# High River Energy Center, LLC

NYISO solar_power_plant · https://askthegrid.com/nyiso/assets/plant/high-river-energy-center-llc

High River Energy Center is a 90 MW utility-scale solar photovoltaic facility in the Town of Florida, Montgomery County, New York, in NYISO Zone F. High River Energy Center, LLC, formed in August 2017, is an indirect wholly owned subsidiary of NextEra Energy Resources, LLC. The project consists of commercial-scale solar arrays using Jinko 415 W and Safe Harbor 370 W photovoltaic modules (322,010 total modules), 12,385 strings of DC-coupled arrays with both fixed-tilt and single-axis tracking systems, and 28 Power Electronics FS3350MVA inverters rated 3.465 MW each. The facility generates electricity at 34.5 kV internally, steps voltage to 115 kV at an on-site collection substation, and interconnects through a Point of Interconnection switchyard to National Grid's existing Stoner-Rotterdam #12 115 kV transmission line via a 500-foot 115 kV transmission line.

## Key facts

- Technology: Solar Photovoltaic
- Power capacity: 90 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Site.location.town: Town of Florida — documents.dps.ny.gov · confidence: review_required
- Site.location.county: Montgomery County — documents.dps.ny.gov · confidence: review_required
- Site.location.state: New York — documents.dps.ny.gov · confidence: review_required
- Technical.power rating: 90 MW — documents.dps.ny.gov · confidence: review_required
- Technical.fuel type: solar — documents.dps.ny.gov · confidence: review_required
- Technical.technology: Solar Photovoltaic — highriverenergycenter.com · confidence: review_required
- Site.area acres: 1221 acres — documents.dps.ny.gov · confidence: review_required
- Site.fenced area acres: 465 acres — highriverenergycenter.com · confidence: review_required
- Technical.modules.total count: 322010 modules — highriverenergycenter.com · confidence: review_required
- Technical.modules.jinko count: 291928 modules — highriverenergycenter.com · confidence: review_required
- Technical.modules.safe harbor count: 30082 modules — highriverenergycenter.com · confidence: review_required
- Technical.inverters.count: 28 inverters — highriverenergycenter.com · confidence: review_required
- Technical.dc system voltage: 1500 V — highriverenergycenter.com · confidence: review_required
- Technical.interconnection voltage: 115 kV — documents.dps.ny.gov · confidence: review_required
- Market.balancing authority: NYISO — documents.dps.ny.gov · confidence: review_required
- Market.market zone: Zone F — documents.dps.ny.gov · confidence: review_required
- Environmental.co2 reduction annual: 49754 tons/year — documents.dps.ny.gov · confidence: review_required
- Environmental.so2 reduction annual: 11 tons/year — documents.dps.ny.gov · confidence: review_required
- Environmental.nox reduction annual: 15 tons/year — documents.dps.ny.gov · confidence: review_required
- Financing.portfolio debt limit: 800000000 USD — documents.dps.ny.gov · confidence: review_required

## Timeline

- 2017-08-25 — High River Energy Center, LLC formation
  High River Energy Center, LLC was formed as a Delaware limited liability company to develop, own, operate, and maintain the solar project.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BF07F5F90-0000-C810-BF9B-FECB6B829DC3%7D)
- 2018 — NYSERDA renewable energy credits purchase agreement
  High River signed a long-term agreement with NYSERDA to sell renewable energy credits generated by the project.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B15EECD05-9D0A-40EA-855E-B9F9D42350D8%7D&DocTitle=Exhibit%2002.%20Overview%20and%20Public%20Involvement)
- 2021-03-11 — Article 10 Certificate of Environmental Compatibility and Public Need granted
  The New York State Board on Electric Generation Siting and the Environment granted High River authority to construct and operate the approximately 90 MW facility in Montgomery County.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BF07F5F90-0000-C810-BF9B-FECB6B829DC3%7D)

## Sources

- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B15EECD05-9D0A-40EA-855E-B9F9D42350D8%7D&DocTitle=Exhibit%2002.%20Overview%20and%20Public%20Involvement) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B299A8CDD-6DCA-4711-9974-7B447CFAB0D5%7D&DocTitle=Exhibit%2034.%20Electric%20Interconnection) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B9F25FAC3-75F6-47AF-A710-CCB68F2A16EF%7D&DocTitle=Exhibit%2008.%20Electric%20System%20Production%20Modeling) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BF07F5F90-0000-C810-BF9B-FECB6B829DC3%7D) — documents.dps.ny.gov · tier authoritative
- [highriverenergycenter.com](https://highriverenergycenter.com/high-river-solar-energy-center/) — highriverenergycenter.com · tier public_source
- [highriverenergycenter.com](https://highriverenergycenter.com/wp-content/uploads/2019/10/Exhibit-11.-Preliminary-Design-Drawings.pdf) — highriverenergycenter.com · tier public_source
- [highriverenergycenter.com](https://highriverenergycenter.com/wp-content/uploads/2020/03/Attachment-D.-Updated-Proposed-Layout-Site-Plan-and-Civil-Design-1-of-2.pdf) — highriverenergycenter.com · tier public_source
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/viewerdoclibrary/Filing/Filing5135/Attachments/20240108_NYISOFlgLtr_Amd%20Rst%20High%20River%20Solar.pdf) — nyisoviewer.etariff.biz · tier public_source
- [power-electronics.com](https://power-electronics.com/en/solar/hem) — power-electronics.com · tier public_source

## Data quality

- Capacity: EIA and official New York DPS filings both identify 90 MW nameplate capacity; independent confirmation across government sources. Location: Official project website and NY DPS case title identify Town of Florida, Montgomery County, New York; confirmed in regulatory record. Equipment: Updated project layout (March 2020) specifies exact module counts (291,928 Jinko 415 W + 30,082 Safe Harbor 370 W = 322,010 total modules), 28 Power Electronics FS3350MVA inverters. Official manufacturer datasheets corroborate equipment families and specifications. August 2024 supported as most recent status. Ownership: Official petition identifies High River as formed August 25, 2017, and as 100% subsidiary of NextEra Energy Resources, LLC (indirect). NextEra Energy, Inc. is ultimate parent. Regulatory approvals: March 11, 2021 Article 10 certificate and December 17, 2021 CPCN both documented in official NY DPS records. No acquisition price or sale consideration disclosed. Interconnection transfer: April 22, 2024 NYPSC Declaratory Ruling approved transfer of switchyard and interconnection facilities (not generation assets) to National Grid for $1 consideration. Generation project ownership remains with High River/NextEra. No material conflicts identified in equipment specifications, capacity, location, or regulatory dates across government and official sources.
- Open question: [object Object]
- Open question: [object Object]

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/high-river-energy-center-llc