# Lockport Energy Associates LP

NYISO power_plant · https://askthegrid.com/nyiso/assets/plant/lockport-energy-associates-lp

Lockport Energy Associates, L.P. owns and operates a natural-gas-fired combined-cycle cogeneration facility in Lockport, Niagara County, New York. The facility, identified as generator LEA1, has approximately 221 MW of capacity and began commercial operation on July 8, 1992. It produces electricity sold to New York State Electric & Gas Corporation and process steam sold to the adjacent General Motors Western New York Lockport Components plant. The facility comprises three General Electric P-6541B Frame 6 combustion turbine generators, three heat recovery steam generators, and one steam turbine generator, along with an auxiliary boiler and three starting diesel engines.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 221.3 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Commercial operation date: 1992 year — gem.wiki · confidence: review_required
- Fuel type: Natural gas and fuel oil — gem.wiki · confidence: review_required
- Technology type: Combined-cycle cogeneration (natural gas-fired) — gem.wiki · confidence: review_required
- County: Niagara — mbrweb.ferc.gov · confidence: review_required
- Latitude: 43.161947 degrees WGS 84 — gem.wiki · confidence: review_required
- Power mw: 221 MW — gem.wiki · confidence: review_required
- Unit count: 1 count — gem.wiki · confidence: review_required
- Chp status: yes — gem.wiki · confidence: review_required
- Site acres: 15.4 acres — niagaracountybusiness.com · confidence: review_required
- Steam output lbhr: 315800 pounds per hour — extapps.dec.ny.gov · confidence: review_required
- Fortistar upstream ownership pct: 75.674 percent — documents.dps.ny.gov · confidence: review_required

## Timeline

- 1992-07-08 — Commercial operation date
  The Lockport cogeneration facility began commercial operation on July 8, 1992. Electricity was sold to New York State Electric and Gas Corporation (NYSEG), and electricity and steam were sold to the Harrison Radiator Division of General Motors Corporation.
  Source: fossil.energy.gov (https://fossil.energy.gov/ng_regulation/sites/default/files/programs/gasregulation/authorizations/1992/orders/ord662.pdf)
- 2009-01-20 — Lightened regulatory regime established
  The New York Public Service Commission issued an order granting Lockport Energy Associates, L.P. a Certificate of Public Convenience and Necessity and providing for lightened and incidental regulation of both electric and steam operations.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B3BC32365-88FB-45E8-8BF0-EFAD8F91035E%7D)
- 2014-08-28 — Passive ownership transfer proposed
  Lockport Energy Associates, L.P., LEA A4 LLC, Lockport Power Cogeneration LLC, and LEA LP IV LLC filed a joint petition with the New York PSC seeking a declaratory ruling regarding the proposed transfer of a combined 24.3% limited-partnership interest in LEA to LEA A4 LLC. The filing stated that the transferred interests were passive and that Harbinger Independent Power Fund I LLC would exit as an owner.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BFB8820E6-C910-4107-BB15-03E3CD11D473%7D)
- 2018-04-19 — Financing authorization approved
  The New York Public Service Commission approved Lockport Energy Associates, L.P. and Castleton Power, LLC to enter into aggregate indebtedness of up to $200 million. The stated purpose was to cross-collateralize debt with affiliated interests and maintain access to capital. The approval allowed flexibility regarding financing entities, payment terms, and amounts financed up to the aggregate cap.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B3BC32365-88FB-45E8-8BF0-EFAD8F91035E%7D)
- 2026-04-14 — Proposed sale to Castleport Power
  Lockport Energy Associates, L.P., Castleton Power, LLC, and Castleport Power, LLC filed a verified joint petition with the New York Public Service Commission seeking a declaratory ruling regarding the proposed transfer of 100% of LEA's indirect ownership interests to Castleport Power, LLC. The petition sought approval or a finding that further review under PSL Sections 70 and 83 was not required. The available case record indicates this is a filed petition and does not establish that the transaction closed by the document-verification date (July 25, 2026).
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC063919D-0000-C844-9FEC-D61C9962F67B%7D&DocTitle=Declaratory%20Ruling%20Petition)

