Morris Ridge Solar is a 177 MWac solar photovoltaic generating facility in the Town of Mount Morris, Livingston County, New York. The facility includes an 83 MW battery energy storage system with four hours of duration. The project interconnects to the NYSEG 230 kV transmission system through a point of interconnection governed by NYISO Service Agreement No. 2790.

## Key facts

- Technology: Solar Photovoltaic
- Power capacity: 177 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Asset.capacity mw: 177 MW — edf-re.com · confidence: review_required
- Asset.capacity dc mw: 229 MWdc — edf-re.com · confidence: review_required
- Asset.storage energy mwh: 332 MWh — edf-re.com · confidence: review_required
- Asset.storage duration hours: 4 hours — edf-re.com · confidence: review_required
- Asset.location.town: Mount Morris — edf-re.com · confidence: review_required
- Asset.operating status: operating — edf-re.com · confidence: review_required
- Asset.balancing authority: New York Independent System Operator — documents.dps.ny.gov · confidence: review_required
- Asset.transmission owner: New York State Electric & Gas Corporation — documents.dps.ny.gov · confidence: review_required

## Timeline

- 2018 — NYSERDA 2018 Renewable Energy Standard Solicitation Award
  Morris Ridge was awarded a long-term contract under NYSERDA's 2018 Renewable Energy Standard solicitation, which provided secured revenue to move the project through development.
  Source: edf-re.com (https://www.edf-re.com/press-release/edf-renewables-north-america-announces-commercial-operation-of-morris-ridge-solar-project/)
- 2023-08-24 — Large Generator Interconnection Agreement Executed
  Standard Large Generator Interconnection Agreement (Service Agreement No. 2790) dated August 24, 2023, among NYISO, NYSEG, and MRSEC, defining interconnection terms and facility requirements.
  Source: documents.dps.ny.gov (https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B90652D8A-0000-CB96-A9EE-23C7B0B4FA22%7D&DocTitle=Executed%20Version_Morris%20Ridge%20Solar%20LGIA_88381783_51_REDACTED)
- 2024-12-16 — Commercial Operation Announced
  EDF Renewables announced that Morris Ridge Solar project is fully operational and delivering electricity to the New York power grid.
  Source: edf-re.com (https://www.edf-re.com/press-release/edf-renewables-north-america-announces-commercial-operation-of-morris-ridge-solar-project/)
- 2025-04-17 — Amended LGIA Accepted by FERC
  FERC accepted the amended and restated LGIA (Service Agreement No. 2790) effective April 17, 2025 (Docket No. ER25-2092-000).
  Source: nyisoviewer.etariff.biz (https://nyisoviewer.etariff.biz/ViewerDocLibrary/FercOrders/20250617-3056_ER25-2092-000%20DLO_37252.htm)

## Sources

- [documents.dps.ny.gov](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B90652D8A-0000-CB96-A9EE-23C7B0B4FA22%7D&DocTitle=Executed%20Version_Morris%20Ridge%20Solar%20LGIA_88381783_51_REDACTED) — documents.dps.ny.gov · tier authoritative
- [files.sma.de](https://files.sma.de/downloads/SCXXXXUP-US-DS-en-27.pdf) — files.sma.de · tier public_source
- [nyisoviewer.etariff.biz](https://nyisoviewer.etariff.biz/ViewerDocLibrary/FercOrders/20250617-3056_ER25-2092-000%20DLO_37252.htm) — nyisoviewer.etariff.biz · tier public_source
- [edf-re.com](https://www.edf-re.com/press-release/edf-renewables-north-america-announces-commercial-operation-of-morris-ridge-solar-project/) — edf-re.com · tier public_source
- [edf-re.com](https://www.edf-re.com/wp-content/uploads/20200221-Morris-Ridge-Master-Public-Meeting-Boards_Reduced.pdf) — edf-re.com · tier public_source
- [edf-re.com](https://www.edf-re.com/wp-content/uploads/Appendix-D.-Design-Drawings-Electrical_Part-1-of-2.pdf) — edf-re.com · tier public_source
- [sma-america.com](https://www.sma-america.com/newsroom/news-details/sma-introduces-sunny-central-2500-ev-us-for-1500-vdc-utility-scale-applications) — sma-america.com · tier public_source

## Data quality

- The 83 MW battery facility was included in the original ORES-permitted scope (June 25, 2021); the evidence does not establish a later expansion. The December 2022 ownership event was an intra-EDF membership-interest assignment, not an identified sale to an unrelated buyer. The transfer to NYSEG concerned interconnection facilities and underlying property, not the solar generating asset; the transfer was to occur at no cost. The reviewed evidence documents construction and operation but does not document retirement or repowering. Equipment evidence identifies specific PV module, inverter, and transformer models used in the facility; official design drawings and OEM product datasheets support these identifications. The project is reported as the first to receive permitting through ORES and the largest operational solar project in New York State at its commercial operation announcement. A NYISO modification record dated March 1, 2024 mentions a reduction in feeders, which is a project configuration change, not a replacement or repowering.