TeraWulf plans its Chesapeake Data Campus at the Morgantown Generating Station, 12620 Crain Highway, Newburg, Charles County, Maryland, in PJM. The station has about 210 MW of operating generation; TeraWulf agreed to buy it and FERC authorized the acquisition on July 29, 2026, with other closing conditions pending. TeraWulf lists 800 MW of critical IT capacity, contemplates about 500 MW in an initial phase scaling toward 1 GW, and targets initial data center operations around 2030. Plans include gas generation, battery storage and demand-response capability.

## Identity and location

- Operating status: permitting
- Asset scope: campus
- Location: 12620 Crain Highway, Newburg, Charles County, MD
- Operator: TeraWulf (campus) — https://www.chesapeakedatacampus.com

## Power and grid context

- Critical it load: 800 MW · reported · campus — Operator-listed total critical IT capacity; 0 MW contracted.
- Reported unspecified: 210 MW · reported · campus — Existing grid-connected Morgantown generation capacity; basis unspecified.
- Reported unspecified: 500 MW · reported · phase · Initial phase — Development approach contemplates about 500 MW in an initial phase, scaling toward 1 GW of load; basis unspecified.
- Balancing authority: PJM

## Compute and operations

- Facility classes: ai_hpc

## Sources

- [FRS Facility Detail Report | Envirofacts | US EPA](https://frs-public.epa.gov/ords/frs_public2/fii_query_dtl.disp_program_facility?p_registry_id=110000339143)
- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=12620+Crain+Highway%2C+Newburg%2C+MD%2C+20664&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland :: TeraWulf Inc. (WULF)](https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland)
- [TeraWulf Reports First Quarter 2026 Results :: TeraWulf Inc. (WULF)](https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results)
- [TeraWulf Reports Second Quarter 2026 Results :: TeraWulf Inc. (WULF)](https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results)
- [August 5, 2026 - 10-Q: Quarterly report [Sections 13 or 15(d)] | TeraWulf Inc. (WULF)](https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm)
- [Project Overview - Chesapeake Data Campus](https://www.chesapeakedatacampus.com/project-overview)
- [Our Sites | TeraWulf](https://www.terawulf.com/our-sites)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/terawulf-chesapeake-data-campus
Profile generated: 2026-10-09T16:45:04.597023Z
Source: Ask the Grid — https://askthegrid.com/