# Copenhagen Wind Farm

NYISO wind_power_plant · https://askthegrid.com/nyiso/assets/plant/copenhagen-wind-farm

Copenhagen Wind Farm is a 79.9 MW onshore wind facility in Lewis and Jefferson counties, New York. The operating facility consists of 40 Vestas V110-2.0 MW turbines that became operational in December 2018. EDF Renewables developed the project; RES performed balance-of-plant construction; and EDF Renewables Asset Optimization provides asset management, balance-of-plant, and remote monitoring services. Power is sold under a 15-year agreement with Narragansett Electric Company, a National Grid subsidiary.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 79.9 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Asset.location.counties: Lewis and Jefferson counties — edf-re.com · confidence: review_required
- Asset.construction jobs: 200 jobs — edf-re.com · confidence: review_required
- Asset.local investment usd: 15000000 USD — edf-re.com · confidence: review_required
- Asset.annual property tax: 700000 USD annually — edf-re.com · confidence: review_required
- Asset.host community agreement usd: 430000 USD — edf-re.com · confidence: review_required
- Asset.cultural mitigation agreement usd: 60000 USD — edf-re.com · confidence: review_required
- Asset.site development acres: 74 acres — thewessongrp.com · confidence: review_required
- Asset.homes powered: 35000 homes — edf-re.com · confidence: review_required
- Asset.annual co2 offset metric tons: 177000 metric tons annually — edf-re.com · confidence: review_required

## Timeline

- 2015 — EDF acquires OwnEnergy
  EDF Renewable Energy acquired OwnEnergy, which had developed Copenhagen Wind under a local partnership model. This establishes the development predecessor.
  Source: edf-re.com (https://www.edf-re.com/press-release/edf-renewable-energy-confirms-turbine-order-vestas-copenhagen-wind-project/)
- 2017 — Construction begins
  RES commenced construction of Copenhagen Wind Farm.
  Source: windsystemsmag.com (https://www.windsystemsmag.com/res-completes-80-mw-copenhagen-wind-project-in-new-york/)
- 2017-07-06 — Turbine order and construction contract
  EDF Renewables confirmed order with Vestas Wind Systems A/S for V110-2.0 MW turbines and awarded RES the balance-of-plant construction contract. Construction scheduled to commence August 2017 with commercial operation anticipated for November 2018.
  Source: edf-re.com (https://www.edf-re.com/press-release/edf-renewable-energy-confirms-turbine-order-vestas-copenhagen-wind-project/)
- 2018-12-21 — Construction completion
  RES completed construction of the Copenhagen Wind Farm consisting of 40 Vestas V110 2.0 MW turbines in Jefferson and Lewis counties, New York.
  Source: windsystemsmag.com (https://www.windsystemsmag.com/res-completes-80-mw-copenhagen-wind-project-in-new-york/)
- 2019-01-14 — Commercial operation announcement
  EDF Renewables North America announced that the 80 MW Copenhagen Wind Project was fully operational and delivering electricity to the grid.
  Source: edf-re.com (https://www.edf-re.com/press-release/edf-renewables-north-america-announces-commercial-operation-at-copenhagen-wind-project-in-new-york/)

## Sources

- [edf-re.com](https://www.edf-re.com/press-release/edf-renewable-energy-confirms-turbine-order-vestas-copenhagen-wind-project/) — edf-re.com · tier public_source
- [edf-re.com](https://www.edf-re.com/press-release/edf-renewables-north-america-announces-commercial-operation-at-copenhagen-wind-project-in-new-york/) — edf-re.com · tier public_source
- [edf-re.com](https://www.edf-re.com/project/copenhagen-wind/) — edf-re.com · tier public_source
- [thewessongrp.com](https://www.thewessongrp.com/projects/copenhagen-wind-farm) — thewessongrp.com · tier public_source
- [windsystemsmag.com](https://www.windsystemsmag.com/res-completes-80-mw-copenhagen-wind-project-in-new-york/) — windsystemsmag.com · tier public_source

## Data quality

- The 2021 Masdar transaction disclosed a 50% acquisition in an eight-project, 1.6 GW portfolio. The official announcement identifies three wind projects in Texas and Nebraska and five solar projects in California—not Copenhagen Wind Farm. No Copenhagen-specific consideration or inclusion was identified in the public disclosure. No project-specific debt, tax-equity investment structure, financial-close amount, lender name, or financing amount was identified in the supplied research. The 15-year PPA with Narragansett Electric is a power-sale contract, not project financing. The plant record lists Copenhagen Wind Farm, LLC (2013 to 2018) and EDF Renewable Asset Holdings, Inc. (2015 to 2024) as previous operators, but operator listing is not evidence of ownership transfer. All current and historical control remains with EDF Renewables and its subsidiaries. EDF Renewables Asset Optimization is identified as providing operational management services including 24/7/365 remote monitoring and diagnostics from a San Diego-based Operations Control Center.

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/copenhagen-wind-farm

Source: Ask the Grid — https://askthegrid.com/
