Anemoi Energy Storage is a battery energy storage facility with 200 MW of EIA-reported operating capacity and 400 MWh of reported energy capacity in Hidalgo County, Texas, registered as EIA Plant ID 67236. Anemoi Energy Storage, LLC is the registered plant entity or operator. Public project records list 176 battery units, and 59 PCS units. The facility interconnects at Pomelo Substation. Its grid role is grid-scale battery energy storage.

## Key facts

- Technology: Batteries
- Power capacity: 200 MW
- Energy capacity: 400 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Substation: Pomelo Substation
- Point of interconnection: Pomelo Substation
- Transmission owner: American Electric Power (AEP)
- Market resources: ANEM_ESS_ESR1

## Settlement price economics

Observed ERCOT settlement prices at ANEM_ESS_RN, 2025-07-26 to 2026-07-25 (364 days, 8,732 settled hours).

- Average price: $25.51/MWh
- Hourly range: -$39 to $705/MWh
- Negative price hours: 938
- TB2 spread benchmark: $39.7/kW-yr
- Average daily top/bottom spread: $54.59/MWh

The TB2 figure is a price benchmark, not revenue. It values one perfect-foresight cycle per day, gross of round-trip losses, and excludes ancillary services. It is not this asset's realized capture and assumes no dispatch.

