Equus Freeport Power is a dual-fueled simple-cycle combustion-turbine facility located at 289 Buffalo Avenue in Freeport, Nassau County, New York. The facility operates one GE LM6000 PC Sprint turbine, rated at 48 MW, burning natural gas as the primary fuel and low-sulfur distillate fuel as backup. It began commercial operation in June 2004 and operates as an independent power producer in the New York Independent System Operator (NYISO) market.

## Key facts

- Technology: Natural Gas Fired Combustion Turbine
- Power capacity: 120 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Technology.fuel: Natural gas (primary); kerosene/distillate (backup) — jpowerusa.com · confidence: review_required
- Technology.type: Simple-cycle dual-fueled combustion turbine — jpowerusa.com · confidence: review_required
- Equipment.turbine model: GE LM6000 PC Sprint — jpowerusa.com · confidence: review_required
- Equipment.emission control scr: Selective Catalytic Reduction (SCR) and water injection — extapps.dec.ny.gov · confidence: review_required
- Equipment.emission control co: Oxidation catalyst — extapps.dec.ny.gov · confidence: review_required

## Timeline

- 2004-06 — Commercial operation date
  The facility began commercial operation with the GE LM6000 PC Sprint turbine.
  Source: jpowerusa.com (https://www.jpowerusa.com/projects/equus-power-freeport)
- 2009-07-31 — New York State Title V operating air permit issued
  New York State DEC issued the Title V permit (Permit ID: 1-2820-04508/00005) for the Equus Freeport Power Generating Station. The permit identifies one GE LM6000 combustion turbine firing natural gas with distillate backup, equipped with emissions-control systems.
  Source: extapps.dec.ny.gov (https://extapps.dec.ny.gov/data/dar/afs/permits/prr_128200450800005.pdf)
- 2016-10-31 — Deactivation notice filed
  Equus Power I, L.P. submitted a generator deactivation notice to NYISO for unit GT1.
  Source: nyiso.com (https://www.nyiso.com/documents/20142/1403511/Withdrawal%20of%20Generator%20Deactivation%20Notice%20for%20Freeport%20EQUUS%20GT1.pdf/8722b85a-5e5a-0434-b530-bd15be7021fc)
- 2017-09-18 — Deactivation notice withdrawn
  Equus Power I, L.P., represented by J-Power USA, formally withdrew the GT1 deactivation notice and stated its intention to continue operating the Equus unit for the foreseeable future.
  Source: nyiso.com (https://www.nyiso.com/documents/20142/1403511/Withdrawal%20of%20Generator%20Deactivation%20Notice%20for%20Freeport%20EQUUS%20GT1.pdf/8722b85a-5e5a-0434-b530-bd15be7021fc)
- 2025-01-30 — Acquisition of four New York plants closed
  Hull Street Energy completed its acquisition of 100% of the four New York thermal power plants, including Equus Power I, L.P. The facility now operates as part of the Milepost Power fleet.
  Source: hullstreetenergy.com (https://hullstreetenergy.com/blog/hull-street-energy-acquires-new-york-power-plants-from-j-power-usa/)

## Sources

- [extapps.dec.ny.gov](https://extapps.dec.ny.gov/data/dar/afs/permits/prr_128200450800005.pdf) — extapps.dec.ny.gov · tier authoritative
- [hullstreetenergy.com](https://hullstreetenergy.com/blog/hull-street-energy-acquires-new-york-power-plants-from-j-power-usa/) — hullstreetenergy.com · tier public_source
- [gevernova.com](https://www.gevernova.com/gas-power/products/gas-turbines/lm6000) — gevernova.com · tier public_source
- [jpowerusa.com](https://www.jpowerusa.com/projects/equus-power-freeport) — jpowerusa.com · tier public_source
- [nyiso.com](https://www.nyiso.com/documents/20142/1403511/Withdrawal%20of%20Generator%20Deactivation%20Notice%20for%20Freeport%20EQUUS%20GT1.pdf/8722b85a-5e5a-0434-b530-bd15be7021fc) — nyiso.com · tier authoritative

## Data quality

- The official J-Power USA project page reports a 48 MW capacity while EIA-derived records report 60 MW nameplate capacity with 45.9 MW summer and 47.1 MW winter operating ratings. The discrepancy reflects different capacity definitions (project vs. nameplate vs. seasonal). The 48 MW project figure is used in the public description as the most directly attributable to the official project source. The facility operates one GE LM6000 PC Sprint turbine. The permit and project records each independently confirm one unit, and neither source indicates multiple turbines or a phased expansion. A deactivation notice submitted on October 31, 2016 was withdrawn on September 18, 2017, with J-Power USA stating its intention to continue operating the unit. No subsequent retirement or repowering event was identified through the query date. The August 1, 2024 transaction announcement described an agreement to acquire a four-plant portfolio providing approximately 300 MW. The January 30, 2025 announcement confirmed the transaction had closed with Hull Street Energy acquiring 100% of the four plants. No plant-specific purchase price, consideration, or financing terms were disclosed in either announcement. No project-specific financing agreement, lender, principal amount, or financing close date was identified in the candidate research. A 2004 NYISO study included analytical assumptions that such plants would be financed on the parent company's balance sheet; those were study assumptions, not evidence of actual Equus financing. The exact asset is distinguished from other Equus, Freeport, or Long Island resources by EIA plant code 56032, EIA utility code 49845, EIA generator code 0001, NYISO unit identifier GT1, and the single 289 Buffalo Avenue address with one GE LM6000 configuration. The plant record indicates generation data through December 2024 and status as 'Operating,' with no retirement or mothballing date identified.
- Open question: [object Object]
- Open question: [object Object]
- Open question: [object Object]
- Open question: [object Object]
- Open question: [object Object]

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/equus-freeport-power

Source: Ask the Grid — https://askthegrid.com/