# Empire Generating Co LLC

NYISO power_plant · https://askthegrid.com/nyiso/assets/plant/empire-generating-co-llc

Empire Generating Co LLC is a 635 MW natural-gas-fired combined-cycle power plant located at 75 Riverside Avenue in Rensselaer, New York. The facility entered commercial operation on August 31, 2010, and comprises two GE 7FA combustion turbines, two Alstom triple-pressure heat-recovery steam generators, and one GE D-11 reheat steam turbine configured in a 2x1 combined-cycle arrangement. Low-sulfur fuel oil is available as backup fuel. The plant interconnects to the NYISO transmission system at the Reynolds Road 345 kV Substation and sells merchant energy, capacity, and ancillary services into the NYISO competitive wholesale markets. Following a bankruptcy restructuring in 2019, the facility is currently owned by a consortium comprising ITOCHU Corporation (50%), The Kansai Electric Power Co., Inc. (25%), and Tokyo Gas Co., Ltd. (25%), with asset management by Tyr Energy and operations and maintenance provided by NAES Corporation.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 653.7 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Technical.power mw: 635 MW — documents.dps.ny.gov · confidence: review_required
- Technical.unit count: 2 — nyiso.com · confidence: review_required
- Technical.unit configuration: Two GE 7FA combustion turbines, two Alstom triple-pressure heat-recovery steam generators, and one GE D-11 reheat steam turbine — documents.dps.ny.gov · confidence: review_required
- Technical.commercial operation date: 2010-08-31 — documents.dps.ny.gov · confidence: review_required
- Technical.site acres: 40 acres — basf.com · confidence: review_required
- Operations.substation: Reynolds Road 345 kV Substation — nyiso.com · confidence: review_required
- Operations.grid role: Merchant wholesale generation resource — tyrenergy.com · confidence: review_required

## Timeline

- 2007-07 — Energy Capital Partners acquisition
  Energy Capital Partners purchased the Empire power plant in July 2007 during the late stages of project development and construction.
  Source: ecpgp.com (https://www.ecpgp.com/equity/portfolio/empire)
- 2009 — Construction and equipment installation
  CH2M HILL performed integrated engineering, procurement, and construction for the more-than-$500 million combined-cycle facility. Equipment installation began in early 2009.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B34156325-4F95-4153-B8C6-925B7981BD40%7D)
- 2010-08-31 — Commercial operation
  The facility became fully operational on August 31, 2010, with all equipment installed and tested.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B34156325-4F95-4153-B8C6-925B7981BD40%7D)
- 2017-03 — Sale by Energy Capital Partners
  Energy Capital Partners sold the Empire power plant to the consortium of buyers.
  Source: ecpgp.com (https://www.ecpgp.com/equity/portfolio/empire)
- 2019 — Bankruptcy restructuring and debt swap
  Empire Generating underwent bankruptcy restructuring. The restructuring provided for a credit bid of outstanding prepetition credit-agreement obligations and approval of a $353 million debt swap in exchange for handing the plant operator to secured lenders.
  Source: news.bloomberglaw.com (https://news.bloomberglaw.com/bankruptcy-law/empire-generatings-353-million-bankruptcy-debt-swap-approved)
- 2020 — Post-bankruptcy operation
  Empire Generating was identified as continuing to own and operate the plant after the bankruptcy restructuring.
  Source: timesunion.com (https://www.timesunion.com/business/article/Rensselaer-power-plant-needs-changes-to-stay-15750970.php)

## Sources

- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B34156325-4F95-4153-B8C6-925B7981BD40%7D) — documents.dps.ny.gov · tier authoritative
- [news.bloomberglaw.com](https://news.bloomberglaw.com/bankruptcy-law/empire-generatings-353-million-bankruptcy-debt-swap-approved) — news.bloomberglaw.com · tier public_source
- [tyrenergy.com](https://tyrenergy.com/tyr-energy-led-consortium-agrees-to-acquire-empire-generation-facility/) — tyrenergy.com · tier public_source
- [basf.com](https://www.basf.com/us/en/media/news-releases/2011/09/p-10-0083) — basf.com · tier public_source
- [ecpgp.com](https://www.ecpgp.com/equity/portfolio/empire) — ecpgp.com · tier public_source
- [itochu.co.jp](https://www.itochu.co.jp/en/news/press/2016/161014.html) — itochu.co.jp · tier public_source
- [nyiso.com](https://www.nyiso.com/documents/20142/54804583/04b_EDS-2025-01_Report_for_TPAS_OC.pdf/33c219c8-c7fa-ec99-cc59-28faed880de1) — nyiso.com · tier authoritative
- [timesunion.com](https://www.timesunion.com/business/article/Rensselaer-power-plant-needs-changes-to-stay-15750970.php) — timesunion.com · tier public_source

## Data quality

- The evidence supports approximately 635 MW of plant capacity per the 2009 EPC record and subsequent regulatory filings; the provided anchor value of 653.7 MW is not directly supported by the candidate research and may reflect a different rating basis (e.g., nameplate with duct firing). Commercial-operation timing is reported as August 31, 2010 by the EPC record and as September 2010 by ECP and other project sources; the August 31 date is more precise and is used as the supported value. The plant's leased site area is 40 acres, identified by BASF as the portion of its former 90-acre Rensselaer property leased to Empire Generating Company for power plant operations. A 2019 bankruptcy restructuring followed. The plant is identified as an exempt wholesale generator (FERC docket 07-37-000) and participates in NYISO wholesale markets as a merchant generation resource. NYISO identifiers include the plant's two market-generator units (Empire_CC1 with ID 323656 and Empire_CC2 with ID 323658) and the resource ID R1315. The reviewed evidence does not document a subsequent expansion, repowering, or retirement of this exact Rensselaer facility through the most recent status date of March 2026. The plant is modeled as an operating resource in NYISO's 2025 deliverability study. The 2019 bankruptcy materials support a lender credit-bid restructuring and transfer of control to secured lenders, but the retrieved evidence does not provide the complete post-bankruptcy legal ownership chain.

---