# Top Gun Energy Storage

CAISO asset profile · https://askthegrid.com/assets/facilities/top-gun-energy-storage

## Current generation inventory

EIA plant 61366 · Inventory reporting month: 2026-08.

- batteries: 30 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -117.1678, 32.876198
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2025-07-18 03:35:24+00:00
- Map prepared: 2026-10-10T23:05:26.214417+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Top Gun Energy Storage is SDG&E’s 30 MW / 120 MWh lithium-ion battery installation at the Miramar site in San Diego. Its four-hour rating describes stored electricity and discharge power; it is separate from Miramar Energy Facility’s two natural-gas turbines. The August 2026 EIA inventory lists battery generator TGES as operating. SDG&E operates Top Gun with personnel based at Palomar Energy Center, while RES America performs most maintenance under a long-term service agreement.

## Reviewed metrics

- **Nameplate capacity:** 30 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 61366 — plant-61366

## Facts

- **Technology:** Batteries
- **Operator:** San Diego Gas & Electric Company
- **Operating status:** Operating

## Related parties

- **Owner / operator:** San Diego Gas & Electric Company — Owner and operator ([source](https://www.sdge.com))
- **EPC contractor / construction contractor / O&M provider:** RES Americas Construction — EPC contractor and operations and maintenance provider ([source](https://www.res-group.com))
- **Parent company:** Sempra — Parent company of SDG&E ([source](https://www.sempra.com))

## Sources

- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M215/K724/215724114.PDF) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.
- [mbrweb.ferc.gov](https://mbrweb.ferc.gov/SearchMBRAssetAppendix/AssetAppendixDetails?AssetAppendixId=13677) — mbrweb.ferc.gov · authoritative — Source retained for exact-record publication review.
- [res-group.com](https://www.res-group.com/resources/news/30-mw-120-mwh-top-gun-energy-storage-project-begins-commercial-operation) — res-group.com · public_source — Source retained for exact-record publication review.
- [sdge.com](https://www.sdge.com/home) — sdge.com · public_source — Source retained for exact-record publication review.
- [sdge.com](https://www.sdge.com/sites/default/files/5-6-21cleanenergyfactsheet.pdf) — sdge.com · public_source — Source retained for exact-record publication review.
- [sdge.com](https://www.sdge.com/sites/default/files/regulatory/SDGE-10_Electric_Generation_Darren_Weim_Direct_6156_6157.pdf) — sdge.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/top-gun-energy-storage
Website: [San Diego Gas & Electric Company](https://www.sdge.com)

Source: Ask the Grid — https://askthegrid.com/
