# Trumbull Energy Center

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/trumbull-energy-center

Trumbull Energy Center is a natural gas-fired power facility with 977.4 MW of EIA-reported operating capacity in Trumbull County, Ohio, registered as EIA Plant ID 66918. Clean Energy Future - Trumbull, LLC. owns and operates the plant. The plant's generating configuration is dual-fuel natural-gas combined-cycle facility with two Siemens Energy SGT6-8000H V1.6 combustion turbines, two heat-recovery steam generators, and one steam turbine in a 2 2 1 configuration. The facility interconnects at Trumbull Substation at 345 kV.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 977.4 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM
- Substation: Trumbull Substation
- Point of interconnection: Trumbull Substation
- Transmission owner: American Transmission Systems, Incorporated (ATSI), a FirstEnergy company
- Interconnection voltage: 345 kV

## Source-backed facts

- Description: Trumbull Energy Center is a 977.4-MW natural-gas-fired combined-cycle facility in Lordstown, Trumbull County, Ohio. EIA identifies three generators at the plant: GT11, GT12, and STG. The facility connects to PJM and uses Siemens Energy H-class technology. — KIND-ENERGYCENTER · confidence: medium
- Identifiers.5: {"value":"PJM","system":"ISO/RTO"} — White & Case advises Clean Energy Future-Trumbull LLC on financing for natural gas fired electric combined cycle power generation facility | White & Case LLP · confidence: high
- Identifiers.7: {"value":"3IN00398*BD","system":"Ohio EPA permit"} — Source · confidence: high
- Parties.3: {"relationship":"Equity sponsor and technology supplier","name":"Siemens Energy, Inc.","official_url":"https://www.siemens-energy.com/us/en/home.html"} — KIND-ENERGYCENTER · confidence: high
- Parties.5: {"relationship":"EPC contractor","name":"Gemma Power Systems","official_url":"https://www.gemmapower.com/our-work/combined-cycle/trumbull-energy-center"} — Argan, Inc.'s Gemma Power Systems Receives Full Notice... · confidence: high
- Parties.5: {"relationship":"EPC contractor","name":"Gemma Power Systems","official_url":"https://www.gemmapower.com/our-work/combined-cycle/trumbull-energy-center"} — Trumbull Energy Center Ohio · confidence: high
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Kind: thermal — Trumbull Energy Center · confidence: high
- Manufacturer domain: siemens-energy.com — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Equipment models: [{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html","count":2,"unit_mw":310,"name":"SGT6-8000H (V1.6) combustion turbine"},{"manufacturer_domain":null,"product_url":null,"count":2,"unit_mw":null,"name":"Heat recovery steam generator (HRSG)"},{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/industrial-steam-turbines.html","count":1,"unit_mw":null,"name":"Siemens Energy steam turbine"}] — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Product family: SGT6-8000H (V1.6) — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Equipment models.0: {"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html","count":2,"unit_mw":310,"name":"SGT6-8000H (V1.6) combustion turbine"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Equipment models.1: {"manufacturer_domain":null,"product_url":null,"count":2,"unit_mw":null,"name":"Heat recovery steam generator (HRSG)"} — Trumbull Energy Center · confidence: medium
- Equipment models.2: {"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/industrial-steam-turbines.html","count":1,"unit_mw":null,"name":"Siemens Energy steam turbine"} — Industrial steam turbines · confidence: medium
- Significance: Trumbull Energy Center is a large PJM generation asset designed as a 950-MW dual-fuel combined-cycle plant using two Siemens Energy SGT6-8000H H-class combustion turbines, two heat-recovery steam generators, and one steam turbine in a 2x2x1 configuration. The project was developed to help address the power gap associated with retiring coal plants and to provide reliable capacity in the PJM market. — Source · confidence: medium
- Quality notes: ["Published capacity figures differ by source: the official project page describes a 950-MW maximum design capacity, the U.S. EPA describes a 940-MW facility, and a plant dataset reports 977.4 MW in aggregate. The 950-MW design figure is used in the directory description.","No acquisition, sale, predecessor-owner transaction, or sale consideration for the exact Trumbull Energy Center was identified. The February 2024 Macquarie transaction was for the separate Lordstown Energy Center, which began operating in 2018.","Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified."] — KIND-ENERGYCENTER · confidence: medium
- Quality notes: ["Published capacity figures differ by source: the official project page describes a 950-MW maximum design capacity, the U.S. EPA describes a 940-MW facility, and a plant dataset reports 977.4 MW in aggregate. The 950-MW design figure is used in the directory description.","No acquisition, sale, predecessor-owner transaction, or sale consideration for the exact Trumbull Energy Center was identified. The February 2024 Macquarie transaction was for the separate Lordstown Energy Center, which began operating in 2018.","Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified."] — Trumbull Energy Center | US EPA · confidence: medium
- Quality notes: ["Published capacity figures differ by source: the official project page describes a 950-MW maximum design capacity, the U.S. EPA describes a 940-MW facility, and a plant dataset reports 977.4 MW in aggregate. The 950-MW design figure is used in the directory description.","No acquisition, sale, predecessor-owner transaction, or sale consideration for the exact Trumbull Energy Center was identified. The February 2024 Macquarie transaction was for the separate Lordstown Energy Center, which began operating in 2018.","Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified."] — Hanwha Power Commissions Ohio CCGT Plant · confidence: medium
