# West Deptford Energy Station

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/west-deptford-energy-station

West Deptford Energy Station is a natural gas-fired power facility with 754.6 MW of EIA-reported nameplate capacity in Gloucester County, New Jersey, registered as EIA Plant ID 56963. Marubeni Corporation is the current owner; West Deptford Energy LLC is the registered plant entity or operator. The station's integrated black-start system was described as a practically unprecedented power-sector milestone because it can restart other connected power plants; the project was also named an Engineering News-Record Best Project of 2015.
ACE-W-DEPTFORD-1-CC · 230 kV.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 754.6 MW
- Operating status: operating
- Retirement: 2026

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: lspower.com — West Deptford Energy Holdings LLC Senior Secured · confidence: medium
- Owner logo domain: lspower.com — LS Power: Home · confidence: medium
- Identifiers: [{"value":"56963","system":"EIA plant ID"},{"value":"PJM Interconnection, LLC (PJM)","system":"Balancing authority / ISO-RTO"},{"value":"E101","system":"EIA generator ID"},{"value":"E102","system":"EIA generator ID"},{"value":"STG1","system":"EIA generator ID"},{"value":"700","system":"EIA unit code"},{"value":"ACE-W-DEPTFORD-1-CC","system":"PJM RTO/ISO LMP node"},{"value":"W4-016","system":"PJM interconnection queue ID; withdrawn"},{"value":"Q90","system":"Historical PJM interconnection queue position"},{"value":"ER14-19-000","system":"FERC MBR docket"},{"value":"EL25-47-000","system":"FERC rate-investigation docket"},{"value":"12-1340","system":"U.S. Court of Appeals / FERC case"},{"value":"PJME","system":"FERC market / balancing-area designation"}] — Source · confidence: medium
- Identifiers: [{"value":"56963","system":"EIA plant ID"},{"value":"PJM Interconnection, LLC (PJM)","system":"Balancing authority / ISO-RTO"},{"value":"E101","system":"EIA generator ID"},{"value":"E102","system":"EIA generator ID"},{"value":"STG1","system":"EIA generator ID"},{"value":"700","system":"EIA unit code"},{"value":"ACE-W-DEPTFORD-1-CC","system":"PJM RTO/ISO LMP node"},{"value":"W4-016","system":"PJM interconnection queue ID; withdrawn"},{"value":"Q90","system":"Historical PJM interconnection queue position"},{"value":"ER14-19-000","system":"FERC MBR docket"},{"value":"EL25-47-000","system":"FERC rate-investigation docket"},{"value":"12-1340","system":"U.S. Court of Appeals / FERC case"},{"value":"PJME","system":"FERC market / balancing-area designation"}] — Federal Register :: West Deptford Energy, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date · confidence: medium
- Canonical name: West Deptford Energy Station — EIA - MBR Portal - Federal Energy Regulatory Commission · confidence: high
- Identifiers.8: {"value":"Q90","system":"Historical PJM interconnection queue position"} — Source · confidence: medium
- Identifiers.10: {"value":"EL25-47-000","system":"FERC rate-investigation docket"} — Federal Register :: West Deptford Energy, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date · confidence: high
- Parties.1: {"relationship":"Current majority owner; operator through an affiliate","name":"LS Power Group","official_url":"https://www.lspower.com/"} — West Deptford Energy Holdings LLC Senior Secured · confidence: medium
- Parties.1: {"relationship":"Current majority owner; operator through an affiliate","name":"LS Power Group","official_url":"https://www.lspower.com/"} — LS Power: Home · confidence: medium
- Parties.2: {"relationship":"Current minority owner","name":"Ullico Group","official_url":null} — West Deptford Energy Holdings LLC Senior Secured · confidence: medium
- Parties.5: {"relationship":"Historical equity owner; 17.5% interest reported in 2024","name":"Kansai Electric Power Co., Inc.","official_url":"https://www.kepco.co.jp/english/"} — West Deptford Energy Holdings LLC 'CCC' Senior Se · confidence: medium
- Parties.5: {"relationship":"Historical equity owner; 17.5% interest reported in 2024","name":"Kansai Electric Power Co., Inc.","official_url":"https://www.kepco.co.jp/english/"} — KEPCO --- THE KANSAI ELECTRIC POWER CO., INC. · confidence: medium
- Parties.6: {"relationship":"Historical equity owner; 10% interest reported in 2016","name":"Sumitomo Corporation","official_url":"https://www.sumitomocorp.com/en/global"} — Sumitomo Corporation · confidence: high
- Parties.8: {"relationship":"Historical equity owner; 11.6% interest reported in 2016","name":"Arctic Slope Regional Corporation","official_url":"https://www.asrc.com/"} — Arctic Slope Regional Corporation · confidence: high