## Sources

- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B3BC32365-88FB-45E8-8BF0-EFAD8F91035E%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B877D1B6B-CB3C-4A95-8912-5687F2AB880F%7D) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC063919D-0000-C844-9FEC-D61C9962F67B%7D&DocTitle=Declaratory%20Ruling%20Petition) — documents.dps.ny.gov · tier authoritative
- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BFB8820E6-C910-4107-BB15-03E3CD11D473%7D) — documents.dps.ny.gov · tier authoritative
- [extapps.dec.ny.gov](https://extapps.dec.ny.gov/data/dar/afs/permits/929260001600036_r1.pdf) — extapps.dec.ny.gov · tier authoritative
- [extapps.dec.ny.gov](https://extapps.dec.ny.gov/data/dar/afs/permits/929260001600036_r2.pdf) — extapps.dec.ny.gov · tier authoritative
- [fossil.energy.gov](https://fossil.energy.gov/ng_regulation/sites/default/files/programs/gasregulation/authorizations/1992/orders/ord662.pdf) — fossil.energy.gov · tier authoritative
- [mbrweb.ferc.gov](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=194) — mbrweb.ferc.gov · tier authoritative
- [daigasgroup.com](https://www.daigasgroup.com/en/) — daigasgroup.com · tier public_source
- [fortistar.com](https://www.fortistar.com/) — fortistar.com · tier public_source
- [gem.wiki](https://www.gem.wiki/Lockport_power_station) — gem.wiki · tier public_source
- [nerc.com](https://www.nerc.com/globalassets/our-work/reports/regional-audit-reports-of-registered-entities/npcc/2016/2015_public_npcc_lea.pdf) — nerc.com · tier public_source
- [niagaracountybusiness.com](https://www.niagaracountybusiness.com/file-library/100003/Lockport_Industrial_Park_Brochure.pdf) — niagaracountybusiness.com · tier public_source

## Data quality

- The facility is consistently identified in the cited records as Lockport Energy Associates LP / Lockport Cogeneration Facility, but reported capacity varies: 168.8 MW in the 1992 DOE record, 198 MW in a NYSDEC permit, 200 MW in several PSC filings, 210 MW in the 2026 petition, and approximately 221 MW in current plant records. No single documented event (expansion, retirement, or repowering) explains these differences; they likely reflect different rating conventions (gross vs. net, nameplate vs. design) rather than material changes to the physical facility. The current 221 MW rating is selected as the best-supported exact value in the most current authoritative records. The 2018 PSC financing approval authorized up to $200 million of aggregate indebtedness for Lockport Energy Associates, L.P. and Castleton Power LLC together. The record does not establish that the full amount was drawn, nor does it provide a project-construction loan amount, lender, interest rate, or sale consideration. The 2014 and 2021 ownership matters concern transfers of passive or upstream ownership interests rather than documented sales of the physical generating facility. The April 2026 Castleport transaction is described as proposed in the verified joint petition dated April 14, 2026; the cited record does not establish closing by July 25, 2026. No authoritative record located in the cited corpus documents a distinct expansion, repowering, or retirement of generator LEA1. The available evidence instead supports continuous operation from 1992 through the current records. The NYDEC permit identifies the steam purchaser as a 'nearby steam host.' The 2026 PSC petition explicitly identifies this as the 'General Motors Western New York Lockport Components plant,' which is distinguished from the original 1992 DOE record's reference to 'General Motors' Harrison Radiator Division.' The current recipient entity name is preserved from the most recent authoritative filing. The equipment configuration (three GE Frame 6 CTGs, three HRSGs, one STG, one auxiliary boiler, and three starting diesel engines) is supported by explicit permits issued in 2005 and 2016. No later repowering or equipment changes are documented in the reviewed evidence.

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/lockport-energy-associates-lp

Source: Ask the Grid — https://askthegrid.com/