- Financing summary: In November 2022, financing was arranged for an expected total project cost of approximately US$1.3 billion. The package comprised a senior construction and term credit facility, a mezzanine credit facility, and equity contributions from KOSPO, Siemens Energy, and KIND; individual lenders were not named. Project finance was reported as finalized before Gemma received full notice to proceed in December 2022. Reported US$1.2 billion to US$1.3 billion figures represent project cost or investment estimates, not sale consideration; no acquisition price or sale proceeds for Trumbull Energy Center were identified. — Trumbull Energy Center · confidence: medium
- Financing summary: In November 2022, financing was arranged for an expected total project cost of approximately US$1.3 billion. The package comprised a senior construction and term credit facility, a mezzanine credit facility, and equity contributions from KOSPO, Siemens Energy, and KIND; individual lenders were not named. Project finance was reported as finalized before Gemma received full notice to proceed in December 2022. Reported US$1.2 billion to US$1.3 billion figures represent project cost or investment estimates, not sale consideration; no acquisition price or sale proceeds for Trumbull Energy Center were identified. — After delays, 950 MW CCGT project gets underway using Siemens turbines · confidence: medium
- Commercial parties.3: {"relationship":"Equity sponsor and technology supplier","name":"Siemens Energy, Inc.","detail":"Equity sponsor and supplier of the two SGT6-8000H H-class combustion turbines, heat-recovery steam generators, and steam-turbine technology.","official_url":"https://www.siemens-energy.com/us/en/home.html"} — Source · confidence: high
- Commercial parties.6: {"relationship":"Equipment supplier and long-term service provider","name":"Hanwha Power","detail":"Supplied three fuel-gas compressors and secured a nine-year long-term service agreement covering capital spare parts and maintenance services through three major overhaul cycles.","official_url":"https://www.hanwha.com/"} — Hanwha Power Commissions Ohio CCGT Plant · confidence: high
- Quality notes.0: Published capacity figures differ by source: the official project page describes a 950-MW maximum design capacity, the U.S. EPA describes a 940-MW facility, and a plant dataset reports 977.4 MW in aggregate. The 950-MW design figure is used in the directory description. — KIND-ENERGYCENTER · confidence: medium
- Quality notes.2: Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified. — KIND-ENERGYCENTER · confidence: high
- Quality notes.2: Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified. — Electric Power Monthly - U.S. Energy Information... · confidence: high
- Quality notes.2: Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified. — Hanwha Power Commissions Ohio CCGT Plant · confidence: high
- Timeline.0: {"event":"Initial proposal","date":"2015","detail":"The Trumbull Energy Center was first proposed as a natural-gas-fired combined-cycle project, with an originally projected 2020 in-service date."} — After delays, 950 MW CCGT project gets underway using Siemens turbines · confidence: medium
- Timeline.1: {"event":"Earlier permit application","date":"2017","detail":"The Ohio EPA record identifies an associated permit application received on February 16, 2017."} — Trumbull Energy Center | US EPA · confidence: high
- Timeline.2: {"event":"Permit application","date":"2019-12-11","detail":"The Ohio EPA record identifies December 11, 2019 as the receipt date for the permit application associated with the facility's permit."} — Trumbull Energy Center | US EPA · confidence: high
- Timeline.3: {"event":"Financing finalized and construction began","date":"2022-11","detail":"Project finance was finalized and construction began after financing closed in 2022. White & Case described an expected total project cost of approximately US$1.3 billion."} — Work underway at $1.2B Trumbull Energy Center as private ceremony takes place | News, Sports, Jobs - Tribune Chronicle · confidence: medium
- Timeline.6: {"event":"First turbine delivered","date":"2023-10","detail":"The first Siemens turbine was delivered to the project site."} — Trumbull Energy Center power station - Global Energy Monitor · confidence: medium
- Timeline.7: {"event":"Final construction phase","date":"2025-06","detail":"The project was reported to have completed multiple construction phases and to be transitioning to equipment installation, commissioning, and testing."} — Trumbull Energy Center power station - Global Energy Monitor · confidence: medium
- Timeline.8: {"event":"Scheduled commercial operation","date":"2026-02","detail":"The project website identified February 2026 as the scheduled start of commercial operation; a contemporaneous project profile gave January 31, 2026 as a targeted commercial-operation date."} — KIND-ENERGYCENTER · confidence: medium
- Timeline.8: {"event":"Scheduled commercial operation","date":"2026-02","detail":"The project website identified February 2026 as the scheduled start of commercial operation; a contemporaneous project profile gave January 31, 2026 as a targeted commercial-operation date."} — Trumbull Energy Center power station - Global Energy Monitor · confidence: medium
- Timeline.9: {"event":"Commissioning and start-up","date":"2026-06-24","detail":"Hanwha reported that the Trumbull Energy Center's commissioning and grand-opening ceremony marked successful start-up of the 950-MW facility."} — Hanwha Power Commissions Ohio CCGT Plant · confidence: high
- Substation: Trumbull Substation — Source · confidence: high
- Interconnection voltage kv: 345 — 16-2444-EL-BGN:Trumbull Energy Center · confidence: high
- Interconnection voltage kv: 345 — Source · confidence: high
- Balancing authority: PJM — Source · confidence: high
- Status date: 2026-06-24 — Source · confidence: high
- Status detail: The plant was successfully commissioned and opened on 2026-06-24. EIA's April 2026 record lists GT11, GT12, and STG at plant 66918 as natural-gas-fired combined-cycle generators. — Source · confidence: medium
- Operating status: operating — Source · confidence: high