- Parties.10: {"relationship":"Development participant","name":"CH2M Hill Companies","official_url":null} — West Deptford Combined Cycle Power Plant, US · confidence: medium
- Parties.12: {"relationship":"Reported gas-project equipment supplier","name":"GE Power","official_url":null} — West Deptford Combined Cycle Power Plant, US · confidence: medium
- Parties.13: {"relationship":"Reported gas-project equipment supplier","name":"Siemens","official_url":"https://www.siemens-energy.com/"} — West Deptford Combined Cycle Power Plant, US · confidence: medium
- Construction scope: Natural-gas combined-cycle plant with a 2x1 configuration: two Siemens SGT6-5000F combustion-turbine generator units, two heat-recovery steam generators, one steam-turbine generator, complete balance of plant, commissioning/startup, and a 230-kV switchyard. The EPC scope was reported at 738 MW; regulatory design criteria describe nominal output up to 750 MW. The black-start installation added three Caterpillar diesel engine-driven generators rated at 4 MW each in sound-reducing enclosures, plus diesel-engine controls, facility-control modifications, site preparation, paving, fencing, and real-property improvements. Regulatory records also identify a 40-MMBtu/hr auxiliary boiler, one 1,000-kW emergency generator, a diesel fire pump, diesel storage tanks, and cooling towers. — CH2M HILL Awarded EPC Contract For 738 MW New Jersey Power Plant · confidence: high
- Construction scope: Natural-gas combined-cycle plant with a 2x1 configuration: two Siemens SGT6-5000F combustion-turbine generator units, two heat-recovery steam generators, one steam-turbine generator, complete balance of plant, commissioning/startup, and a 230-kV switchyard. The EPC scope was reported at 738 MW; regulatory design criteria describe nominal output up to 750 MW. The black-start installation added three Caterpillar diesel engine-driven generators rated at 4 MW each in sound-reducing enclosures, plus diesel-engine controls, facility-control modifications, site preparation, paving, fencing, and real-property improvements. Regulatory records also identify a 40-MMBtu/hr auxiliary boiler, one 1,000-kW emergency generator, a diesel fire pump, diesel storage tanks, and cooling towers. — Source · confidence: high
- Construction scope: Natural-gas combined-cycle plant with a 2x1 configuration: two Siemens SGT6-5000F combustion-turbine generator units, two heat-recovery steam generators, one steam-turbine generator, complete balance of plant, commissioning/startup, and a 230-kV switchyard. The EPC scope was reported at 738 MW; regulatory design criteria describe nominal output up to 750 MW. The black-start installation added three Caterpillar diesel engine-driven generators rated at 4 MW each in sound-reducing enclosures, plus diesel-engine controls, facility-control modifications, site preparation, paving, fencing, and real-property improvements. Regulatory records also identify a 40-MMBtu/hr auxiliary boiler, one 1,000-kW emergency generator, a diesel fire pump, diesel storage tanks, and cooling towers. — West Deptford Energy Station Black Start System - Conti Civil · confidence: high
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html — SGT6-5000F Heavy-duty gas turbine (60 Hz) · confidence: high
- Containers: 3 — West Deptford Energy Station Black Start System - Conti Civil · confidence: medium
- Equipment models: [{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html","count":2,"unit_mw":null,"name":"Siemens SGT6-5000F combustion-turbine generator"},{"manufacturer_domain":"alstom.com","product_url":"https://www.alstom.com/sites/alstom.com/files/2018/07/08/Global/Group/Resources/Documents/Investors%20document/Annual%20Results%20Group%20Activity%202009.pdf","count":1,"unit_mw":null,"name":"Alstom STF-30C steam turbine"},{"manufacturer_domain":"cat.com","product_url":"https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets.html","count":3,"unit_mw":4,"name":"Caterpillar diesel engine-driven black-start generator, model not disclosed"},{"manufacturer_domain":"energy.johncockerill.com","product_url":"https://energy.johncockerill.com/en/boilers-and-heat-recovery-steam-generators/","count":2,"unit_mw":null,"name":"John Cockerill heat-recovery steam generator/steam boiler, model not disclosed"}] — West Deptford Energy Holdings LLC Senior Secured · confidence: medium
