# Jamaica Bay Peaking

NYISO power_plant · https://askthegrid.com/nyiso/assets/plant/jamaica-bay-peaking

Jamaica Bay Peaking is a 60.5 MW simple-cycle, dual-fuel (natural gas and petroleum liquids) combustion-turbine peaking plant located in Far Rockaway, Queens County, New York. It is interconnected to the 69 kV system in Long Island Power Authority's service territory at the Far Rockaway substation and participates in the New York Independent System Operator wholesale market. After the PPA expired, the facility operated on a merchant basis in the NYISO wholesale market. As of 2024–2025, emissions-control equipment underperformance resulted in deration to approximately 47 MW and prompted a planned retirement notice; however, the facility returned to market service in May 2026 under an interim service agreement with NYISO, reflecting its critical role in supporting Long Island bulk-power-system reliability.

## Key facts

- Technology: Petroleum Liquids
- Power capacity: 60.5 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Technical.commercial operation date: 2003-07-02 — documents.dps.ny.gov · confidence: review_required
- Technical.power mw: 60.5 MW — mbrweb.ferc.gov · confidence: review_required
- Technical.site acres: 2 acres — documents.dps.ny.gov · confidence: review_required
- Technical.interconnection voltage kv: 69 kV — documents.dps.ny.gov · confidence: review_required
- Identifiers.eia plant id: 56141 — mbrweb.ferc.gov · confidence: review_required
- Identifiers.ferc tariff docket: ER03-623 — elibrary.ferc.gov · confidence: review_required

## Timeline

- 2002-12-19 — CPCN Authorization
  The New York Public Service Commission granted Jamaica Bay Peaking Facility, LLC a Certificate of Public Convenience and Necessity to construct and operate a proposed 48 MW electric generating facility in Far Rockaway.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BABE274CC-0D89-4C73-A0EF-2B02B3E69F48%7D)
- 2003-07-02 — Commercial Operation Date
  Jamaica Bay informed the New York Public Service Commission that it commenced commercial operation.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B075C1375-9A8A-4E9F-B7D5-6E3EAFFB4B9B%7D)
- 2019-02-06 — Acquisition Agreement Announcement
  Hull Street Energy announced that it had entered into a definitive agreement to acquire 100% of the ownership interests in the Bayswater and Jamaica Bay generating stations from a subsidiary of NextEra Energy Resources, LLC.
  Source: hullstreetenergy.com (http://hullstreetenergy.com/blog/hull-street-energy-acquires-two-natural-gas-fired-plants-in-new-york-2)
- 2019-03-19 — Ownership Transfer Regulatory Approval
  The New York PSC issued a declaratory ruling allowing the upstream transfer from FPL Energy New York to MPH Rockaway Peakers without further review under PSL Section 70.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC72D7385-6482-40FF-964C-B6FD23C3203B%7D)
- 2019-03-29 — Acquisition Completion
  Hull Street Energy completed the acquisition of the Bayswater and Jamaica Bay generating stations from a subsidiary of NextEra Energy Resources, LLC.
  Source: hullstreetenergy.com (https://hullstreetenergy.com/blog/hull-street-energy-acquires-two-natural-gas-fired-plants-in-new-york/)
- 2024-08 — Equipment Failure and Emissions Control Degradation
  A failure occurred in one of the twin-pack engines at the Bayswater facility. Jamaica Bay's emissions control equipment was underperforming, making it challenging to meet air permit limitations.
  Source: lipower.org (https://www.lipower.org/wp-content/uploads/2025/11/6.-Consideration-of-Approval-of-a-Capacity-Purchase-Agreement.pdf)
- 2025-01 — Planned Deactivation Announcement
  Hull Street informed LIPA that it was planning to deactivate both Jamaica Bay and Bayswater due to the high costs of restoration and maintenance. Jamaica Bay was derated to 47 MW as a result of emissions control issues.
  Source: lipower.org (https://www.lipower.org/wp-content/uploads/2025/11/6.-Consideration-of-Approval-of-a-Capacity-Purchase-Agreement.pdf)
- 2025-07-24 — Retirement Notice Filed
  MPH Far Rockaway submitted a notice of intent to retire the Far Rockaway Peakers (Bayswater and Jamaica Bay) to the New York Public Service Commission.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA0122C9E-0000-CD74-A203-AA681DC0EDBE%7D)
- 2025-10-31 — Identified Retirement Date (Not Completed)
  Identified retirement date for Far Rockaway Peakers. The facilities could not deactivate on this date because NYISO reliability needs required continued service.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA0122C9E-0000-CD74-A203-AA681DC0EDBE%7D)
- 2025-11-12 — Proposed Capacity Purchase Agreement
  LIPA proposed authorizing a 10-year Capacity Purchase Agreement with MPH Rockaway Peakers for purchase of Jamaica Bay and Bayswater capacity, estimated to cost approximately $91 million over the term. The CPA would require restoration to design capability and would begin around March 2026.
  Source: lipower.org (https://www.lipower.org/wp-content/uploads/2025/11/6.-Consideration-of-Approval-of-a-Capacity-Purchase-Agreement.pdf)
- 2026-05-01 — Return to Market Service
  Jamaica Bay and Bayswater returned to market service effective as of the start of HB 1 on May 1, 2026, following continued operations under an Interim Service Provider agreement. NYISO had identified Jamaica Bay as a component of the selected solution for Long Island bulk-power-system reliability needs.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA0122C9E-0000-CD74-A203-AA681DC0EDBE%7D)

