# Verizon Wireless Mew Building

ERCOT data center · https://askthegrid.com/assets/facilities/verizon-wireless-mew-building

Verizon owns and operates the Verizon Wireless Mew Building, part of the Southlake Data Hall Campus at 500 W. Dove Road in Southlake, Texas. The first phase comprises three buildings (two data halls and one operations building) totaling 97,500 gross square feet, with construction completed in November 2023. No power capacity or commercial-operation date was found in available records.

## Identity and location

- Operating status: operating
- Asset scope: building
- Location: 500 W. Dove Road, Southlake, Tarrant County, TX
- Owner: Verizon (phase) — https://www.verizon.com/
- Regulator: Texas Department of Licensing and Regulation (phase) — https://www.tdlr.texas.gov/TABS/Projects/TABS2022014205
- Design firm: HKS (phase)

## Power and grid context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Substation: An unnamed substation is referenced inside the Verizon Southlake facility, but no substation name or confirmed data-hall interconnection relationship is provided.

## Development

- Site status: Operating; the associated TDLR project permit is closed.
- Gross floor area: 97,500 square feet
- Buildings: 3
- Construction: First phase of the Southlake Data Hall Campus: new construction of two data halls and one operations building, plus a loading dock and equipment yards. The buildings are single-story tilt-wall construction. The TDLR permit lists a construction start date of April 4, 2022, completion date of November 30, 2023, estimated cost of $187,675,500, and project status as closed.

## Compute and operations

- Facility classes: telecom_edge
- Workloads: Verizon wireless network monitoring and control, Telecommunications network operations, Mission-critical data-center compute supporting Verizon network functions
- Operating context: Verizon-owned, internally operated mission-critical telecommunications network-operations and data-center facility. Public project records describe the first phase as two data halls and an operations building; a related facility description identifies a communication control center, Network Operations Center, Mobile Switching Center, and data center supporting Verizon's wireless network.

## Sources

- [http://dchub.cloud/facilities/verizon-wireless-mew-building-verizon-wireless-mew-building-e64f3468](http://dchub.cloud/facilities/verizon-wireless-mew-building-verizon-wireless-mew-building-e64f3468)
- [http://tdlr.texas.gov/TABS/Projects/TABS2022014205](http://tdlr.texas.gov/TABS/Projects/TABS2022014205)
- [Southlake Verizon facility expands with data center ...](https://communityimpact.com/grapevine-colleyville-southlake/city-county/southlake-verizon-facility-expands-with-data-center-operations-building/) — Community Impact · 2022-03-01
- [description: Verizon Wireless Mew Building is a data center in Grapevine, TX, US. View specs, location, power & connectivity on DC Hub. title: Verizon Wireless Mew Building — Data Center](https://dchub.cloud/facilities/verizon-wireless-mew-building-verizon-wireless-mew-building-e64f3468)
- [Verizon Wireless Mew Building Map - Tarrant, Texas, USA](https://mapcarta.com/W989325195)
- [Mar 01, 2022 City Council - Southlake, TX](https://southlaketx.new.swagit.com/videos/155493)
- [Jan 05, 2017 Planning and Zoning Commission - Southlake, TX](https://southlaketx.new.swagit.com/videos/81092)
- [https://weblink.cityofsouthlake.com/WebLink/DocView.aspx?id=2008990&dbid=0&repo=Southlake](https://weblink.cityofsouthlake.com/WebLink/DocView.aspx?id=2008990&dbid=0&repo=Southlake)
- [2011-09-26 Meeting Report (Verizon) - IIS Windows Server](https://weblink.cityofsouthlake.com/WebLink/DocView.aspx?id=2598647&dbid=0&repo=Southlake)
- [Verizon Wireless is opening data center campus in Southlake - Dallas Business Journal](https://www.bizjournals.com/dallas/news/2022/03/03/verizon-data-center-southlake.html) — Dallas Business Journal · 2022-03-03
- [New data center campus will adjoin existing Verizon facility](https://www.dallasnews.com/business/real-estate/2022/03/03/big-verizon-data-center-campus-planned-for-southlake/) — The Dallas Morning News · 2022-03-03
- [Texas Data Center Facilities, Permits & Public Records | datacenter.fyi](https://www.datacenter.fyi/state/tx)
- [Verizon gains approval for 210,000 sq ft data center in Southlake, Texas - DCD](https://www.datacenterdynamics.com/en/news/verizon-gains-approval-for-210000-sq-ft-data-center-in-southlake-texas/) — Data Center Dynamics · 2022-03-03
- [Oncor](https://www.oncor.com/content/oncorwww/us/en/home.html)
- [EXTERNAL AFFAIRS](https://www.oncor.com/content/oncorwww/us/en/home/about-us/external-affairs.html)
- [ONCOR SERVICE AREA MAP](https://www.oncor.com/content/oncorwww/us/en/home/about-us/service-area-map.html)
- [Community Data | Select Southlake](https://www.selectsouthlake.com/maps-and-data/community-data/)
- [Homepage - Texas Commission on Environmental Quality ...](https://www.tceq.texas.gov/)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2022014205)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022014205)
- [Verizon Southlake Data Center by RSG Group - Construction Management Consulting in Southlake, TX | ProView](https://www.thebluebook.com/iProView/1563219/rsg-group-construction-management-consulting/subcontractors//construction-projects/verizon-southlake-data-center-249282/)
- [Fetched web page](https://www.verizon.com/about/sites/default/files/2024-Responsible-Business-Report.pdf)

## Data quality

- The exact asset is identified in the official TDLR record as the VzW Mew Building within the Southlake Data Hall Campus at 500 W. Dove Road, Southlake, Texas.
- The TDLR record describes Phase 1 as 97,500 square feet, while local and trade reporting describes the broader planned campus as more than 200,000 or approximately 210,000 square feet. These figures should not be treated as interchangeable.
- The reviewed evidence does not establish MW demand, water use, PUE, WUE, cooling systems, generator count, tenants, commercial terms, or a dedicated utility arrangement.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/verizon-wireless-mew-building
Profile generated: 2026-07-28T00:03:52.281967Z
Source: Ask the Grid — https://askthegrid.com/
