# Jericho Rise Wind Farm LLC

NYISO wind_power_plant · https://askthegrid.com/nyiso/assets/plant/jericho-rise-wind-farm-llc

Jericho Rise Wind Farm is a 77.7 MW onshore wind facility in Franklin County, New York, located between the towns of Chateaugay and Belmont. It interconnects to the New York Power Authority's existing 115 kV Willis Substation through the New York Independent System Operator (NYISO) market framework under Service Agreement 2276.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 77.7 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Asset.capacity mw: 77.7 MW — nyisoviewer.etariff.biz · confidence: review_required
- Asset.fuel type: wind — nyisoviewer.etariff.biz · confidence: review_required
- Asset.technology: Onshore Wind Turbine — nyisoviewer.etariff.biz · confidence: review_required
- Asset.location.county: Franklin — mbrweb.ferc.gov · confidence: review_required
- Asset.location.state: New York — mbrweb.ferc.gov · confidence: review_required
- Asset.commercial operation date: 2016-12 — mbrweb.ferc.gov · confidence: review_required
- Asset.unit count: 37 turbines — nyisoviewer.etariff.biz · confidence: review_required
- Asset.unit rating mw: 2.1 MW — nyisoviewer.etariff.biz · confidence: review_required
- Asset.turbine manufacturer: Gamesa — nyisoviewer.etariff.biz · confidence: review_required
- Asset.turbine model: G114-2.1 MW — nyisoviewer.etariff.biz · confidence: review_required
- Asset.interconnection.voltage kv: 115 kV — nyisoviewer.etariff.biz · confidence: review_required
- Asset.interconnection.substation: Willis Substation — nyisoviewer.etariff.biz · confidence: review_required
- Asset.site acres: 6190 acres — edp.com · confidence: review_required
- Asset.site parcels: 121 parcels — edp.com · confidence: review_required
- Asset.balancing authority: New York Independent System Operator (NYISO) — nyiso.com · confidence: review_required
- Asset.nyiso ptid: 323719 — nyiso.com · confidence: review_required
- Asset.status: Operating — mbrweb.ferc.gov · confidence: review_required
- Asset.economic impact.total project impact usd: 45000000 USD — edp.com · confidence: review_required
- Asset.economic impact.local govt payments usd: 8500000 USD — edp.com · confidence: review_required
- Asset.economic impact.landowner payments usd: 15000000 USD — edp.com · confidence: review_required
- Asset.economic impact.local spending usd: 22300000 USD — edp.com · confidence: review_required
- Asset.construction jobs: 76 jobs — edp.com · confidence: review_required
- Asset.permanent jobs: 14 jobs — edp.com · confidence: review_required
- Asset.annual water savings gallons: 138000000 gallons — edp.com · confidence: review_required

## Timeline

- 2016-06-29 — Interconnection Agreement Executed
  NYISO, NYPA, and Jericho Rise Wind Farm LLC executed Service Agreement No. 2276, the Large Generator Interconnection Agreement (LGIA), establishing the 77.7 MW wind farm's connection to the Willis Substation at 115 kV. FERC Docket ER16-2183-000.
  Source: nyisoviewer.etariff.biz (https://nyisoviewer.etariff.biz/ViewerDocLibrary/MasterTariffs/58TariffSections/4304.pdf)

## Sources

- [blackandmcdonald.com](https://blackandmcdonald.com/us/projects/jericho-rise-wind-farm/) — blackandmcdonald.com · tier public_source
- [edp.com](https://edp.com/en/north-america/na/projects/jericho-rise-wind-farm) — edp.com · tier public_source
- [mbrweb.ferc.gov](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=444) — mbrweb.ferc.gov · tier authoritative
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/ViewerDocLibrary/MasterTariffs/58TariffSections/4304.pdf) — nyisoviewer.etariff.biz · tier public_source
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/viewerdoclibrary/FercDockets/1076.pdf) — nyisoviewer.etariff.biz · tier public_source
- [edp.com](https://www.edp.com/sites/default/files/document/2025-04/Final%2520Environmental%2520Impact%2520Statement%2520%2528FEIS%2529.pdf) — edp.com · tier public_source
- [nyiso.com](https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf) — nyiso.com · tier authoritative
- [thewessongrp.com](https://www.thewessongrp.com/projects/jericho-rise-wind-farm) — thewessongrp.com · tier public_source

## Data quality

- The EIA/FERC record identifies plant code 59629, Jericho Rise Wind Farm LLC, Franklin County, 77.7 MW, operating month 12 of 2016, and no inactive date as of May 4, 2021. Equipment specification (37 Gamesa G114 2.1 MW turbines) is supported by the executed LGIA and FEIS documents. Therefore, a standalone project finance amount is not stated. The exact plant identity is clearly established through EIA plant code 59629, FERC docket ER16-2183-000, and NYISO Service Agreement 2276, all of which reference the same asset.

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/jericho-rise-wind-farm-llc

Source: Ask the Grid — https://askthegrid.com/