# Cassadaga Wind Farm

NYISO wind_power_plant · https://askthegrid.com/nyiso/assets/plant/cassadaga-wind-farm

Cassadaga Wind Farm is EIA plant 58777, a 125.5 MW onshore wind facility in the Towns of Charlotte, Cherry Creek, and Stockton in Chautauqua County, New York. The project comprises 37 turbines: 27 Nordex N117 units rated at 3.675 MW each and 10 Siemens Gamesa G114 units rated at 2.625 MW each. It interconnects with National Grid's 115 kV transmission system at the Moon Road substation area and operates in the NYISO market. Cassadaga was the first project completed under New York's Article 10 siting law. RWE Clean Energy owns and operates the facility, which entered commercial operation in August 2021.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 124 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Location.towns: Charlotte, Cherry Creek, and Stockton — americas.rwe.com · confidence: review_required
- Technical.site acres: 40000 acres — americas.rwe.com · confidence: review_required
- Technical.unit count: 37 turbines — americas.rwe.com · confidence: review_required
- Technical.power mw: 125.5 MW — documents.dps.ny.gov · confidence: review_required
- Technical.interconnection voltage kv: 115 kV — americas.rwe.com · confidence: review_required
- Operations.substation: Moon Road substation — americas.rwe.com · confidence: review_required
- Operations.balancing authority: NYISO — mbrweb.ferc.gov · confidence: review_required
- Operations.operating status: operating — rwe.com · confidence: review_required
- Operations.status date: 2021 — americas.rwe.com · confidence: review_required
- Technical.commercial operation date: August 2021 — documents.dps.ny.gov · confidence: review_required
- History.significance: First project completed under New York's Article 10 law — rwe.com · confidence: review_required
- History.financing investment usd: 200000000 USD — rwe.com · confidence: review_required
- History.estimated homes powered: 37000 homes — rwe.com · confidence: review_required

## Timeline

- 2009 — EverPower predecessor acquisition
  Trireme Energy Development, LLC acquired EverPower Wind Holdings, Inc., a renewable-energy company that developed, owned, and operated wind farms throughout the United States. Through Trireme Energy Holdings, Inc., Terra Firma Capital Partners Fund Three, LLP owns about 95% of Trireme; James Spencer, EverPower's founder and Trireme's CEO, owns 5%.
  Source: wsgr.com (https://www.wsgr.com/a/web/wmjxpckwwwuzuKvZGpbaza/memorandum-opinion-121423.pdf)
- 2017-12 — Development portfolio transferred to Innogy/IRUS
  Trireme sold EverPower's assets. The six wind farms already in operation were sold to BlackRock, Inc., while IRUS (U.S. subsidiary of Innogy) purchased EverPower's portfolio of projects in development, including Cassadaga Wind LLC.
  Source: wsgr.com (https://www.wsgr.com/a/web/wmjxpckwwwuzuKvZGpbaza/memorandum-opinion-121423.pdf)
- 2018-03-12 — E.ON/RWE restructuring agreement affecting Cassadaga
  RWE and E.ON entered into a multi-step transaction restructuring, under which E.ON would temporarily acquire an indirect majority interest in Innogy's U.S. renewable-energy development projects, including Cassadaga and Baron Winds. RWE retained the right to ultimately reacquire Innogy's renewable-energy business.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B595C670B-E21A-4244-A248-03A232DD64FD%7D)
- 2018-07-07 — Upstream ownership transfer approved
  The New York Public Service Commission approved transfer of 100% of the upstream ownership interests in Cassadaga from Trireme Energy Development LLC to innogy Renewables US LLC per declaratory ruling issued July 17, 2018 (effective July 7, 2018).
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B595C670B-E21A-4244-A248-03A232DD64FD%7D)
- 2020-07-01 — RWE acquires IRUS and Innogy renewable portfolio
  RWE acquired IRUS (the U.S. subsidiary of Innogy), resulting in RWE's reacquisition of Innogy's renewable-energy business, including Cassadaga Wind. IRUS was subsequently merged into an RWE subsidiary called RWE Renewables LLC, and RWE adopted IRUS's obligations and liabilities.
  Source: wsgr.com (https://www.wsgr.com/a/web/wmjxpckwwwuzuKvZGpbaza/memorandum-opinion-121423.pdf)
- 2021-06-06 — Construction completed
  Construction of the Cassadaga Wind Facility was completed.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA1664DB3-1889-41B3-95E1-A5E85E4289F7%7D)
- 2021-08 — Commercial operation achieved
  RWE announced successful completion of construction and commencement of commercial operation for the 125 MW Cassadaga Wind Farm. The facility is now generating clean energy for more than 37,000 homes.
  Source: rwe.com (https://www.rwe.com/en/press/rwe-renewables/2021-08-26-rwes-us-cassadaga-onshore-wind-farm-in-operation/)

## Sources

- [americas.rwe.com](https://americas.rwe.com/projects-and-locations/cassadaga-onshore-wind-farm/) — americas.rwe.com · tier public_source
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B595C670B-E21A-4244-A248-03A232DD64FD%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B6E4EDD22-6EFE-4D04-889D-DD62BE7C4030%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA1664DB3-1889-41B3-95E1-A5E85E4289F7%7D) — documents.dps.ny.gov · tier authoritative
- [mbrweb.ferc.gov](https://mbrweb.ferc.gov/SearchMBRAssetAppendix/AssetAppendixDetails?AssetAppendixId=11705) — mbrweb.ferc.gov · tier authoritative
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/viewerdoclibrary/Filing/Filing1520/Attachments/20191001%20Flg%20Ltr%20Cassadaga%20LGIA.pdf) — nyisoviewer.etariff.biz · tier public_source
- [nordex-online.com](https://www.nordex-online.com/en/product/n117-3600/) — nordex-online.com · tier public_source
- [rwe.com](https://www.rwe.com/en/press/rwe-renewables/2021-08-26-rwes-us-cassadaga-onshore-wind-farm-in-operation/) — rwe.com · tier public_source
- [siemensgamesa.com](https://www.siemensgamesa.com/global/en/home/products-and-services/onshore/wind-turbine-sg-2-6-114.html) — siemensgamesa.com · tier public_source
- [wsgr.com](https://www.wsgr.com/a/web/wmjxpckwwwuzuKvZGpbaza/memorandum-opinion-121423.pdf) — wsgr.com · tier public_source

## Data quality

- The asset is uniquely identified by EIA plant ID 58777, NYISO Service Agreement No. 2475, FERC docket ER20-2202-000, and New York Article 10 case 14-F-0490. Capacity varies slightly across authoritative sources: EIA plant record reports 124 MW, RWE marketing materials report 125 MW, NYISO interconnection filing reports 126 MW, and New York DPS regulatory affidavit reports 125.5 MW (the weighted sum of individual turbine ratings). The 125.5 MW figure is the most precise and is selected as the standard capacity value. The investment figure of more than $200 million is explicitly reported by RWE as project investment in Chautauqua County and should not be confused with the approximately $67.9 million merger-agreement milestone payment to Trireme, which was tied to commercial-operation timing under a separate predecessor transaction. No project-specific lender, debt facility name, debt amount, or separately disclosed tax-equity investor was identified in the reviewed authoritative sources. Financing context is documented at the corporate and acquisition level (Innogy financing the IRUS acquisition and construction), but no named project-level finance structure was found. Interconnection point details may reflect changes from the 2019 LGIA filing, which identified Laona-Falconer Lines 172 and 173.

---