# Townsite Solar Project Hybrid

CAISO asset profile · https://askthegrid.com/assets/facilities/townsite-solar-project-hybrid

## Current generation inventory

EIA plant 60654 · Inventory reporting month: 2026-08.

- solar: 180 MW operating nameplate
- batteries: 90 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -114.884, 35.937336
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2022-06-19 23:32:52+00:00
- Map prepared: 2026-10-10T02:28:23.153952+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Townsite Solar Project Hybrid is a 270 MW batteries, solar photovoltaic plant in Clark County. Townsite Solar Project is a 180 MWac / 231 MWdc solar plant in Boulder City, Nevada, paired with a 90 MWac / 360 MWh energy storage facility. Three long-term PPAs serving two municipalities and a cooperative were secured, Tenaska Power Services provides energy management, and construction was expected to finish by the end of 2021.

## Reviewed metrics

- **Nameplate capacity:** 270 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 60654 — plant-60654

## Facts

- **Technology:** Batteries, Solar Photovoltaic
- **Operator:** Townsite Solar, LLC

## Related parties

- **Owner / acquirer:** Capital Dynamics — owner
- **Asset manager / power marketer:** Tenaska Power Services — power_marketer

## Sources

- [pv-tech.org](https://www.pv-tech.org/capital-dynamics-grows-its-nevada-portfolio-with-180mw-of-solar-90mw-storag/) — pv-tech.org · public_source — Source retained for exact-record publication review.
- [solarpowerworldonline.com](https://www.solarpowerworldonline.com/2019/08/capital-dynamics-acquires-nevada-solarstorage-project/) — solarpowerworldonline.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/townsite-solar-project-hybrid

Source: Ask the Grid — https://askthegrid.com/
