# Troy Energy LLC

PJM Natural Gas Fired Combustion Turbine · https://askthegrid.com/assets/facilities/troy-energy-llc

Troy Energy LLC is a natural gas-fired power facility with 795.6 MW of EIA-reported nameplate capacity in Wood County, Ohio, registered as EIA Plant ID 55348. It operates in the PJM balancing-authority area.

## Key facts

- Technology: Natural Gas Fired Combustion Turbine
- Power capacity: 795.6 MW
- Operating status: operating
- Retirement: 2025

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)
- Substation: Lemoyne
- Point of interconnection: Lemoyne
- Transmission owner: American Transmission Systems Inc. (ATSI)
- Interconnection voltage: 345 kV

## Source-backed facts

- Owner logo domain: lspower.com — LS Power to Acquire 1,279 MW Power Generation Portfolio in PJM - LS Power · confidence: medium
- Identifiers: [{"value":"55348","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"4","system":"EIA generator ID"},{"value":"PJM","system":"PJM balancing authority"},{"value":"AD1-118","system":"PJM interconnection queue"},{"value":"NCR11759","system":"NERC registered entity ID (2020)"},{"value":"NCR00337","system":"NERC registered entity ID (2015)"},{"value":"2IB00018*FD","system":"Ohio EPA NPDES permit"},{"value":"OH0132373","system":"Ohio EPA application"}] — MBR | Index · confidence: medium
- Identifiers: [{"value":"55348","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"4","system":"EIA generator ID"},{"value":"PJM","system":"PJM balancing authority"},{"value":"AD1-118","system":"PJM interconnection queue"},{"value":"NCR11759","system":"NERC registered entity ID (2020)"},{"value":"NCR00337","system":"NERC registered entity ID (2015)"},{"value":"2IB00018*FD","system":"Ohio EPA NPDES permit"},{"value":"OH0132373","system":"Ohio EPA application"}] — Source · confidence: medium
- Identifiers: [{"value":"55348","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"4","system":"EIA generator ID"},{"value":"PJM","system":"PJM balancing authority"},{"value":"AD1-118","system":"PJM interconnection queue"},{"value":"NCR11759","system":"NERC registered entity ID (2020)"},{"value":"NCR00337","system":"NERC registered entity ID (2015)"},{"value":"2IB00018*FD","system":"Ohio EPA NPDES permit"},{"value":"OH0132373","system":"Ohio EPA application"}] — Source · confidence: medium
- Identifiers: [{"value":"55348","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"4","system":"EIA generator ID"},{"value":"PJM","system":"PJM balancing authority"},{"value":"AD1-118","system":"PJM interconnection queue"},{"value":"NCR11759","system":"NERC registered entity ID (2020)"},{"value":"NCR00337","system":"NERC registered entity ID (2015)"},{"value":"2IB00018*FD","system":"Ohio EPA NPDES permit"},{"value":"OH0132373","system":"Ohio EPA application"}] — Source · confidence: medium
- Identifiers.1: {"value":"1","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.2: {"value":"2","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.3: {"value":"3","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.4: {"value":"4","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.7: {"value":"NCR11759","system":"NERC registered entity ID (2020)"} — Source · confidence: high
- Identifiers.8: {"value":"NCR00337","system":"NERC registered entity ID (2015)"} — Source · confidence: medium
- Identifiers.9: {"value":"2IB00018*FD","system":"Ohio EPA NPDES permit"} — Source · confidence: high
- Identifiers.10: {"value":"OH0132373","system":"Ohio EPA application"} — Source · confidence: high
- Parties.1: {"relationship":"Plant owner / operator","name":"Troy Energy LLC","official_url":null} — Source · confidence: high
- Parties.2: {"relationship":"NERC registered entity","name":"Troy Energy LLC","official_url":null} — Source · confidence: high
- Site acres: 40 — Troy Energy LLC Expects Early Summer 2002 Commercial Operation of... · confidence: medium
- Construction scope: Natural-gas-fired simple-cycle generation facility with four operating combustion-turbine generators. The EIA record reports four operating generators totaling 795.6 MW, while the NERC facility profile identifies the physical plant as four nominal 160 MW GE 7F A units, or approximately 640 MW nominal total. — Source · confidence: medium
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines/7f — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: medium
