# Wood County

MISO asset profile · https://askthegrid.com/assets/facilities/wood-county

## Current generation inventory

EIA plant 65011 · Inventory reporting month: 2026-08.

- batteries: 75 MW operating nameplate
- solar: 150 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -89.8335, 44.27361
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2025-07-30 09:22:04+00:00
- Map prepared: 2026-10-10T02:28:23.328278+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Wood County is a solar-plus-storage site in the town of Saratoga in central Wisconsin, operated by Alliant Energy. Its 150 MW solar array, built by Burns & McDonnell on about 1,200 acres with nearly 390,000 panels, was completed in September 2022. A 75 MW, 300 MWh battery, four hours long, was added beside the solar field and went online in late 2025, bringing the site to 225 MW of combined capacity.

## Reviewed metrics

- **Nameplate capacity:** 225 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 65011 — plant-65011

## Facts

- **Technology:** Batteries, Solar Photovoltaic
- **Operator:** Alliant Energy

## Related parties

- **Owner / operator:** Alliant Energy — owner ([source](https://www.alliantenergy.com))
- **EPC contractor:** Burns & McDonnell — epc

## Sources

- [alliantenergy.com](https://www.alliantenergy.com/news/news-center/2022/09/092822-woodcosolar) — alliantenergy.com · public_source — Source retained for exact-record publication review.
- [alliantenergy.com](https://www.alliantenergy.com/our-energy/energy-storage/wood-county) — alliantenergy.com · public_source — Source retained for exact-record publication review.
- [tdworld.com](https://www.tdworld.com/distributed-energy-resources/article/21252917/alliant-energy-completes-150-mw-solar-power-array) — tdworld.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/wood-county
Website: [Alliant Energy](https://www.alliantenergy.com)

Source: Ask the Grid — https://askthegrid.com/