- Equipment models: [{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html","count":2,"unit_mw":null,"name":"Siemens SGT6-5000F combustion-turbine generator"},{"manufacturer_domain":"alstom.com","product_url":"https://www.alstom.com/sites/alstom.com/files/2018/07/08/Global/Group/Resources/Documents/Investors%20document/Annual%20Results%20Group%20Activity%202009.pdf","count":1,"unit_mw":null,"name":"Alstom STF-30C steam turbine"},{"manufacturer_domain":"cat.com","product_url":"https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets.html","count":3,"unit_mw":4,"name":"Caterpillar diesel engine-driven black-start generator, model not disclosed"},{"manufacturer_domain":"energy.johncockerill.com","product_url":"https://energy.johncockerill.com/en/boilers-and-heat-recovery-steam-generators/","count":2,"unit_mw":null,"name":"John Cockerill heat-recovery steam generator/steam boiler, model not disclosed"}] — West Deptford Energy Station Black Start System - Conti Civil · confidence: medium
- Equipment models.1: {"manufacturer_domain":"alstom.com","product_url":"https://www.alstom.com/sites/alstom.com/files/2018/07/08/Global/Group/Resources/Documents/Investors%20document/Annual%20Results%20Group%20Activity%202009.pdf","count":1,"unit_mw":null,"name":"Alstom STF-30C steam turbine"} — West Deptford Energy Holdings LLC Senior Secured · confidence: medium
- Equipment models.2: {"manufacturer_domain":"cat.com","product_url":"https://www.cat.com/en_US/products/new/power-systems/electric-power/diesel-generator-sets.html","count":3,"unit_mw":4,"name":"Caterpillar diesel engine-driven black-start generator, model not disclosed"} — West Deptford Energy Station Black Start System - Conti Civil · confidence: medium
- Equipment models.3: {"manufacturer_domain":"energy.johncockerill.com","product_url":"https://energy.johncockerill.com/en/boilers-and-heat-recovery-steam-generators/","count":2,"unit_mw":null,"name":"John Cockerill heat-recovery steam generator/steam boiler, model not disclosed"} — Heat Recovery Steam Generators & Boilers · confidence: medium
- Description: West Deptford Energy Station is a roughly 751-MW natural-gas-fired combined-cycle facility in Gloucester County, New Jersey, with EIA generator records E101, E102, and STG1 and the PJM node ACE-W-DEPTFORD-1-CC. EIA records show first operation in October 2014, while project sources identify commercial operation in November 2014 and service to northeastern PJM. LS Power developed and operated the project; an LS Power affiliate sold equity interests in September 2016 to Marubeni, Sumitomo, and other partners. In early 2025, LS Power acquired a combined 67.7% Class A interest from five previous shareholders, simplifying ownership to LS Power at 85.5% and Ullico at 14.5%. — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Quality notes: ["Reported capacity varies by measurement basis: LS Power reported 738 MW nominal at the 2011 financing stage, the 2016 ownership announcement reported 751 MW, and the EIA generator records list 225.3 MW for E101, 225.3 MW for E102, and 304 MW for STG1, totaling 754.6 MW of nameplate capacity.","The 2016 sources identify a 10% interest acquired by Sumitomo, while Perennial Power separately describes a 10% 2016 acquisition; these may represent the same investment and should not be counted as two separate 10% interests without additional documentation.","The early-2025 ownership consolidation is dated only to early 2025 in the available rating source; the exact closing month and the identities of the five selling shareholders were not disclosed there. Sale consideration for the 2016 equity transaction was also not reported in the cited announcement."] — LS Power Completes Financing for West Deptford Energy Station - LS Power · confidence: medium
- Financing summary: West Deptford Energy Holdings completed construction financing on 2011-11-30, but the LS Power announcement did not disclose the financing amount or lender names. S&P described a 2019 refinancing comprising a proposed $445 million senior secured Term Loan B due 2026 and a $55 million senior secured revolving facility due 2024; proceeds were intended to refinance an existing $347 million term loan, fund a $90 million sponsor distribution, and pay transaction expenses. In 2025, S&P described a proposed $255 million Term Loan B due 2032 and a $50 million revolving facility due 2030, supported by a $191 million sponsor cash contribution to repay approximately $441 million of existing debt, plus $6 million of transaction fees and a $10 million maintenance reserve. The September 2016 equity sale transferred interests from an LS Power affiliate to Marubeni and Sumitomo, but the cited announcement disclosed no sale consideration; that transaction value is therefore distinct from the project financings. — LS Power Completes Financing for West Deptford Energy Station - LS Power · confidence: medium