- Description: Troy Energy LLC is an operating natural-gas simple-cycle combustion-turbine facility in Luckey, Wood County, Ohio, with four operating generators totaling 795.6 MW of nameplate capacity. The facility is operated by Troy Energy LLC within LS Power’s portfolio; LS Power acquired it from Dynegy in July 2017 as part of the Armstrong and Troy portfolio transaction. The first unit entered service on June 1, 2002, and project sources identify four GE 7F.04 gas turbines. A planned 2019 conversion and approximately 500 MW expansion was later reported canceled, while LS Power announced a separate 2025 proposal to convert the Troy and Armstrong facilities with steam cycles adding approximately 600 MW in total. — Troy Energy Facility, US · confidence: medium
- Description: Troy Energy LLC is an operating natural-gas simple-cycle combustion-turbine facility in Luckey, Wood County, Ohio, with four operating generators totaling 795.6 MW of nameplate capacity. The facility is operated by Troy Energy LLC within LS Power’s portfolio; LS Power acquired it from Dynegy in July 2017 as part of the Armstrong and Troy portfolio transaction. The first unit entered service on June 1, 2002, and project sources identify four GE 7F.04 gas turbines. A planned 2019 conversion and approximately 500 MW expansion was later reported canceled, while LS Power announced a separate 2025 proposal to convert the Troy and Armstrong facilities with steam cycles adding approximately 600 MW in total. — LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion · confidence: medium
- Description: Troy Energy LLC is an operating natural-gas simple-cycle combustion-turbine facility in Luckey, Wood County, Ohio, with four operating generators totaling 795.6 MW of nameplate capacity. The facility is operated by Troy Energy LLC within LS Power’s portfolio; LS Power acquired it from Dynegy in July 2017 as part of the Armstrong and Troy portfolio transaction. The first unit entered service on June 1, 2002, and project sources identify four GE 7F.04 gas turbines. A planned 2019 conversion and approximately 500 MW expansion was later reported canceled, while LS Power announced a separate 2025 proposal to convert the Troy and Armstrong facilities with steam cycles adding approximately 600 MW in total. — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: medium
- Quality notes: ["The current EIA-derived record reports 795.6 MW and four operating units, while 2017 transaction materials reported approximately 640 MW or 770 MW for Troy; these figures reflect different reporting dates or capacity definitions.","The disclosed $480 million amount was portfolio sale consideration, not project financing. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified.","A construction start date and EPC contractor were not disclosed in the gathered sources; commissioning and equipment-supplier information were available."] — LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion · confidence: medium
- Quality notes: ["The current EIA-derived record reports 795.6 MW and four operating units, while 2017 transaction materials reported approximately 640 MW or 770 MW for Troy; these figures reflect different reporting dates or capacity definitions.","The disclosed $480 million amount was portfolio sale consideration, not project financing. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified.","A construction start date and EPC contractor were not disclosed in the gathered sources; commissioning and equipment-supplier information were available."] — Another Ohio Natural Gas-Fired Power Plant Canceled · confidence: medium
- Quality notes: ["The current EIA-derived record reports 795.6 MW and four operating units, while 2017 transaction materials reported approximately 640 MW or 770 MW for Troy; these figures reflect different reporting dates or capacity definitions.","The disclosed $480 million amount was portfolio sale consideration, not project financing. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified.","A construction start date and EPC contractor were not disclosed in the gathered sources; commissioning and equipment-supplier information were available."] — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: medium
- Financing summary: No separate project-finance, construction-finance, or refinancing facility was disclosed for Troy Energy. On February 23, 2017, Dynegy and LS Power agreed to a portfolio sale with a $480 million base purchase price payable in cash for the Armstrong and Troy interests, subject to adjustments. Dynegy reported that the sale closed on July 11, 2017 for approximately $472 million in cash including working-capital adjustments; the proceeds were used for debt reduction. This was sale consideration for a portfolio transaction, not project financing. — Source · confidence: medium