## Timeline

- 2015 — Initial proposal
  The Trumbull Energy Center was first proposed as a natural-gas-fired combined-cycle project, with an originally projected 2020 in-service date.
  Source: After delays, 950 MW CCGT project gets underway using Siemens turbines (https://www.power-eng.com/gas/turbines/after-delays-950-mw-ccgt-project-gets-underway-using-siemens-turbines/)
- 2017 — Earlier permit application
  The Ohio EPA record identifies an associated permit application received on February 16, 2017.
  Source: Trumbull Energy Center | US EPA (https://www.epa.gov/nsr/trumbull-energy-center)
- 2019-12-11 — Permit application
  The Ohio EPA record identifies December 11, 2019 as the receipt date for the permit application associated with the facility's permit.
  Source: Trumbull Energy Center | US EPA (https://www.epa.gov/nsr/trumbull-energy-center)
- 2023-04 — Site preparation and groundbreaking
  A private ceremonial groundbreaking was held while site preparation was underway; tree clearing at the 23-acre site had begun in December 2022.
  Source: Work underway at $1.2B Trumbull Energy Center as private ceremony takes place | News, Sports, Jobs - Tribune Chronicle (https://www.tribtoday.com/news/local-news/2023/04/work-underway-at-1-2b-trumbull-energy-center-as-private-ceremony-takes-place/)
- 2023-10 — First turbine delivered
  The first Siemens turbine was delivered to the project site.
  Source: Trumbull Energy Center power station - Global Energy Monitor (https://www.gem.wiki/Trumbull_Energy_Center_power_station)
- 2025-06 — Final construction phase
  The project was reported to have completed multiple construction phases and to be transitioning to equipment installation, commissioning, and testing.
  Source: Trumbull Energy Center power station - Global Energy Monitor (https://www.gem.wiki/Trumbull_Energy_Center_power_station)
- 2026-06-24 — Commissioning and start-up
  Hanwha reported that the Trumbull Energy Center's commissioning and grand-opening ceremony marked successful start-up of the 950-MW facility.
  Source: Hanwha Power Commissions Ohio CCGT Plant (https://www.hanwha.com/newsroom/news/press-releases/hanwha-power-enters-us-market-with-successful-commissioning-of-trumbull-energy-center-combined-cycle-gas-turbine-power-plant.do)