- Financing summary: West Deptford Energy Holdings completed construction financing on 2011-11-30, but the LS Power announcement did not disclose the financing amount or lender names. S&P described a 2019 refinancing comprising a proposed $445 million senior secured Term Loan B due 2026 and a $55 million senior secured revolving facility due 2024; proceeds were intended to refinance an existing $347 million term loan, fund a $90 million sponsor distribution, and pay transaction expenses. In 2025, S&P described a proposed $255 million Term Loan B due 2032 and a $50 million revolving facility due 2030, supported by a $191 million sponsor cash contribution to repay approximately $441 million of existing debt, plus $6 million of transaction fees and a $10 million maintenance reserve. The September 2016 equity sale transferred interests from an LS Power affiliate to Marubeni and Sumitomo, but the cited announcement disclosed no sale consideration; that transaction value is therefore distinct from the project financings. — West Deptford Energy Holdings LLC's $445 Million | S&P Global Ratings · confidence: medium
- Financing summary: West Deptford Energy Holdings completed construction financing on 2011-11-30, but the LS Power announcement did not disclose the financing amount or lender names. S&P described a 2019 refinancing comprising a proposed $445 million senior secured Term Loan B due 2026 and a $55 million senior secured revolving facility due 2024; proceeds were intended to refinance an existing $347 million term loan, fund a $90 million sponsor distribution, and pay transaction expenses. In 2025, S&P described a proposed $255 million Term Loan B due 2032 and a $50 million revolving facility due 2030, supported by a $191 million sponsor cash contribution to repay approximately $441 million of existing debt, plus $6 million of transaction fees and a $10 million maintenance reserve. The September 2016 equity sale transferred interests from an LS Power affiliate to Marubeni and Sumitomo, but the cited announcement disclosed no sale consideration; that transaction value is therefore distinct from the project financings. — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Financing summary: West Deptford Energy Holdings completed construction financing on 2011-11-30, but the LS Power announcement did not disclose the financing amount or lender names. S&P described a 2019 refinancing comprising a proposed $445 million senior secured Term Loan B due 2026 and a $55 million senior secured revolving facility due 2024; proceeds were intended to refinance an existing $347 million term loan, fund a $90 million sponsor distribution, and pay transaction expenses. In 2025, S&P described a proposed $255 million Term Loan B due 2032 and a $50 million revolving facility due 2030, supported by a $191 million sponsor cash contribution to repay approximately $441 million of existing debt, plus $6 million of transaction fees and a $10 million maintenance reserve. The September 2016 equity sale transferred interests from an LS Power affiliate to Marubeni and Sumitomo, but the cited announcement disclosed no sale consideration; that transaction value is therefore distinct from the project financings. — Participation in a 751MW gas-fired power plant in New... · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — Source · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — Energy Station - Marathon Consultants · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — LS Power Completes Financing for West Deptford Energy Station - LS Power · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — West Deptford plant finally gathers steam · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — West Deptford Energy Holdings LLC's $445 Million | S&P Global Ratings · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — West Deptford Energy Holdings LLC's New Senior Se · confidence: medium
- Timeline: [{"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."},{"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."},{"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."},{"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."},{"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."},{"event":"Construction completion and black-start integration","date":"2014","detail":"The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility."},{"event":"Initial operation","date":"2014-10","detail":"EIA-derived plant records identify October 2014 as the initial or first-operation date for the station and its E101, E102, and STG1 generators."},{"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."