# TECfusions Clarksville Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/tecfusions-clarksville-data-center-campus--grid-load-18b576b544809acd

The TECfusions Clarksville Data Center is a wholesale colocation data center at 250 Burlington Drive in Clarksville, Mecklenburg County, Virginia, housed in a former candy factory of 196,000 square feet. A July 2026 investor disclosure reports 37 MW live and fully leased, and an investor presentation shows a 220 MW Phase 2 expansion. The company has rezoned adjoining parcels for more data center buildings, a power generation facility and a substation, and has had a power study from Dominion Energy for the expansion. Marketing materials cite 80 MW leased and 300 MW of future total capacity, which are not energized figures.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 250 Burlington Drive, Clarksville, Mecklenburg County, VA
- Operator: TECfusions (exact asset)
- Owner: TECfusions (exact asset)
- Developer: TECfusions (exact asset)

## Power and grid context

- Energized power: 37 MW · energized · exact asset — Live and fully leased capacity reported in an investor disclosure; load basis not stated
- Reported it power: 37.5+ MW · reported · exact asset — Computing power the converted factory can support
- Contracted power: 80 MW · contracted · exact asset — Leased capacity on the operator's marketing page
- Reported unspecified: 300 MW · proposed · exact asset — Future total capacity on the operator's marketing page
- Reported unspecified: 220 MW · proposed · exact asset — Phase 2 expansion in an investor presentation
- ISO/RTO: PJM
- Electric utility: Mecklenburg Electric Cooperative
- Substation: Proposed substation on TECfusions property, requiring a new Dominion Virginia Power transmission line

## Development

- Site area: 22.49 acres

## Compute and operations

- Facility classes: colocation

## Sources

- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/2079253/000121390026080202/ea029866401ex99-1.htm)
- [TECfusions touts local data center innovations - SoVaNOW: Home of The News &amp; Record and The Mecklenburg Sun](https://www.sovanow.com/articles/tecfusions-touts-local-data-center-innovations/)
- [Clarksville &#8211; TECfusions](https://tecfusions.com/data-centers/clarksville/)
- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/2079253/000121390026080202/ea029866401ex99-2.htm)
- [Data center rezoning to be aired at meeting - SoVaNOW: Home of The News &amp; Record and The Mecklenburg Sun](https://www.sovanow.com/articles/data-center-rezoning-to-be-aired-at-meeting/)
- [TecFusions makes plans for data expansion, housing - SoVaNOW: Home of The News &amp; Record and The Mecklenburg Sun](https://www.sovanow.com/articles/tecfusions-makes-plans-for-data-expansion-housing/)
- [Access Denied](https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers)
- [Mecklenburg supes back data center rezoning bid - SoVaNOW: Home of The News &amp; Record and The Mecklenburg Sun](https://www.sovanow.com/articles/mecklenburg-supes-back-data-center-rezoning-bid/)
- [https://deq.zh-cn.virginia.gov/home/showpublisheddocument/25646/638754663915730000](https://deq.zh-cn.virginia.gov/home/showpublisheddocument/25646/638754663915730000)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=250+Burlington+Drive%2C+Clarksville%2C+VA&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=250+Burlington+Drive%2C+Clarksville%2C+VA&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [www.mecklenburgva.com](https://www.mecklenburgva.com/AgendaCenter/ViewFile/Minutes/_02102025-176)
- [https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-78.549837800307%2C36.601752352762&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false](https://services3.arcgis.com/OYP7N6mAJJCyH6hd/arcgis/rest/services/Electric_Retail_Service_Territories_HIFLD/FeatureServer/0/query?f=json&where=1%3D1&geometry=-78.549837800307%2C36.601752352762&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=ID%2CNAME&returnGeometry=false)

---

Canonical page: https://askthegrid.com/assets/facilities/tecfusions-clarksville-data-center-campus--grid-load-18b576b544809acd
Profile generated: 2026-11-02T19:59:48.220941Z
Source: Ask the Grid — https://askthegrid.com/