# Waco Solar

ERCOT asset profile · https://askthegrid.com/assets/facilities/waco-solar

NextEra Energy Resources · Limestone County · ERCOT

Waco Solar is a utility-scale photovoltaic facility in Limestone County, Texas. EIA's May 2026 inventory reports one 400 MWac operating generator, 544.54 MWdc, and a March 2024 registry operating date. Texas Chapter 313 filings describe the 400 MWac project as approximately 1.35 million photovoltaic panels and 129 central inverters.

## Profile

- **Grid role:** Utility-scale solar generation in ERCOT.
- **EIA scope:** One 400 MWac operating generator with 544.54 MWdc capacity.
- **Physical build:** The reviewed Chapter 313 application describes 1,349,398 photovoltaic panels and 129 central inverters for the 400 MWac facility.
- **Development scope:** NextEra's current project page describes two Waco Solar phases with up to 600 MW combined capacity; that broader plan is not the same scope as EIA Plant ID 65762.

## Metrics

- **Solar AC capacity:** 400 MW — EIA May 2026
- **Solar DC capacity:** 544.54 MW — EIA May 2026
- **Photovoltaic panels:** 1,349,398 — Chapter 313 application
- **Central inverters:** 129 — Chapter 313 application
- **EIA operating date:** March 2024 — EIA May 2026
- **Registry anchor:** Plant 65762 — Waco Solar, LLC

## Facts

- **Solar capacity:** 400 MWac / 544.54 MWdc — EIA May 2026 · confidence: high
- **Panels:** 1,349,398 — Texas Comptroller filing · confidence: high
- **Central inverters:** 129 — Texas Comptroller filing · confidence: high
- **Registered operator:** Waco Solar, LLC — EIA May 2026 · confidence: high

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Waco Solar Chapter 313 application](https://assets.comptroller.texas.gov/ch313/1603/1603-coolidge-waco-app.pdf) — Texas Comptroller of Public Accounts · regulatory — Exact 400 MWac project scope, panel count, inverter count, and planned infrastructure.

---

Canonical page: https://askthegrid.com/assets/facilities/waco-solar
Website: [NextEra Energy Resources](https://nexteraenergyresources.com/)
Profile published: 2026-07-17T03:34:58.119Z