## Source-backed facts

- Owner logo domain: anemoienergystorage.com — Anemoi Energy Storage · confidence: medium
- Description: Anemoi Energy Storage is a 200 MW battery energy storage project located in Hidalgo County (near Edinburg), Texas (EIA Plant ID 67236). Industry coverage and the project website identify the site as a 200-MW (reported 400-MWh) battery installation; the project is associated with developer/operator Plus Power in press coverage and is run as a special-purpose entity (Anemoi Energy Storage, LLC). Reported financing participants include NADBank and a First Citizens Bank-led financing group. — Companies Announce Major Energy Storage Projects in... · confidence: medium
- Description: Anemoi Energy Storage is a 200 MW battery energy storage project located in Hidalgo County (near Edinburg), Texas (EIA Plant ID 67236). Industry coverage and the project website identify the site as a 200-MW (reported 400-MWh) battery installation; the project is associated with developer/operator Plus Power in press coverage and is run as a special-purpose entity (Anemoi Energy Storage, LLC). Reported financing participants include NADBank and a First Citizens Bank-led financing group. — NADBank Joins First Citizens Bank-led Financing for an Energy... · confidence: medium
- Identifiers: [{"value":"67236","system":"EIA Plant ID"},{"value":"ERCOT","system":"ISO/RTO"},{"value":"ANEM_ESS_ESR1","system":"ERCOT market resource name"}] — Combo & Single Model ESR Names · confidence: medium
- Parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","official_url":null},{"relationship":"financier / lender","name":"NADBank","official_url":null},{"relationship":"financier / lender","name":"First Citizens Bank (lead)","official_url":null}] — Companies Announce Major Energy Storage Projects in... · confidence: medium
- Parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","official_url":null},{"relationship":"financier / lender","name":"NADBank","official_url":null},{"relationship":"financier / lender","name":"First Citizens Bank (lead)","official_url":null}] — NADBank Joins First Citizens Bank-led Financing for an Energy... · confidence: medium
- Identifiers.1: {"value":"ERCOT","system":"ISO/RTO"} — Combo & Single Model ESR Names · confidence: medium
- Parties.0: {"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","official_url":"https://www.anemoienergystorage.com/"} — Anemoi Energy Storage · confidence: medium
- Parties.1: {"relationship":"developer / project operator (industry coverage)","name":"Plus Power","official_url":null} — Companies Announce Major Energy Storage Projects in... · confidence: medium
- Parties.1: {"relationship":"developer / project operator (industry coverage)","name":"Plus Power","official_url":null} — Anemoi Energy Storage · confidence: medium
- Parties.2: {"relationship":"financier / lender","name":"NADBank","official_url":null} — NADBank Joins First Citizens Bank-led Financing for an Energy... · confidence: medium
- Parties.3: {"relationship":"financier / lender","name":"First Citizens Bank (lead)","official_url":null} — NADBank Joins First Citizens Bank-led Financing for an Energy... · confidence: medium
- Site acres: 13 — Source · confidence: medium
- Construction scope: 200 MW / 400 MWh AC battery energy storage system (two-hour duration) located on roughly 13 acres near Edinburg, Hidalgo County, Texas. Project configuration (sponsor / financier documentation) lists 176 manufacturer-integrated liquid‑cooling battery units (each 2,752 kWh) and 59 power conversion systems; includes a 216 MVA transformer and a ~1,100 ft gen‑tie to the Pomelo 345 kV substation. Began commercial operations in summer 2024; EPC work for the project was completed by Gridworks for Plus Power. — Overview — Anemoi Energy Storage · confidence: medium
- Construction scope: 200 MW / 400 MWh AC battery energy storage system (two-hour duration) located on roughly 13 acres near Edinburg, Hidalgo County, Texas. Project configuration (sponsor / financier documentation) lists 176 manufacturer-integrated liquid‑cooling battery units (each 2,752 kWh) and 59 power conversion systems; includes a 216 MVA transformer and a ~1,100 ft gen‑tie to the Pomelo 345 kV substation. Began commercial operations in summer 2024; EPC work for the project was completed by Gridworks for Plus Power. — Source · confidence: medium
- Construction scope: 200 MW / 400 MWh AC battery energy storage system (two-hour duration) located on roughly 13 acres near Edinburg, Hidalgo County, Texas. Project configuration (sponsor / financier documentation) lists 176 manufacturer-integrated liquid‑cooling battery units (each 2,752 kWh) and 59 power conversion systems; includes a 216 MVA transformer and a ~1,100 ft gen‑tie to the Pomelo 345 kV substation. Began commercial operations in summer 2024; EPC work for the project was completed by Gridworks for Plus Power. — Gridworks Completes Three Standalone Battery Energy Storage Projects for Plus Power and ERCOT | Gridworks · confidence: medium
- Description: Anemoi Energy Storage is a 200 MW (reported 400 MWh) battery energy storage system located near Edinburg in Hidalgo County, Texas. The site is owned and operated by the project company Anemoi Energy Storage, LLC and is associated in industry and project materials with developer/operator Plus Power. The project received construction and term financing and began commercial operations in 2024. In 2024 an external investor group closed a tax-credit-related investment in the project. — Anemoi Energy Storage · confidence: medium
