# Pinelawn Power LLC

NYISO power_plant · https://askthegrid.com/nyiso/assets/plant/pinelawn-power-llc

Pinelawn Power LLC is a 82 MW dual-fuel natural-gas/oil combined-cycle generating facility located at 380 Patton Avenue, West Babylon, Suffolk County, New York. The plant entered service in 2005 with simple-cycle operation beginning in July 2005 and full combined-cycle operation in October 2005. The facility comprises a GE LM6000 gas turbine (50 MW), an Innovative Steam Technologies once-through steam generator with natural-gas duct burners, and a Siemens steam turbine (32 MW) in a 1×1 combined-cycle configuration. The plant originally supplied power to the Long Island Power Authority under a 20-year power-purchase agreement. Hull Street Energy acquired the asset from J-Power USA in 2024, and the facility is now part of the Milepost Power fleet. As of June 2025, a NYISO-completed deactivation notice identified a proposed retirement with an earliest possible retirement date of May 15, 2026.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 82 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Development.construction period: 1 years — industrialinfo.com · confidence: review_required
- Commercial.ppa duration: 20 years — industrialinfo.com · confidence: review_required
- Site.acres: 2.3 acres — phoenixpg.com · confidence: review_required

## Timeline

- 2005-04-01 — Pinelawn Peaking Station construction completed
  Construction of Pinelawn Peaking Station completed. Simple-cycle operation began in July 2005; full combined-cycle operation scheduled for October 2005. Project cost $35 million.
  Source: industrialinfo.com (https://www.industrialinfo.com/news/article/pinelawn-power-llc-completes-construction-of-new-80-megawatt-peaking-plant-in-new-york--65204)
- 2005-07-01 — Simple-cycle operation commenced
  Pinelawn Power LLC commenced simple-cycle operation with the combustion-turbine generator.
  Source: industrialinfo.com (https://www.industrialinfo.com/news/article/pinelawn-power-llc-completes-construction-of-new-80-megawatt-peaking-plant-in-new-york--65204)
- 2005-10-01 — Full combined-cycle operation commenced
  Pinelawn Power LLC achieved full combined-cycle operation with both combustion-turbine and steam-turbine generators.
  Source: industrialinfo.com (https://www.industrialinfo.com/news/article/pinelawn-power-llc-completes-construction-of-new-80-megawatt-peaking-plant-in-new-york--65204)
- 2024-08-01 — Hull Street Energy agreed to acquire Pinelawn Power LLC and three other Long Island plants from J-Power USA
  Hull Street Energy announced an agreement to acquire four New York thermal power plants from J-Power USA Generation Partners, L.P., including Pinelawn Power LLC. The portfolio of 300 MW was part of HSE's strategy to grow its Milepost Power fleet.
  Source: hullstreetenergy.com (https://hullstreetenergy.com/blog/hse-to-acquire-new-york-power-plants-from-j-power-usa/)
- 2025-01-30 — Hull Street Energy completed acquisition of Pinelawn Power LLC
  Hull Street Energy completed acquisition of 100% of the four New York thermal power plants from J-Power USA, including Pinelawn Power LLC. Pinelawn is now part of the Milepost Power fleet.
  Source: hullstreetenergy.com (https://hullstreetenergy.com/blog/hull-street-energy-acquires-new-york-power-plants-from-j-power-usa/)
- 2025-06-27 — NYISO completed determination of Pinelawn Power 1 generator deactivation notice
  NYISO determined the generator deactivation notice for Pinelawn Power 1 (PTID 323563, 82.0 MW nameplate) to be complete. Hull Street Energy submitted the notice proposing retirement of the facility.
  Source: nyiso.com (https://www.nyiso.com/documents/20142/1403511/Posting-of-Completed-Generator-Deactivation-Notices-Pinelawn-Power-1.pdf/80fe6301-dfef-1962-14f5-105b1f164179)
- 2026-05-15 — Pinelawn Power 1 Interim Service Provider status ended; unit authorized to deactivate
  NYISO determined that Pinelawn Power 1's Interim Service Provider (ISP) status ended on this date. The unit was authorized to deactivate following ISP termination and satisfaction of all required NYISO administrative procedures.
  Source: nyiso.com (https://www.nyiso.com/documents/20142/15930753/2025-Q3-Short-Term-Reliability-Process-Report-Final.pdf)

## Sources

- [hullstreetenergy.com](https://hullstreetenergy.com/blog/hse-to-acquire-new-york-power-plants-from-j-power-usa/) — hullstreetenergy.com · tier public_source
- [hullstreetenergy.com](https://hullstreetenergy.com/blog/hull-street-energy-acquires-new-york-power-plants-from-j-power-usa/) — hullstreetenergy.com · tier public_source
- [gevernova.com](https://www.gevernova.com/gas-power/products/gas-turbines/lm6000) — gevernova.com · tier public_source
- [industrialinfo.com](https://www.industrialinfo.com/news/article/pinelawn-power-llc-completes-construction-of-new-80-megawatt-peaking-plant-in-new-york--65204) — industrialinfo.com · tier public_source
- [jpowerusa.com](https://www.jpowerusa.com/projects/pinelawn-power/) — jpowerusa.com · tier public_source
- [nyiso.com](https://www.nyiso.com/documents/20142/1403511/Posting-of-Completed-Generator-Deactivation-Notices-Pinelawn-Power-1.pdf/80fe6301-dfef-1962-14f5-105b1f164179) — nyiso.com · tier authoritative
- [nyiso.com](https://www.nyiso.com/documents/20142/15930753/2025-Q3-Short-Term-Reliability-Process-Report-Final.pdf) — nyiso.com · tier authoritative
- [phoenixpg.com](https://www.phoenixpg.com/pinelwan-power) — phoenixpg.com · tier public_source
- [siemens-energy.com](https://www.siemens-energy.com/global/en/home/products-services/product-offerings/steam-turbines.html) — siemens-energy.com · tier public_source

## Data quality

- Capacity reporting varies by source and definition. NYISO nameplate: 82.0 MW. Former owner project page: 79.9 MW. EIA unit sum: 50 MW + 32 MW = 82 MW. Construction report: ~80 MW. Current Milepost portfolio: 75 MW. The selected 82.0 MW nameplate reflects the most recent NYISO regulatory designation. Operating status after May 15, 2026 ISP termination date is not confirmed in retrieved sources. The asset was authorized to deactivate but the retrieved evidence does not independently confirm physical retirement. Simple-cycle operation began July 2005; full combined-cycle operation began October 2005. The facility operated in simple-cycle mode for approximately 3 months while construction continued. The 20-year PPA with LIPA would expire in 2025 if dated from 2005 commercial operation, but the retrieved evidence does not explicitly confirm the PPA end date or whether LIPA continued purchasing after 2025. Original Pinelawn Power LLC joint-venture participants (DiFazio Electric Incorporated and Harbert Power LLC) are not explicitly identified in current ownership records; their roles ended in the initial development phase. The $35 million figure represents the original construction project cost, not the 2024 acquisition price, which was not disclosed in the available sources.

---