- Timeline: [{"event":"Commercial operation / first unit online","date":"2002-06-01","detail":"The first Troy Energy unit entered service on June 1, 2002. The facility is identified as a four-unit gas plant with 795.6 MW of nameplate capacity."},{"event":"Acquisition agreement signed","date":"2017-02-23","detail":"LS Power agreed to acquire the Armstrong and Troy peaking facilities from Dynegy in a PJM portfolio transaction with a stated $480 million base cash purchase price."},{"event":"Acquisition closed","date":"2017-07-11","detail":"Dynegy completed the sale of its Troy and Armstrong equity interests to LS Power for approximately $472 million in cash, including working-capital adjustments."},{"event":"Expansion proposal","date":"2019-07-15","detail":"LS Power said it was developing a Troy expansion to add approximately 500 MW and convert the plant to combined-cycle operation, requiring more than $500 million of private investment."},{"event":"Expansion canceled","date":"2019-08-28","detail":"A contemporaneous industry report stated that LS Power canceled the approximately $500 million Troy expansion, attributing the decision to Ohio nuclear-subsidy legislation."},{"event":"Proposed repowering / conversion","date":"2025-03-14","detail":"LS Power proposed converting the Troy and Armstrong peaking facilities to base-load combined-cycle plants by adding steam cycles; the two conversion projects were described as adding approximately 600 MW in total."},{"event":"Retirement or completed repowering status","date":null,"detail":"No retirement or completed repowering milestone was identified; the available plant record continues to describe Troy Energy as operational, and the 2025 conversion was presented as a proposal."}] — LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion · confidence: medium
- Timeline: [{"event":"Commercial operation / first unit online","date":"2002-06-01","detail":"The first Troy Energy unit entered service on June 1, 2002. The facility is identified as a four-unit gas plant with 795.6 MW of nameplate capacity."},{"event":"Acquisition agreement signed","date":"2017-02-23","detail":"LS Power agreed to acquire the Armstrong and Troy peaking facilities from Dynegy in a PJM portfolio transaction with a stated $480 million base cash purchase price."},{"event":"Acquisition closed","date":"2017-07-11","detail":"Dynegy completed the sale of its Troy and Armstrong equity interests to LS Power for approximately $472 million in cash, including working-capital adjustments."},{"event":"Expansion proposal","date":"2019-07-15","detail":"LS Power said it was developing a Troy expansion to add approximately 500 MW and convert the plant to combined-cycle operation, requiring more than $500 million of private investment."},{"event":"Expansion canceled","date":"2019-08-28","detail":"A contemporaneous industry report stated that LS Power canceled the approximately $500 million Troy expansion, attributing the decision to Ohio nuclear-subsidy legislation."},{"event":"Proposed repowering / conversion","date":"2025-03-14","detail":"LS Power proposed converting the Troy and Armstrong peaking facilities to base-load combined-cycle plants by adding steam cycles; the two conversion projects were described as adding approximately 600 MW in total."},{"event":"Retirement or completed repowering status","date":null,"detail":"No retirement or completed repowering milestone was identified; the available plant record continues to describe Troy Energy as operational, and the 2025 conversion was presented as a proposal."}] — Another Ohio Natural Gas-Fired Power Plant Canceled · confidence: medium
- Timeline: [{"event":"Commercial operation / first unit online","date":"2002-06-01","detail":"The first Troy Energy unit entered service on June 1, 2002. The facility is identified as a four-unit gas plant with 795.6 MW of nameplate capacity."},{"event":"Acquisition agreement signed","date":"2017-02-23","detail":"LS Power agreed to acquire the Armstrong and Troy peaking facilities from Dynegy in a PJM portfolio transaction with a stated $480 million base cash purchase price."},{"event":"Acquisition closed","date":"2017-07-11","detail":"Dynegy completed the sale of its Troy and Armstrong equity interests to LS Power for approximately $472 million in cash, including working-capital adjustments."},{"event":"Expansion proposal","date":"2019-07-15","detail":"LS Power said it was developing a Troy expansion to add approximately 500 MW and convert the plant to combined-cycle operation, requiring more than $500 million of private investment."},{"event":"Expansion canceled","date":"2019-08-28","detail":"A contemporaneous industry report stated that LS Power canceled the approximately $500 million Troy expansion, attributing the decision to Ohio nuclear-subsidy legislation."},{"event":"Proposed repowering / conversion","date":"2025-03-14","detail":"LS Power proposed converting the Troy and Armstrong peaking facilities to base-load combined-cycle plants by adding steam cycles; the two conversion projects were described as adding approximately 600 MW in total."},{"event":"Retirement or completed repowering status","date":null,"detail":"No retirement or completed repowering milestone was identified; the available plant record continues to describe Troy Energy as operational, and the 2025 conversion was presented as a proposal."}] — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: medium