},{"event":"Black-start system recognition","date":"2015","detail":"The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage."},{"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."},{"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."},{"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."},{"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."},{"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."},{"event":"Operating status","date":"2026","detail":"EIA-derived records list the station as operating, with generation data on file through May 2026. — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Timeline.0: {"event":"PJM interconnection request","date":"2006-07","detail":"West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output."} — Source · confidence: high
- Timeline.1: {"event":"Site-plan and development approvals","date":"2008-09","detail":"The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals."} — Energy Station - Marathon Consultants · confidence: medium
- Timeline.2: {"event":"Pre-construction development","date":"2011-03-24","detail":"A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date."} — Source · confidence: high
- Timeline.3: {"event":"Construction financing completed","date":"2011-11-30","detail":"West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014."} — LS Power Completes Financing for West Deptford Energy Station - LS Power · confidence: high
- Timeline.4: {"event":"Construction start","date":"2012-02","detail":"Contemporary reporting stated that LS Power officials were scheduled to break ground in February 2012, marking the start of construction."} — West Deptford plant finally gathers steam · confidence: medium
- Timeline.7: {"event":"Commercial operation","date":"2014-11","detail":"Project and owner sources identify November 2014 as the commercial-operation date; the station began supplying electricity to northeastern PJM."} — Participation in a 751MW gas-fired power plant in New Jersey | Sumitomo Corporation · confidence: high
- Timeline.9: {"event":"2016 equity sale to new partners","date":"2016-09-14","detail":"Sumitomo and Marubeni announced acquisitions of 10% and 35% interests, respectively, in West Deptford Energy Holdings from an LS Power affiliate. Perennial Power separately reports acquiring a 10% interest in 2016. LS Power affiliates remained owners and operators."} — Participation in a 751MW gas-fired power plant in New... · confidence: high
- Timeline.10: {"event":"2019 refinancing","date":"2019-07","detail":"S&P reported a proposed $445 million senior secured Term Loan B due 2026 and $55 million senior secured revolving facility due 2024, intended primarily to refinance existing debt and distribute funds to sponsors."} — West Deptford Energy Holdings LLC's $445 Million | S&P Global Ratings · confidence: medium
- Timeline.11: {"event":"2019 debt issuance reported","date":"2019-09-04","detail":"S&P reported that West Deptford raised $445 million in senior secured term debt to fund a sponsor distribution, refinance the prior term loan, and cover transaction expenses."} — West Deptford Energy Holdings LLC's New Senior Se · confidence: medium
- Timeline.12: {"event":"Ownership consolidation by LS Power","date":"2025","detail":"In early 2025, LS Power acquired a combined 67.7% Class A membership interest from five previous shareholders, resulting in reported ownership of LS Power Group at 85.5% and Ullico Group at 14.5%. The exact closing month was not disclosed."} — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Timeline.13: {"event":"Proposed 2025 refinancing","date":"2025-07-15","detail":"S&P described a proposed $255 million Term Loan B and $50 million senior secured revolver, with $191 million of sponsor cash intended to repay approximately $441 million of existing debt."} — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Commercial parties.1: {"relationship":"Current majority owner and operator through an affiliate","name":"LS Power Group","detail":"S&P reported LS Power Group ownership of 85.5% after the early-2025 ownership consolidation. LS Power affiliates continued as project owners and operator after the 2016 equity sale.","official_url":"https://www.lspower.com/"} — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: medium
- Commercial parties.2: {"relationship":"Current minority owner","name":"Ullico Group","detail":"S&P reported Ullico Group ownership of 14.5% after the early-2025 ownership consolidation.","official_url":"https://www.ullico.org/"} — West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings · confidence: high
