Station | Dominion Energy](https://www.dominionenergy.com/en/About/Making-Energy/Nuclear-Facilities/Surry-Power-Station) — dominionenergy.com · tier other
- [Dominion Energy: Home](https://www.dominionenergy.com/en/) — dominionenergy.com · tier other
- [Features (PrimSource)](https://images.zoomprospector.com/shared/usa/energy/power_nonrenewable2020v2.kml) — images.zoomprospector.com · tier other
- [Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, Millstone Power Station, Units 2 and 3, and Virgil C. Summer Nuclear Station, Unit 1 - Regulatory Audit Report in Support of Dominion Fleet Report (EPID L-2025-LLT-0000)](https://www.nrc.gov/docs/ML2609/ML26099A046.pdf) — nrc.gov · tier regulatory
- [Report: Dominion defends proposal to keep Surry nuclear ...](https://www.utilitydive.com/news/report-dominion-defends-proposal-to-keep-surry-nuclear-facility-online-unt/423252/) — utilitydive.com · tier other
- [Westinghouse Partners with Dominion Energy to Further Modernize Virginia Nuclear Power Plant with Advanced Equipment](https://info.westinghousenuclear.com/news/westinghouse-partners-with-dominion-energy-to-further-modernize-virginia-nuclear-power-plant-with-advanced-equipment) — info.westinghousenuclear.com · tier other
- [surry volume i](https://www.dominionenergy.com/-/media/content/about/power-line-projects/skiffes-creek/pdfs/milestones-and-documents/surry-volume-i.pdf) — dominionenergy.com · tier other
- [Safety Evaluation Report Related to the License Renewal of North Anna Power Station, Units 1 and 2, and Surry Power Station, Units 1 and 2 (NUREG-1766) | Nuclear Regulatory Commission](https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1766/index) — nrc.gov · tier regulatory
- [Nuclear reactor Ownership](https://www.eia.gov/nuclear/reactors/reactorcapacity.php) — eia.gov · tier regulatory
- [Dominion Energy Announces Surry Power Station Receives Regulatory Approval to Extend Operations; Helps Virginia Meet its Clean Energy Goals](https://investors.dominionenergy.com/news/press-release-details/2021/Dominion-Energy-Announces-Surry-Power-Station-Receives-Regulatory-Approval-to-Extend-Operations-Helps-Virginia-Meet-its-Clean-Energy-Goals/default.aspx) — investors.dominionenergy.com · tier other
- [Surry Power Station, Units 1 and 2 - License Amendment Request Permanent Alternate Repair Criteria For Steam Generator Tube Inspection and Repair.](https://www.nrc.gov/docs/ML1121/ML11215A058.pdf) — nrc.gov · tier regulatory
- [Source](https://dominionenergy.com/en/About/Making-Energy/Nuclear-Facilities/Surry-Power-Station) — dominionenergy.com · tier other
- [Steam Generator Engineering Product Portfolio | Westinghouse Nuclear](https://westinghousenuclear.com/data-sheet-library/steam-generator-engineering-product-portfolio) — westinghousenuclear.com · tier other
- [EIA - State Nuclear Profiles](https://www.eia.gov/nuclear/state/virginia/) — eia.gov · tier regulatory
- [Surry Power Station, Units 1 and 2 - Record of Decision](https://www.nrc.gov/docs/ML2009/ML20091L985.pdf) — nrc.gov · tier regulatory
- [Surry Power Station Units 1 And 2, 2024 Annual ...](https://www.nrc.gov/docs/ML2511/ML25119A073.pdf) — nrc.gov · tier regulatory
- [Surry Nuclear Power Plant](https://en.wikipedia.org/wiki/Surry_Nuclear_Power_Plant) — en.wikipedia.org · tier other
- [Hog Island: 1968–1973 | Virginia DWR](https://www.dwr.virginia.gov/blog/timeline/hog-island-1968-1973/) — dwr.virginia.gov · tier regulatory
- [Surry Power Station, Units 1 & 2 - Steam Generator Replacement - Surry Units Nos. 1 & 2.](https://www.nrc.gov/docs/ML1909/ML19093B022.pdf) — nrc.gov · tier regulatory
- [Surry Power Stations - License Renewal Application | Nuclear Regulatory Commission](https://www.nrc.gov/reactors/operating/licensing/renewal/applications/surry) — nrc.gov · tier regulatory
- [Source](https://www.nrc.gov/docs/ML2212/ML22126A102.pdf) — nrc.gov · tier regulatory
- [Source](https://www.sec.gov/Archives/edgar/data/103682/000119312519057924/d662998d10k.htm) — sec.gov · tier regulatory
- [Surry, Units 1 & 2 - Response to NRC letter re Partial Ownership ...](https://www.nrc.gov/docs/ML1909/ML19095A234.pdf) — nrc.gov · tier regulatory
- [Dominion Power Surry-Skiffes Creek-Whealton EIS > Norfolk District > SkiffesCreekPowerLine](https://www.nao.usace.army.mil/missions/regulatory/skiffescreekpowerline.aspx) — nao.usace.army.mil · tier other
- [Nuclear Energy | Dominion Energy](https://www.dominionenergy.com/en/About/Making-Energy/Nuclear-Facilities/Nuclear-Energy) — dominionenergy.com · tier other
- [01/14/2026 Presubmittal Meeting for a Surry Unit 1 and 2 License Amendment Request Proposed change to the Technical Specifications](https://www.nrc.gov/docs/ML2536/ML25363A145.pdf) — nrc.gov · tier regulatory
- [Westinghouse to replace steam generators at Dominion ...](https://www.power-eng.com/nuclear/westinghouse-to-replace-steam-generators-at-dominion-energys-surry-nuclear-plant/) — power-eng.com · tier other

## Data quality

- No project-level acquirer, seller, transaction consideration, or transaction month/year is identified; the available ownership record instead lists Virginia Electric & Power Co. as the 100% owner and operator of both units. Capacity conventions differ: the NRC record cites 1,676 MWe of Surry generating capacity, while an EIA-derived listing reports 1,695 MW of nameplate capacity. The description uses the NRC generating-capacity figure where plant-level capacity is stated. The 2032–2078 decommissioning schedule in a 2019 SEC filing reflected the then-current licenses; the 2021 subsequent renewals changed the authorized operating horizon to 2052 and 2053. The 2023 modernization contract explicitly covers six replacement steam generators; no equipment count is inferred from capacity. A secondary-source figure reports $1.868 billion in 2007-dollar construction cost. It is treated as a construction-cost estimate, not as project financing, sale consideration, or a portfolio transaction value.

---