- Timeline.3: {"event":"Expansion proposal","date":"2019-07-15","detail":"LS Power said it was developing a Troy expansion to add approximately 500 MW and convert the plant to combined-cycle operation, requiring more than $500 million of private investment."} — LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion · confidence: high
- Timeline.4: {"event":"Expansion canceled","date":"2019-08-28","detail":"A contemporaneous industry report stated that LS Power canceled the approximately $500 million Troy expansion, attributing the decision to Ohio nuclear-subsidy legislation."} — Another Ohio Natural Gas-Fired Power Plant Canceled · confidence: medium
- Timeline.5: {"event":"Proposed repowering / conversion","date":"2025-03-14","detail":"LS Power proposed converting the Troy and Armstrong peaking facilities to base-load combined-cycle plants by adding steam cycles; the two conversion projects were described as adding approximately 600 MW in total."} — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: high
- Timeline.6: {"event":"Retirement or completed repowering status","date":null,"detail":"No retirement or completed repowering milestone was identified; the available plant record continues to describe Troy Energy as operational, and the 2025 conversion was presented as a proposal."} — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: medium
- Commercial parties.5: {"relationship":"Combustion-turbine supplier","name":"GE Power","detail":"Project-profile sources identify GE Power as the supplier of four 7F.04 gas turbines for the facility.","official_url":"https://www.ge.com/"} — Troy Energy Facility, US · confidence: medium
- Commercial parties.6: {"relationship":"Operations and maintenance contractor","name":"IHI Power Services Corp.","detail":"Project-profile and NERC materials identify IHI Power Services in connection with Troy Energy’s plant operations and maintenance or compliance support.","official_url":"https://www.ihipower.com/"} — Troy Energy, LLC Registered Entity Acronym · confidence: medium
- Commercial parties.6: {"relationship":"Operations and maintenance contractor","name":"IHI Power Services Corp.","detail":"Project-profile and NERC materials identify IHI Power Services in connection with Troy Energy’s plant operations and maintenance or compliance support.","official_url":"https://www.ihipower.com/"} — Troy Energy Facility, US · confidence: medium
- Quality notes.2: The 2019 approximately 500 MW expansion was reported canceled. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified. — LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion · confidence: medium
- Quality notes.2: The 2019 approximately 500 MW expansion was reported canceled. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified. — Another Ohio Natural Gas-Fired Power Plant Canceled · confidence: medium
- Quality notes.2: The 2019 approximately 500 MW expansion was reported canceled. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified. — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: medium
- Quality notes.3: A construction start date and EPC contractor were not disclosed in the gathered sources; commissioning and equipment-supplier information were available. — Troy Energy Facility, US · confidence: medium
- Acquisition detail: On 2017-07-12, LS Power finalized the purchase of Dynegy’s Troy Energy Facility in Luckey, Ohio, as part of a combined $480 million sale of Troy Energy and Armstrong Energy. — Dynegy Sells Two Energy Units, Agrees to Sell Three More · confidence: medium
- Transaction scope: portfolio_includes_asset — Dynegy Sells Two Energy Units, Agrees to Sell Three More · confidence: high
- Substation: Lemoyne — Source · confidence: high
- Interconnection voltage kv: 345 — Source · confidence: high
- Replacement or repowering: LS Power proposed converting the Troy facility to a baseload combined-cycle plant by adding a steam cycle and other upgrades; no announced cessation date was identified. — LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power · confidence: high
- Grid role: Simple-cycle natural-gas peaking facility. — LS Power to Acquire 1,279 MW Power Generation Portfolio in PJM - LS Power · confidence: high