- Commercial parties.6: {"relationship":"Historical equity owner","name":"Kansai Electric Power Co., Inc.","detail":"Historical ownership reporting identified Kansai Electric Power with a 17.5% interest before the 2025 LS Power consolidation.","official_url":"https://www.kepco.co.jp/english/"} — Source · confidence: medium
- Commercial parties.7: {"relationship":"Historical equity investor","name":"Perennial Power","detail":"Perennial Power's project page states that it acquired a 10% interest in West Deptford in 2016 from an LS Power affiliate; this may correspond to the Sumitomo-reported 10% interest.","official_url":"https://pph-americas.com/"} — West Deptford Power Station - Perennial Power · confidence: medium
- Commercial parties.8: {"relationship":"Historical equity owner","name":"Arctic Slope Regional Corporation","detail":"The 2016 ownership schedule identified Arctic Slope Regional Corporation with an 11.6% interest.","official_url":"https://www.asrc.com/"} — Participation in a 751MW gas-fired power plant in New Jersey | Sumitomo Corporation · confidence: medium
- Commercial parties.9: {"relationship":"Historical equity and financing participant","name":"Prudential Capital Group","detail":"The 2016 ownership schedule identified Prudential Capital Group with an 11.1% interest and described it as part of the historical sponsor group.","official_url":null} — Participation in a 751MW gas-fired power plant in New Jersey | Sumitomo Corporation · confidence: medium
- Commercial parties.12: {"relationship":"Reported generation-equipment supplier","name":"GE Power","detail":"Project reporting identifies GE Power as a supplier of gas-project generation equipment.","official_url":null} — Power plant profile: West Deptford Combined Cycle Power Plant, US · confidence: medium

## Timeline

- 2006-07 — PJM interconnection request
  West Deptford Energy submitted its PJM generator interconnection request and received queue position Q90; PJM determined that no new network upgrades beyond direct interconnection facilities were required for the planned output.
  Source: Source (https://www.nj.gov/bpu/pdf/energy/West%20Deptford%20Energy.pdf)
- 2008-09 — Site-plan and development approvals
  The project received West Deptford Township preliminary and final site-plan approvals in September 2008, with engineering and environmental work supporting land-development and permit approvals.
  Source: Energy Station - Marathon Consultants (https://www.marathonconsultants.com/portfolio-item/west-deptford-energy-station/)
- 2011-03-24 — Pre-construction development
  A New Jersey Board of Public Utilities filing described a 650-MW nominal natural-gas combined-cycle facility with real-estate rights and major permits secured, targeting a 2014 in-service date.
  Source: Source (https://www.nj.gov/bpu/pdf/energy/West%20Deptford%20Energy.pdf)
- 2011-11-30 — Construction financing completed
  West Deptford Energy Holdings announced completion of financing for construction of the facility; construction was scheduled to begin in early 2012, with commercial operations targeted for 2014.
  Source: LS Power Completes Financing for West Deptford Energy Station - LS Power (https://www.lspower.com/news/ls-power-completes-financing-west-deptford-energy-station/)
- 2014 — Construction completion and black-start integration
  The principal plant reached construction completion in mid-2014 at approximately 738 MW, and the integrated black-start system was completed as a separate upgrade to the gas-fired combined-cycle facility.
  Source: West Deptford Energy Station Black Start System - Conti Civil (https://www.conticivil.com/projects/west-deptford-energy-station-black-start-system/)
- 2015 — Black-start system recognition
  The black-start system was named an Engineering News-Record Best Project of 2015 and was designed to allow the station to help start other connected power plants during a grid outage.
  Source: West Deptford Energy Station Black Start System - Conti Civil (https://www.conticivil.com/projects/west-deptford-energy-station-black-start-system/)

## Sources

- [West Deptford Energy Holdings LLC Senior Secured | S&P Global Ratings](https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/3405818) — spglobal.com · tier other
- [LS Power: Home](https://www.lspower.com/) — lspower.com · tier other
- [EIA - MBR Portal - Federal Energy Regulatory Commission](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=385) — mbrweb.ferc.gov · tier regulatory
- [Source](https://www.nj.gov/bpu/pdf/energy/West%20Deptford%20Energy.pdf) — nj.gov · tier regulatory