## Sources

- [hullstreetenergy.com](http://hullstreetenergy.com/blog/hull-street-energy-acquires-two-natural-gas-fired-plants-in-new-york-2) — hullstreetenergy.com · tier public_source
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B075C1375-9A8A-4E9F-B7D5-6E3EAFFB4B9B%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA0122C9E-0000-CD74-A203-AA681DC0EDBE%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BABE274CC-0D89-4C73-A0EF-2B02B3E69F48%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC72D7385-6482-40FF-964C-B6FD23C3203B%7D) — documents.dps.ny.gov · tier authoritative
- [elibrary.ferc.gov](https://elibrary.ferc.gov/eLibrary/search?q=searchText%3D*%26searchFullText%3Dfalse%26searchDescription%3Dtrue%26dateType%3Dfiled_date%26startDate%3D1904-01-01%26endDate%3D2021-01-25%26docketNumber%3D%26subDocketNumbers%3D%26accessionNumber%3D20090125-0444%26eFiling%3Dfalse%26allDates%3Dtrue) — elibrary.ferc.gov · tier authoritative
- [extapps.dec.ny.gov](https://extapps.dec.ny.gov/data/dar/afs/permits/263080051300001.pdf) — extapps.dec.ny.gov · tier authoritative
- [hullstreetenergy.com](https://hullstreetenergy.com/blog/hull-street-energy-acquires-two-natural-gas-fired-plants-in-new-york/) — hullstreetenergy.com · tier public_source
- [mbrweb.ferc.gov](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=275) — mbrweb.ferc.gov · tier authoritative
- [lipower.org](https://www.lipower.org/wp-content/uploads/2025/11/6.-Consideration-of-Approval-of-a-Capacity-Purchase-Agreement.pdf) — lipower.org · tier public_source

## Data quality

- The facility is a single asset (Jamaica Bay) with two combustion turbines and one generator, clearly distinguished from the nearby Bayswater facility by EIA plant ID 56141, NYISO PTID 37804, DEC permit, and PSC case number. Capacity ratings vary by context: the original 2002 PSC order authorized 48 MW; later PSC records describe 54.5 MW summer rating; current FERC and NYISO registers show 60.5 MW. These differences reflect changes in rating methodology and operating experience rather than conflicting factual claims. The 60.5 MW is the current nameplate capacity. The facility is consistently described as dual-fuel (natural gas and petroleum liquids) and is capable of switching between fuels. The PSC order and DEC permit confirm dual-fuel operation, while the EIA petroleum-liquids classification is an artifact of fuel categorization and does not contradict gas capability. The purchase price was not disclosed publicly, and the PSC purchase-and-sale agreement was marked confidential. The facility did not retire on its October 31, 2025 identified retirement date. Instead, it continued operations under an NYISO Interim Service Provider agreement and returned to market service on May 1, 2026. This reflects the asset's critical role in Far Rockaway load-pocket reliability. The 2025 LIPA CPA is proposed but not yet executed. The estimated $91 million cost is LIPA's projected 10-year payment obligation, separate from the original project financing of approximately $50 million. Emissions-control equipment degradation and planned repairs are documented as of 2024–2025, but the record does not confirm completion of all repairs or equipment replacement by July 25, 2026.
- Open question: [object Object]
- Open question: [object Object]
- Open question: [object Object]

---