# Vantage TX22 - San Antonio

ERCOT data center · https://askthegrid.com/assets/facilities/vantage-tx22-san-antonio

Vantage Data Centers owns and will operate TX22, a proposed two-story, 214,526-square-foot hyperscale facility on 31 acres at 5207 Rogers Road, San Antonio, served by CPS Energy. TDLR registration is complete; construction is scheduled October 22, 2025 through June 15, 2027. The facility is designed to support cloud, AI/HPC, colocation, and enterprise workloads; no power capacity or commercial-operation date is established.

## Identity and location

- Operating status: proposed
- Asset scope: facility
- Location: 5207 Rogers Road, San Antonio, Bexar County, TX
- Owner: Retained Vantage Data Centers Development (exact asset)
- Developer: Retained Vantage Data Centers Development (exact asset)
- Operator: Vantage Data Centers (exact asset) — https://vantage-dc.com/

## Power and grid context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: CPS Energy

## Development

- Site status: Proposed; TDLR project registered. Scheduled construction dates are October 22, 2025 through June 15, 2027; no evidence establishes that TX22 is operating.
- Site area: 31 acres
- Gross floor area: 214,526 square feet
- Construction: Vantage Data Centers TX22 is a privately funded, privately owned-site, new two-story data center for data processing at 5207 Rogers Road, San Antonio. The TDLR registration schedules construction to start on October 22, 2025, and complete on June 15, 2027. The permit records the project as registered; it does not establish commercial operation.

## Compute and operations

- Facility classes: hyperscale, colocation, cloud, ai_hpc, enterprise, telecom_edge
- Workloads: hyperscale cloud infrastructure, AI infrastructure, high-density colocation, enterprise and SaaS hybrid-cloud deployments, telecommunications and content-provider workloads, AI/HPC and analytics workloads
- Operating context: Planned Vantage Data Centers TX22 facility at 5207 Rogers Road: a privately funded, two-story data center for data processing, with construction scheduled from October 2025 through June 2027. The TDLR filing identifies no tenant assigned; the intended model is wholesale/hyperscale-oriented colocation operated by Vantage Data Centers.

## Sources

- [http://datacenter.fyi/state/tx/san-antonio](http://datacenter.fyi/state/tx/san-antonio)
- [http://ercot.com/about](http://ercot.com/about)
- [Vantage Data Centers TX22](https://centexdatacenters.org/tracker/vantage-tx22-san-antonio)
- [Vantage Data Centers TX22 | 5207 Rogers Road, San ...](https://datacenterhawk.com/marketplace/providers/vantage-data-centers/5207-rogers-road/tx22)
- [Data Centers Bringing Major New Pollution Sources to San Antonio’s West Side](https://deceleration.news/data-centers-major-new-air-pollution-san-antonio/) — Deceleration · 2026-06-08
- [Fetched web page](https://environmentalintegrity.org/wp-content/uploads/2026/07/2026-07-22-Vantage-Voltagrid-NOI_final.pdf)
- [Fetched web page](https://environmentalintegrity.org/wp-content/uploads/2026/07/List-of-participants-in-San-Antonio-public-hearing.pdf)
- [Vantage Data Centers COM-IFO-PMT25-40500361](https://mlq.ai/permit-filings/usa/texas/san-antonio/com-ifo-pmt25-40500361/)
- [Vantage Data Centers COM-SIT-PMT25-40100446 — San Antonio, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/san-antonio/com-sit-pmt25-40100446/)
- [Vantage Data Centers TABS2026003003 — San Antonio, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/san-antonio/tabs2026003003/)
- [Vantage Data Centers - Flexible and Scalable Data Centers](https://vantage-dc.com/)
- [Data Center Locations - Vantage Data Centers](https://vantage-dc.com/data-center-locations/)
- [Lobbyist System](https://webapp1.sanantonio.gov/LobbyistSearch/Search.aspx?AgentLink=%20Ashley%20Farrimond&SDate=3/21/2022&EDate=3/21/2026)
- [Vantage buys two land plots in San Antonio, Texas - DCD](https://www.datacenterdynamics.com/en/news/vantage-buys-two-land-plots-in-san-antonio-texas/)
- [Vantage files to build another data center in San Antonio, Texas - DCD](https://www.datacenterdynamics.com/en/news/vantage-files-to-build-another-data-center-in-san-antonio-texas/) — Data Center Dynamics · 2025-10-15
- [Vantage San Antonio II Campus Data Center | 5207 Rogers Rd](https://www.datacentermap.com/usa/texas/san-antonio/vantage-san-antonio-ii-campus/)
- [Vantage TX22 - San Antonio Data Center | 5207 Rogers Rd](https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/)
- [Vantage Data Centers: TX22 - San Antonio ...](https://www.datacenters.com/vantage-tx22-san-antonio)
- [Denver company plans to build $277M data center in San Antonio](https://www.expressnews.com/business/article/san-antonio-data-centers-vantage-development-21055301.php)
- [Environmental groups threaten lawsuit over San Antonio data centers](https://www.expressnews.com/business/article/sierra-club-san-antonio-data-centers-pollution-22355556.php) — San Antonio Express-News · 2026-07-22
- [Vantage TX22 San Antonio Data Center Watch - Low Voltage Nation](https://www.lowvoltagenation.com/posts/vantage-tx22-san-antonio-data-center-watch)
- [Vantage Data Centers COM-SIT-PMT25-40100446 — San Antonio, TX | MLQ Infrastructure](https://www.mlq.ai/permit-filings/usa/texas/san-antonio/com-sit-pmt25-40100446/)
- [$272M data center to supercharge San Antonio’s tech growth](https://www.mysanantonio.com/business/article/data-centers-san-antonio-texas-21109645.php) — MySA · 2025-10-21
- [Incentives  - City of San Antonio](https://www.sanantonio.gov/edd/development-opportunities/Incentives)
- [Notice and Comment Hearing: Vantage Data Centers TX21, LLC, O4790 - Texas Commission on Environmental Quality - www.tceq.texas.gov](https://www.tceq.texas.gov/agency/decisions/hearings/events/notice-and-comment-hearing-vantage-data-centers-tx21-llc-o4790)
- [Fetched web page](https://www.tceq.texas.gov/downloads/agency/decisions/hearings/notices/2026/2026-05-28-vantage-data-centers-tx21-llc-o4790-nch.pdf/%40%40download/file/2026-05-28-vantage-data-centers-tx21-llc-o4790-nch.pdf)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2026003003)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026003003)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026003003)
- [Environmental groups threaten Clean Air Act lawsuit over San Antonio data centers | TPR](https://www.tpr.org/podcast/the-source/2026-07-27/environmental-groups-threaten-clean-air-act-lawsuit-over-san-antonio-data-centers) — Texas Public Radio · 2026-07-27

## Data quality

- The exact asset is Vantage TX22 at 5207 Rogers Road, San Antonio, registered as TABS2026003003. Several reports use “TX2” or discuss the broader Rogers Road campus, which includes more than one Vantage facility; those reports are classified as campus_or_phase rather than treated as TX22-only evidence.
- The TCEQ hearing and Clean Air Act notice concern the Rogers Road campus and the Vantage Data Center TX2/TX21 permit structure. They should not be used to attribute details from Vantage’s separate Omicron Drive site to TX22.
- No unsupported MW, water-use, PUE/WUE, tenant, equipment, or commercial-term claims are included as TX22 facts. Allegations in the environmental groups’ notice are reported as allegations, not adjudicated violations.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---