Young County · ERCOT

Trinity Hills is a wind power facility with 198 MW of EIA-reported operating capacity in Young County, Texas, registered as EIA Plant ID 57520.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.
- **Physical build:** Originally commissioned in 2011–2012 and built with 90 Clipper Liberty C96 onshore wind turbines (Liberty C96, 2.5 MW each; nominal nameplate ≈225 MW). A repowering with Vestas-American Wind Technology has been announced.

## Metrics

- **Reported capacity:** 198 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 57520 — Young County · ERCOT
- **Operating status:** Operating — Trinity Hills is operating.

## Facts

- **Reported capacity:** 198 MW — Onshore Wind Turbine · confidence: high
- **Operating status:** operating — Trinity Hills is operating. · confidence: medium
- **Location:** Young County — ERCOT · confidence: high
- **Asset role:** wind — ERCOT · Young County
- **Owner:** Ares Management Corp; UBS Asset Management (Americas) Inc — These sources directly identify Ares and UBS as the public owners. · confidence: medium

## Related parties

- **EPC contractor:** Blattner Energy — EPC contractor associated with Trinity Hills. ([source](https://www.blattnercompany.com/))
- **Equipment OEM:** Clipper WindPower (Liberty C96 turbines) — Equipment OEM associated with Trinity Hills. ([source](https://www.clipperwind.com/))

## Sources

- [SARA Fall 2023](https://www.ercot.com/files/docs/2023/09/19/SARA_Fall2023.pdf) — ercot.com · regulatory — 755 TRINITY HILLS WIND 2 20INR0019 TRINITY_TH1_BUS2 ARCHER WIND-O WEST 2012 94.6 94.6
- [About - Clipper](https://clipperwind.com/company/about/) — clipperwind.com · other — Liberty 2.5MW Wind Turbine, The Liberty contains four smaller generators instead of the typical single generator, significantly increasing its power generation
- [Vestas secures largest repowering order to date with 359...](https://www.vestas.com/en/media/company-news/2018/vestas-secures-largest-repowering-order-to-date-with-35-c2963260) — vestas.com · other — Dec 27, 2018 — With this order, Vestas will replace the existing Clipper turbines with V110-2.2 MW turbines at the Trinity Hills, Sherbino Mesa II, and Silver
- [Ares Management Acquires Three Texas Wind Farms from...](https://www.abfjournal.com/ares-management-acquires-three-texas-wind-farms-from-bp/) — abfjournal.com · other — Dec 27, 2018 — Trinity Hills (225 MW) Vestas-American Wind Technology.

---

Canonical page: https://askthegrid.com/assets/facilities/trinity-hills

Profile published: 2026-07-17T03:34:55.189Z
Source: Ask the Grid — https://askthegrid.com/