## Sources

- [cleanenergyfuturellc.com this domain has already been registered. However, interested party can still solicit a request to buy it from owner.](https://cleanenergyfuturellc.com/) — cleanenergyfuturellc.com · tier other
- [KIND-ENERGYCENTER](https://www.trumbullenergycenter.com/) — trumbullenergycenter.com · tier other
- [Electric Power Monthly - U.S. Energy Information Administration (EIA)](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_03) — eia.gov · tier regulatory
- [Source](https://dam.assets.ohio.gov/image/upload/epa.ohio.gov/Portals/35/permits/DraftPN/3IN00398.pdf) — dam.assets.ohio.gov · tier regulatory
- [White & Case advises Clean Energy Future-Trumbull LLC on financing for natural gas fired electric combined cycle power generation facility | White & Case LLP](https://www.whitecase.com/news/press-release/white-case-advises-clean-energy-future-trumbull-llc-financing-natural-gas-fired) — whitecase.com · tier other
- [Argan, Inc.'s Gemma Power Systems Receives Full Notice ...](https://www.businesswire.com/news/home/20221108006189/en/Argan-Inc.s-Gemma-Power-Systems-Receives-Full-Notice-to-Proceed-for-a-950-MW-Power-Project-in-Ohio) — businesswire.com · tier other
- [Trumbull Energy Center](https://www.gemmapower.com/our-work/combined-cycle/trumbull-energy-center) — gemmapower.com · tier other
- [Work underway at $1.2B Trumbull Energy Center as private ceremony takes place | News, Sports, Jobs - Tribune Chronicle](https://www.tribtoday.com/news/local-news/2023/04/work-underway-at-1-2b-trumbull-energy-center-as-private-ceremony-takes-place/) — tribtoday.com · tier other
- [Hanwha Power Commissions Ohio CCGT Plant](https://www.hanwha.com/newsroom/news/press-releases/hanwha-power-enters-us-market-with-successful-commissioning-of-trumbull-energy-center-combined-cycle-gas-turbine-power-plant.do) — hanwha.com · tier other
- [SGT6-8000H Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html) — siemens-energy.com · tier other
- [Industrial steam turbines](https://www.siemens-energy.com/global/en/home/products-services/product/industrial-steam-turbines.html) — siemens-energy.com · tier other
- [Source](https://hanwha.com/newsroom/news/press-releases/hanwha-power-enters-us-market-with-successful-commissioning-of-trumbull-energy-center-combined-cycle-gas-turbine-power-plant.do) — hanwha.com · tier other
- [Trumbull Energy Center | US EPA](https://www.epa.gov/nsr/trumbull-energy-center) — epa.gov · tier regulatory
- [After delays, 950 MW CCGT project gets underway using Siemens turbines](https://www.power-eng.com/gas/turbines/after-delays-950-mw-ccgt-project-gets-underway-using-siemens-turbines/) — power-eng.com · tier other
- [Trumbull Energy Center power station - Global Energy Monitor](https://www.gem.wiki/Trumbull_Energy_Center_power_station) — gem.wiki · tier other
- [Source](https://gemmapower.com/our-work/combined-cycle/trumbull-energy-center) — gemmapower.com · tier other
- [Trumbull Energy Center heads to fundraising phase - Tribune Chronicle](https://www.tribtoday.com/news/local-news/2019/02/trumbull-energy-center-heads-to-fundraising-phase/) — tribtoday.com · tier other
- [Whitehall — Transactions](https://www.whitehallandcompany.com/transactions) — whitehallandcompany.com · tier other
- [Source](https://whitecase.com/news/press-release/white-case-advises-clean-energy-future-trumbull-llc-financing-natural-gas-fired) — whitecase.com · tier other
- [Source](https://www.pjm.com/-/media/DotCom/etools/capacity-exchange/erpm-designated.csv) — pjm.com · tier other
- [16-2444-EL-BGN:Trumbull Energy Center](https://opsb.ohio.gov/cases/16-2444-el-bgn) — opsb.ohio.gov · tier regulatory
- [Source](https://www.firstenergycorp.com/content/dam/corporate/transmission/Ohio/hanna-highland-cn.pdf) — firstenergycorp.com · tier other

## Data quality

- Published capacity figures differ by source: the official project page describes a 950-MW maximum design capacity, the U.S. EPA describes a 940-MW facility, and a plant dataset reports 977.4 MW in aggregate. The 950-MW design figure is used in the directory description. No acquisition, sale, predecessor-owner transaction, or sale consideration for the exact Trumbull Energy Center was identified. The February 2024 Macquarie transaction was for the separate Lordstown Energy Center, which began operating in 2018. Commercial-operation timing is reported differently: the project website targeted February 2026, EIA monthly data show a 2026/4 date associated with generator GT12, and Hanwha reported successful commissioning and start-up on June 24, 2026. No expansion, retirement, or repowering milestone was identified.

---

Canonical page: https://askthegrid.com/assets/facilities/trumbull-energy-center