# TECfusions Keystone Connect Data Center Campus

PJM data center · https://askthegrid.com/assets/facilities/tecfusions-keystone-connect-data-center-campus--grid-load-3ab3a6a0127b8315

TECfusions Keystone Connect is a data center campus on a 1,395-acre former Alcoa and Arconic technology site at 100 Technical Drive in Upper Burrell Township, Westmoreland County, Pennsylvania. The company says Building J has been operational since June 2026 and an SEC filing reports 12 MW of Phase 1 contracted, of which 2 MW is live. The company plans up to 3 GW over time, to be supplied largely by on-site natural gas generation with an early plan for 280 MW from West Penn Power. None of the larger figures is operating load, and the township adopted a data center ordinance in October 2026 that applies to new work beyond the first two Building J phases.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 100 Technical Drive, New Kensington, Westmoreland County, PA
- Operator: TECfusions (exact asset)
- Developer: TECfusions (exact asset)
- Owner: TECfusions (exact asset)
- Tenant: TensorWave (exact asset)

## Power and grid context

- Reported unspecified: 3,000 MW · proposed · exact asset — Planned campus capacity to be deployed over six years
- Critical it load: 3,000 MW · proposed · exact asset — Campus IT load on the company flyer
- Available power: 12 MW · reported · exact asset — Capacity the company said was immediately available at the announcement
- Reported unspecified: 300 MW · target · exact asset — Phase I operational goal in the investor deck
- Critical it load: Up to 1,100 MW · target · exact asset — Phase I scale ambition
- Contracted power: 1,000 MW · reported · exact asset — Company-marketed leased capacity; leasing is not evidence of energization
- Reported unspecified: 10 MW · target · exact asset — Initial tenant deployment announced by the company
- Utility service: 280 MW · proposed · exact asset — Early plan for utility supply, with the remainder from on-site natural gas
- ISO/RTO: PJM
- Electric utility: West Penn Power

## Compute and operations

- Announced tenants: TensorWave
- Critical IT load: 3,000 MW

## Sources

- [TECfusions announces Upper Burrell data center is operational](https://triblive.com/local/valley-news-dispatch/tecfusions-announces-upper-burrell-data-center-is-operational/)
- [TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant](https://www.prnewswire.com/news-releases/tecfusions-unveils-massive-1400-acre-data-center-project-in-pennsylvania-revitalizing-former-industrial-plant-302350041.html)
- [https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf](https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf)
- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/2079253/000121390026080199/ea029866401ex99-2.htm)
- [New Kensington &#8211; TECfusions](https://tecfusions.com/data-centers/new-kensington/)
- [TensorWave Expands with TECfusions, Splitting 20 MW Across Arizona and Pennsylvania Locations &#8211; TECfusions](https://tecfusions.com/tensorwave-expands-with-tecfusions-splitting-20-mw-across-arizona-and-pennsylvania-locations/)
- [Upper Burrell data center to use natural gas for more than 2 gigawatts of power generation](https://triblive.com/local/valley-news-dispatch/upper-burrell-data-center-to-use-natural-gas-for-more-than-2-gigawatts-of-power-generation/)
- [Upper Burrell data center to be company&#8217;s &#8216;U.S. flagship,&#8217; founder says](https://archive.triblive.com/local/valley-news-dispatch/upper-burrell-data-center-to-be-companys-u-s-flagship-founder-says/)
- [https://files.dep.state.pa.us/water/wastewater%20management/EDMRPortalFiles/Permits/PA0000469_NPDES_PERMIT_20250331_Final_V2.pdf](https://files.dep.state.pa.us/water/wastewater%20management/EDMRPortalFiles/Permits/PA0000469_NPDES_PERMIT_20250331_Final_V2.pdf)
- [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/Display/pabull?file=/secure/pabulletin/data/vol56/56-40/1449a.html)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=100+Technical+Drive%2C+New+Kensington%2C+PA&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=100+Technical+Drive%2C+New+Kensington%2C+PA&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [SEC.gov | Your Request Originates from an Undeclared Automated Tool](https://www.sec.gov/Archives/edgar/data/2079253/000121390026080199/ea029866401ex99-1.htm)
- [Upper Burrell supervisors pass data center ordinance](https://triblive.com/local/valley-news-dispatch/upper-burrell-supervisors-pass-data-center-ordinance/)

---

Canonical page: https://askthegrid.com/assets/facilities/tecfusions-keystone-connect-data-center-campus--grid-load-3ab3a6a0127b8315
Profile generated: 2026-11-02T19:59:47.885620Z
Source: Ask the Grid — https://askthegrid.com/