## Timeline

- 2024-08 — Acquisition closed
  Lightning Power acquired 100% interests in Troy Energy, LLC and other generation facilities through the August 9, 2024 contribution transaction with LS Power.
  Source: lightning power, llc (https://www.sec.gov/Archives/edgar/data/1013871/000110465925092754/tm2526385d1_ex99-2.htm)
- 2025-03-14 — Proposed repowering / conversion
  LS Power proposed converting the Troy and Armstrong peaking facilities to base-load combined-cycle plants by adding steam cycles; the two conversion projects were described as adding approximately 600 MW in total.
  Source: LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power (https://www.lspower.com/news/ls-power-submits-proposal-to-add-new-generation-supply-across-pjm/)

## Sources

- [LS Power to Acquire 1,279 MW Power Generation Portfolio in PJM - LS Power](https://www.lspower.com/news/ls-power-agrees-acquire-1279-mw-power-generation-portfolio-dynegy/) — lspower.com · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=259) — mbrweb.ferc.gov · tier regulatory
- [Troy Energy, LLC Registered Entity Acronym](https://www.nerc.com/globalassets/our-work/reports/regional-audit-reports-of-registered-entities/rfc/2021/ncr11759_troy_rf_pub_2020.pdf) — nerc.com · tier other
- [Source](https://www.nerc.com/globalassets/our-work/reports/regional-audit-reports-of-registered-entities/rfc/2015/2015_public_rf_troy.pdf) — nerc.com · tier other
- [Source](https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/DraftPN/2IB00018.pdf) — dam.assets.ohio.gov · tier regulatory
- [LS Power Submits Proposal to Add New Generation Supply Across PJM - LS Power](https://www.lspower.com/news/ls-power-submits-proposal-to-add-new-generation-supply-across-pjm/) — lspower.com · tier other
- [Troy Energy LLC Expects Early Summer 2002 Commercial Operation of...](https://www.industrialinfo.com/news/article/troy-energy-llc-expects-early-summer-2002-commercial-operation-of-600-mw-electric-peaking-plant-in-o--1088) — industrialinfo.com · tier other
- [Source](https://lspower.com/news/ls-power-agrees-acquire-1279-mw-power-generation-portfolio-dynegy) — lspower.com · tier other
- [7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova](https://www.gevernova.com/gas-power/products/gas-turbines/7f) — gevernova.com · tier other
- [Troy Energy Facility, US](https://www.power-technology.com/marketdata/troy-energy-facility-us/) — power-technology.com · tier other
- [LS Power Announces Ohio Nuclear Subsidy Legislation Will Force Cancellation of its Troy Generating Facility Expansion](https://www.prnewswire.com/news-releases/ls-power-announces-ohio-nuclear-subsidy-legislation-will-force-cancellation-of-its-troy-generating-facility-expansion-300884803.html) — prnewswire.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1379895/000110465917012545/a17-7058_3ex2d1.htm) — sec.gov · tier regulatory
- [Another Ohio Natural Gas-Fired Power Plant Canceled](https://naturalgasintel.com/news/another-ohio-natural-gas-fired-power-plant-canceled-nuclear-subsidies-blamed/) — naturalgasintel.com · tier other
- [Dynegy Sells Two Energy Units, Agrees to Sell Three More](https://www.power-eng.com/gas/dynegy-sells-two-energy-units-agrees-to-sell-three-more/) — power-eng.com · tier other
- [Data Miner 2 - Pricing Nodes](https://dataminer2.pjm.com/feed/pnode) — dataminer2.pjm.com · tier other
- [Source](https://www.firstenergycorp.com/content/dam/corporate/transmission/Ohio/fostoria-lallendorf-cn-part%20I.pdf) — firstenergycorp.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1013871/000110465925092754/tm2526385d1_ex99-2.htm) — sec.gov · tier regulatory

## Data quality

- The current EIA-derived record reports 795.6 MW and four operating units, while 2017 transaction materials reported approximately 640 MW or 770 MW for Troy; these figures reflect different reporting dates or capacity definitions. The disclosed $480 million amount was portfolio sale consideration, not project financing. The 2019 approximately 500 MW expansion was reported canceled. The March 2025 Troy conversion was described as a proposal, and no completed expansion, repowering, or retirement milestone was identified. A construction start date and EPC contractor were not disclosed in the gathered sources; commissioning and equipment-supplier information were available.

---

Canonical page: https://askthegrid.com/assets/facilities/troy-energy-llc

Source: Ask the Grid — https://askthegrid.com/