- Description: Anemoi Energy Storage is a 200 MW (reported 400 MWh) battery energy storage system located near Edinburg in Hidalgo County, Texas. The site is owned and operated by the project company Anemoi Energy Storage, LLC and is associated in industry and project materials with developer/operator Plus Power. The project received construction and term financing and began commercial operations in 2024. In 2024 an external investor group closed a tax-credit-related investment in the project. — Projects · confidence: medium
- Quality notes: ["Project capacity (200 MW / 400 MWh) and commercial-operation timing are reported by the project website, developer pages, and industry press; EIA Plant ID 67236 is listed to this site in interconnection/project listings.","Financing coverage is from developer and lender press releases and a NADBank project brief; evidence shows developer/operator and multiple financing/investment events instead."] — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Quality notes: ["Project capacity (200 MW / 400 MWh) and commercial-operation timing are reported by the project website, developer pages, and industry press; EIA Plant ID 67236 is listed to this site in interconnection/project listings.","Financing coverage is from developer and lender press releases and a NADBank project brief; evidence shows developer/operator and multiple financing/investment events instead."] — DRAFT BD 2023-XX Anemoi Energy Storage Project... · confidence: medium
- Financing summary: Oct 2023: First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project (First Citizens-led group); NADBank joined that financing and had earlier proposed a market-rate loan of up to US$40 million (NADBank draft, Jul 6, 2023). Oct 2024: Foss & Company closed an investment exceeding $100 million in a tax-credit-related investment for the Anemoi project. — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Financing summary: Oct 2023: First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project (First Citizens-led group); NADBank joined that financing and had earlier proposed a market-rate loan of up to US$40 million (NADBank draft, Jul 6, 2023). Oct 2024: Foss & Company closed an investment exceeding $100 million in a tax-credit-related investment for the Anemoi project. — NADBank joins First Citizens Bank-led financing for an... · confidence: medium
- Financing summary: Oct 2023: First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project (First Citizens-led group); NADBank joined that financing and had earlier proposed a market-rate loan of up to US$40 million (NADBank draft, Jul 6, 2023). Oct 2024: Foss & Company closed an investment exceeding $100 million in a tax-credit-related investment for the Anemoi project. — DRAFT BD 2023-XX Anemoi Energy Storage Project... · confidence: medium
- Financing summary: Oct 2023: First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project (First Citizens-led group); NADBank joined that financing and had earlier proposed a market-rate loan of up to US$40 million (NADBank draft, Jul 6, 2023). Oct 2024: Foss & Company closed an investment exceeding $100 million in a tax-credit-related investment for the Anemoi project. — Foss & Company and Plus Power Close $100 Million... · confidence: medium
- Timeline: [{"event":"NADBank loan proposal (project financing)","date":"2023-07-06","detail":"NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million."},{"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."},{"event":"Commercial operation (project online)","date":"2024-06","detail":"Developer materials list the Anemoi project as operational since June 2024."},{"event":"Investor/tax-credit investment closed (Foss & Company)","date":"2024-10","detail":"Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction)."}] — DRAFT BD 2023-XX Anemoi Energy Storage Project... · confidence: medium
- Timeline: [{"event":"NADBank loan proposal (project financing)","date":"2023-07-06","detail":"NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million."},{"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."},{"event":"Commercial operation (project online)","date":"2024-06","detail":"Developer materials list the Anemoi project as operational since June 2024."},{"event":"Investor/tax-credit investment closed (Foss & Company)","date":"2024-10","detail":"Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction)."}] — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Timeline: [{"event":"NADBank loan proposal (project financing)","date":"2023-07-06","detail":"NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million."},{"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."},{"event":"Commercial operation (project online)","date":"2024-06","detail":"Developer materials list the Anemoi project as operational since June 2024."},{"event":"Investor/tax-credit investment closed (Foss & Company)","date":"2024-10","detail":"Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction)."}] — Projects · confidence: medium
