Bluestone Wind is a 111.8 MW onshore wind facility in Broome County, New York, operational since October 2023. The project is developed, owned, and operated by Bluestone Wind, LLC, an indirect wholly-owned subsidiary of Northland Power Inc., and operates under a 20-year power purchase agreement and indexed renewable energy certificate contracts with NYSERDA.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 111.8 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Transactions.ownership interest pct: 100 % — documents.dps.ny.gov · confidence: review_required
- Agreements.ppa duration: 20 years — northlandpower.com · confidence: review_required

## Timeline

- 2019-12-16 — Certificate of Environmental Compatibility and Public Need (CECPN) granted
  The New York State Board on Electric Generation Siting and the Environment (Siting Board) granted Bluestone Wind a Certificate of Environmental Compatibility and Public Need (CECPN), subject to conditions, authorizing construction and operation of the project.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B6623EDE1-3CDF-4B38-BF7F-16FBB9CD98B8%7D)
- 2020-07-17 — Upstream ownership transfer approved without further review
  The New York Public Service Commission issued a Declaratory Ruling finding that the proposed transfer of upstream ownership interests in Bluestone Wind from Calpine Corp. to Northland required no further review under Public Service Law Section 70.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B6623EDE1-3CDF-4B38-BF7F-16FBB9CD98B8%7D)
- 2020-07-27 — Northland acquisition of Bluestone and High Bridge from Calpine completed
  Northland Power completed its purchase of the Bluestone and High Bridge Wind projects from Calpine. This upstream ownership-interest acquisition transferred control of the Bluestone development company to Northland Power New York Wind LLC, an indirect subsidiary of Northland Power Inc.
  Source: northlandpower.com (https://northlandpower.com/wp-content/uploads/2025/11/Bluestone-CPCN-Order.pdf)
- 2020-12-18 — Certificate of Public Convenience and Necessity (CPCN) granted
  The New York Public Service Commission issued an order granting Bluestone Wind a Certificate of Public Convenience and Necessity (CPCN) and status under the Commission's lightened regulatory regime for merchant participation in NYISO competitive wholesale markets.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B6623EDE1-3CDF-4B38-BF7F-16FBB9CD98B8%7D)
- 2021-04-05 — Construction underway
  Construction was underway with The Wesson Group performing timber chipping, stacking, stump removal, and land stabilization. The contractor paused active site work to allow for snowmelt and recent rains to dry out, with planned resumption through the month.
  Source: tcsny.it (https://www.tcsny.it/Windsor_Files/Public%20Notices/041421-8.E.1%20Bluestone%20Pause.pdf)

## Sources

- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B302D9704-7122-4643-9A29-15650D121115%7D&DocTitle=Exhibit%203) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B6623EDE1-3CDF-4B38-BF7F-16FBB9CD98B8%7D) — documents.dps.ny.gov · tier authoritative
- [northlandpower.com](https://northlandpower.com/northland-power-secures-final-tax-equity-funding-on-u-s-based-bluestone-and-ball-hill-wind-farms/) — northlandpower.com · tier public_source
- [northlandpower.com](https://northlandpower.com/sites/bluestone/) — northlandpower.com · tier public_source
- [northlandpower.com](https://northlandpower.com/wp-content/uploads/2025/11/Bluestone-CPCN-Order.pdf) — northlandpower.com · tier public_source
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/ViewerDocLibrary/Filing/Filing1761/Attachments/Transmittal%20Letter%20NYSEG%20Bluestone%20E%26P.pdf) — nyisoviewer.etariff.biz · tier public_source
- [tcsny.it](https://www.tcsny.it/Windsor_Files/Public%20Notices/041421-8.E.1%20Bluestone%20Pause.pdf) — tcsny.it · tier public_source
- [thewessongrp.com](https://www.thewessongrp.com/projects/bluestone-wind-farm) — thewessongrp.com · tier public_source

## Data quality

- The project was initially designed and permitted at approximately 124 MW with a maximum proposed count of 33 turbines. The operating EIA record reports 111.8 MW with 24 turbines. These are different development-stage descriptions of the same exact Bluestone facility, reflecting design optimization and permitting refinements. Northland acquired Bluestone through a transaction with Calpine in July 2020. The reported approximately C$5.6 million value relates to a multi-project portfolio transaction and should not be treated as Bluestone-only sale consideration. The regulatory record documents a design reduction from 33 to 27 turbines during permitting; the operating record later reports 24 turbines. No separate post-operation expansion, retirement, or repowering event is documented. The sole ownership of Bluestone Wind, LLC by Northland Power was confirmed in regulatory filings and is supported by the transfer history. Northland retained 100% ownership and operational control following the Calpine acquisition and subsequent intra-corporate restructurings.

---