- [Federal Register :: West Deptford Energy, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date](https://www.federalregister.gov/documents/2025/02/26/2025-03112/west-deptford-energy-llc-notice-of-institution-of-section-206-proceeding-and-refund-effective-date) — federalregister.gov · tier regulatory
- [Participation in a 751MW gas-fired power plant in New Jersey | Sumitomo Corporation in North, Central and South America](https://www.sumitomocorp.com/en/us/news/release/2016/group/20160914) — sumitomocorp.com · tier other
- [Power plant profile: West Deptford Combined Cycle Power Plant, US](https://www.power-technology.com/data-insights/power-plant-profile-west-deptford-combined-cycle-power-plant-us/) — power-technology.com · tier other
- [West Deptford Energy Holdings LLC 'CCC' Senior Se](https://www.spglobal.com/ratings/pt/regulatory/article/-/view/type/HTML/id/3245698) — spglobal.com · tier other
- [KEPCO --- THE KANSAI ELECTRIC POWER CO., INC.](https://www.kepco.co.jp/english/) — kepco.co.jp · tier other
- [Sumitomo Corporation](https://www.sumitomocorp.com/en/global) — sumitomocorp.com · tier other
- [West Deptford Power Station - Perennial Power](https://pph-americas.com/projects/west-deptford-power-station/) — pph-americas.com · tier other
- [Arctic Slope Regional Corporation](https://www.asrc.com/) — asrc.com · tier other
- [Energy Station - Marathon Consultants](https://marathonconsultants.com/portfolio-item/west-deptford-energy-station/) — marathonconsultants.com · tier other
- [West Deptford plant finally gathers steam](https://www.nj.com/gloucester-county/2012/02/west_deptford_plant_finally_ga.html) — nj.com · tier other
- [CH2M HILL Awarded EPC Contract For 738 MW New Jersey Power Plant](https://www.plantautomation.com/doc/ch2m-hill-awarded-epc-contract-for-738-mw-new-0001) — plantautomation.com · tier other
- [Source](https://www.nj.gov/drbc/library/documents/dockets/120920/2008-027CP-4.pdf) — nj.gov · tier regulatory
- [West Deptford Energy Station Black Start System - Conti Civil](https://www.conticivil.com/projects/west-deptford-energy-station-black-start-system/) — conticivil.com · tier other
- [SGT6-5000F Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html) — siemens-energy.com · tier other
- [West Deptford Energy Holdings LLC Senior Secured](https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/3420184) — spglobal.com · tier other
- [Heat Recovery Steam Generators & Boilers](https://energy.johncockerill.com/en/boilers-and-heat-recovery-steam-generators/) — energy.johncockerill.com · tier other
- [Participation in a 751MW gas-fired power plant in New Jersey | Sumitomo Corporation](https://www.sumitomocorp.com/en/jp/news/release/2016/group/20160914) — sumitomocorp.com · tier other
- [LS Power Completes Financing for West Deptford Energy Station - LS Power](https://www.lspower.com/news/ls-power-completes-financing-west-deptford-energy-station/) — lspower.com · tier other
- [West Deptford Energy Holdings LLC's $445 Million | S&P Global Ratings](https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/2264467) — spglobal.com · tier other
- [Energy Station - Marathon Consultants](https://www.marathonconsultants.com/portfolio-item/west-deptford-energy-station/) — marathonconsultants.com · tier other
- [West Deptford Energy Holdings LLC's New Senior Se](https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/2293379) — spglobal.com · tier other
- [Power plant profile: West Deptford Combined Cycle Power Plant, US](https://power-technology.com/data-insights/power-plant-profile-west-deptford-combined-cycle-power-plant-us) — power-technology.com · tier other
- [Source](https://spglobal.com/ratings/pt/regulatory/article/-/view/type/HTML/id/3245698) — spglobal.com · tier other
- [Source](https://www.pjm.com/-/media/DotCom/documents/manuals/m03.pdf) — pjm.com · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/energy/day-ahead/valid-bidding-locations-for-virtual-bids.xls) — pjm.com · tier other
- [Source](https://www.energy.gov/documents/pjm-202c-application-exhibit-updated-feb-1-2026-1245-pm-est) — energy.gov · tier regulatory
- [New Jersey's 10 Largest Power Plants](https://tristateinfrastructurenews.com/new-jerseys-10-largest-power-plants/) — tristateinfrastructurenews.com · tier other

## Data quality

- Reported capacity varies by measurement basis: LS Power reported 738 MW nominal at the 2011 financing stage, the 2016 ownership announcement reported 751 MW, and the EIA generator records list 225.3 MW for E101, 225.3 MW for E102, and 304 MW for STG1, totaling 754.6 MW of nameplate capacity. The early-2025 ownership consolidation is dated only to early 2025 in the available rating source; the exact closing month and the identities of the five selling shareholders were not disclosed there.

---