- Timeline: [{"event":"NADBank loan proposal (project financing)","date":"2023-07-06","detail":"NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million."},{"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."},{"event":"Commercial operation (project online)","date":"2024-06","detail":"Developer materials list the Anemoi project as operational since June 2024."},{"event":"Investor/tax-credit investment closed (Foss & Company)","date":"2024-10","detail":"Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction)."}] — Foss & Company and Plus Power Close $100 Million... · confidence: medium
- Commercial parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"},{"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"},{"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"},{"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null}] — Anemoi Energy Storage · confidence: medium
- Commercial parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"},{"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"},{"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"},{"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null}] — Projects · confidence: medium
- Commercial parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"},{"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"},{"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"},{"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null}] — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Commercial parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"},{"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"},{"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"},{"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null}] — NADBank joins First Citizens Bank-led financing for an... · confidence: medium
- Commercial parties: [{"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"},{"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"},{"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"},{"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"},{"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null}] — Foss & Company and Plus Power Close $100 Million... · confidence: medium
- Commercial parties.0: {"relationship":"owner / operator (reported)","name":"Anemoi Energy Storage, LLC","detail":"Project special-purpose company named on the project website and project listings; owns/operates the 200 MW / 400 MWh site near Edinburg, Texas (EIA Plant ID 67236).","official_url":"https://www.anemoienergystorage.com/"} — Anemoi Energy Storage · confidence: medium
- Commercial parties.1: {"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"} — Projects · confidence: medium
- Commercial parties.1: {"relationship":"developer / project operator (industry coverage)","name":"Plus Power","detail":"Developer and operator credited in developer pages and industry coverage; lists Anemoi as operational since June 2024.","official_url":"https://www.pluspower.com/"} — Plus Power completes US$1.8 billion financing for battery... · confidence: medium
- Commercial parties.2: {"relationship":"financier / lead (bank arranger)","name":"First Citizens Bank","detail":"Coordinated $200 million in construction and term financing for the Anemoi project (announced Oct 2023).","official_url":"https://www.firstcitizens.com/"} — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Commercial parties.3: {"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"} — NADBank joins First Citizens Bank-led financing for an... · confidence: medium
- Commercial parties.3: {"relationship":"financier / lender","name":"NADBank","detail":"Public NADBank materials show it joined the First Citizens-led financing in Oct 2023 and a NADBank project brief (Jul 2023) proposed a loan of up to US$40 million.","official_url":"https://www.nadbank.org/"} — DRAFT BD 2023-XX Anemoi Energy Storage Project... · confidence: medium
- Commercial parties.4: {"relationship":"investor / tax-credit investor","name":"Foss & Company","detail":"Announced the close of an investment exceeding $100 million for the Anemoi project in Oct 2024 as a tax-credit / investment transaction with Plus Power.","official_url":null} — Foss & Company and Plus Power Close $100 Million... · confidence: medium
- Timeline.0: {"event":"NADBank loan proposal (project financing)","date":"2023-07-06","detail":"NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million."} — DRAFT BD 2023-XX Anemoi Energy Storage Project... · confidence: medium
- Timeline.1: {"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."} — First Citizens Bank Coordinates $672 Million in Financings for... · confidence: medium
- Timeline.1: {"event":"Construction and term financing (First Citizens-led)","date":"2023-10","detail":"First Citizens Bank coordinated $200 million in construction and term financing for the 200 MW / 400 MWh Anemoi project; NADBank announced it joined the First Citizens-led financing."} — NADBank joins First Citizens Bank-led financing for an... · confidence: medium
- Timeline.2: {"event":"Commercial operation (project online)","date":"2024-06","detail":"Developer materials list the Anemoi project as operational since June 2024."} — Projects · confidence: medium
- Timeline.3: {"event":"Investor/tax-credit investment closed (Foss & Company)","date":"2024-10","detail":"Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction)."} — Foss & Company and Plus Power Close $100 Million... · confidence: medium

## Timeline

- 2023-07-06 — NADBank loan proposal (project financing)
  NADBank draft project brief shows a proposed market-rate loan for the Anemoi Energy Storage project of up to US$40.0 million.
  Source: DRAFT BD 2023-XX Anemoi Energy Storage Project... (https://nadbank.org/hubfs/projects/anemoi_energy_storage_project_proposal_eng_published.pdf?hsLang=en)
- 2024-10 — Investor/tax-credit investment closed (Foss & Company)
  Foss & Company and Plus Power announced the close of an investment exceeding $100 million for the Anemoi Energy Storage project (tax-credit / investment transaction).
  Source: Foss & Company and Plus Power Close $100 Million... (https://www.prnewswire.com/news-releases/foss--company-and-plus-power-close-100-million-investment-tax-credit-deal-for-battery-energy-storage-system-302279847.html)

## Sources

- [Anemoi Energy Storage](https://www.anemoienergystorage.com/) — anemoienergystorage.com · tier other
- [Companies Announce Major Energy Storage Projects in ...](https://www.powermag.com/companies-announce-major-energy-storage-projects-in-texas/) — powermag.com · tier other
- [NADBank Joins First Citizens Bank-led Financing for an Energy ...](https://www.nacleanenergy.com/energy-storage/nadbank-joins-first-citizens-bank-led-financing-for-an-energy-storage-project-in-hidalgo-county-texas) — nacleanenergy.com · tier other
- [Combo & Single Model ESR Names](https://www.ercot.com/files/docs/2025/02/14/Single-Model-ESR-Names_01Oct2025-as-of-10-3-25-1545.xlsx) — ercot.com · tier regulatory
- [Source](https://anemoienergystorage.com/) — anemoienergystorage.com · tier other
- [Source](https://ercot.com/files/docs/2025/02/14/Single-Model-ESR-Names_01Oct2025-as-of-10-3-25-1545.xlsx) — ercot.com · tier regulatory
- [Source](https://powermag.com/companies-announce-major-energy-storage-projects-in-texas) — powermag.com · tier other
- [Overview — Anemoi Energy Storage](https://www.anemoienergystorage.com/overview) — anemoienergystorage.com · tier other
- [DRAFT BD 2023-XX Anemoi Energy Storage Project ...](https://nadbank.org/hubfs/projects/anemoi_energy_storage_project_proposal_eng_published.pdf?hsLang=en) — nadbank.org · tier other
- [Projects](https://www.pluspower.com/projects/) — pluspower.com · tier other
- [Gridworks Completes Three Standalone Battery Energy Storage Projects for Plus Power and ERCOT | Gridworks](https://www.gridworks.com/blog/completed-plus-power-ercot-battery-energy-storage-projects/) — gridworks.com · tier other
- [First Citizens Bank Coordinates $672 Million in Financings for ...](https://newsroom.firstcitizens.com/2023-10-17-First-Citizens-Bank-Coordinates-672-Million-in-Financings-for-Plus-Power-on-Three-Battery-Storage-Projects) — newsroom.firstcitizens.com · tier other
- [NADBank joins First Citizens Bank-led financing for an ...](https://nadbank.org/news/press-release/nadbank-joins-first-citizens-bank-led-financing-for-an-energy-storage-project-in-hidalgo-county-texas) — nadbank.org · tier other
- [Foss & Company and Plus Power Close $100 Million ...](https://www.prnewswire.com/news-releases/foss--company-and-plus-power-close-100-million-investment-tax-credit-deal-for-battery-energy-storage-system-302279847.html) — prnewswire.com · tier other
- [Plus Power completes US$1.8 billion financing for battery ...](https://www.energy-storage.news/plus-power-completes-us1-8-billion-financing-for-2-76gwh-of-arizona-and-texas-bess/) — energy-storage.news · tier other
- [Plus Power Secures $1.8 Billion for Standalone Storage ...](https://mercomcapital.com/plus-power-secures-for-standalone-storage-projects/) — mercomcapital.com · tier other
- [Foss & Company and Plus Power close $100 million ...](https://www.renewableenergymagazine.com/storage/foss-amp-company-and-plus-power-close-20241030) — renewableenergymagazine.com · tier other
- [Plus Power raises $1.8 billion to advance construction of ...](https://pv-magazine-usa.com/2023/10/17/plus-power-raises-1-8-billion-to-advance-construction-of-five-energy-storage-facilities/) — pv-magazine-usa.com · tier other
- [Combo & Single Model ESR Names](https://www.ercot.com/files/docs/2025/02/14/single-model-esr-names_16Jun2025.xlsx) — ercot.com · tier regulatory

## Data quality

- Project capacity (200 MW / 400 MWh) and commercial-operation timing are reported by the project website, developer pages, and industry press; EIA Plant ID 67236 is listed to this site in interconnection/project listings. Financing coverage is from developer and lender press releases and a NADBank project brief; some numbers (e.g., loan caps, aggregate financing programs) come from draft or project-proposal documents published by lenders. evidence shows developer/operator and multiple financing/investment events instead.

---