South Fork Wind is an operating 130 MW offshore wind farm approximately 35 miles east of Montauk Point in Suffolk County, New York. Developed by Ørsted and now jointly owned by Ørsted and Global Infrastructure Partners (through Skyborn Renewables), the project comprises 12 Siemens Gamesa SG 11.0-200 DD offshore wind turbines and began commercial operations in March 2024.

## Key facts

- Technology: Offshore Wind Turbine
- Power capacity: 130 MW

## Grid and market context

- ISO/RTO: NYISO
- Balancing authority: NYISO

## Source-backed facts

- Distance offshore miles: 35 miles — lipower.org · confidence: review_required
- Technical.site acres: 13700 acres — boem.gov · confidence: review_required
- Technical.lease number: OCS-A 0517 — boem.gov · confidence: review_required
- Customers.homes powered: 70000 homes — lipower.org · confidence: review_required

## Timeline

- 2017-01-01 — LIPA Project Approval
  Long Island Power Authority (LIPA) approved the South Fork Wind project to meet growing electricity demand on Long Island's South Fork peninsula.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2022-01-01 — Construction Start
  Construction of South Fork Wind commenced in January 2022.
  Source: southforkwind.com (https://southforkwind.com/about-south-fork-wind)
- 2022-02-01 — Groundbreaking
  Groundbreaking ceremony for the South Fork Wind project.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2023-05-01 — Onshore Cable Installation
  Onshore cable installation completed as part of construction.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2023-06-01 — First Monopile Foundation Installation
  Installation of the first offshore monopile foundation, marking the 'steel in the water' milestone.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2023-07-01 — Offshore Substation Installation
  The offshore wind substation was installed.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2023-08-01 — Onshore Substation Completion
  The onshore substation was completed.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2023-11-01 — First Turbine Installation
  Installation of the first offshore wind turbine began. Siemens Gamesa turbines were installed at the project.
  Source: southforkwind.com (https://southforkwind.com/news/2023/11/south-fork-wind-set-for-installation-of-first-wind-turbine-offshore)
- 2024-03-01 — Construction Completion
  Construction of South Fork Wind was completed in March 2024.
  Source: southforkwind.com (https://southforkwind.com/about-south-fork-wind)
- 2024-03-14 — Commercial Operations Begin
  South Fork Wind began commercial operations and started producing and delivering electricity to Long Island.
  Source: tethys.pnnl.gov (https://tethys.pnnl.gov/wind-project-sites/south-fork-wind)
- 2024-07-01 — Full Commissioning
  South Fork Wind achieved full commissioning status.
  Source: lipower.org (http://lipower.org/blog/celebrating-one-year-with-south-fork-wind)
- 2024-09-30 — GIP Acquisition of Eversource's 50% Stake Closes
  Global Infrastructure Partners (through Skyborn Renewables) completed the acquisition of Eversource Energy's 50% ownership interest in South Fork Wind and Revolution Wind. Adjusted gross proceeds from the transaction were $745 million for the two projects combined. Eversource exited its ownership but retained a tax-equity investment in South Fork Wind.
  Source: us.orsted.com (https://us.orsted.com/news-archive/2024/09/orsted-and-gips-skyborn-renewables-launch-joint-venture-partnership-in-south-fork-wind-and-revolution-wind)

## Sources

- [lipower.org](http://lipower.org/blog/celebrating-one-year-with-south-fork-wind) — lipower.org · tier public_source
- [southforkwind.com](https://southforkwind.com/about-south-fork-wind) — southforkwind.com · tier public_source
- [southforkwind.com](https://southforkwind.com/news/2023/11/south-fork-wind-set-for-installation-of-first-wind-turbine-offshore) — southforkwind.com · tier public_source
- [tethys.pnnl.gov](https://tethys.pnnl.gov/wind-project-sites/south-fork-wind) — tethys.pnnl.gov · tier authoritative
- [us.orsted.com](https://us.orsted.com/news-archive/2024/09/orsted-and-gips-skyborn-renewables-launch-joint-venture-partnership-in-south-fork-wind-and-revolution-wind) — us.orsted.com · tier public_source
- [boem.gov](https://www.boem.gov/renewable-energy/state-activities/south-fork) — boem.gov · tier authoritative
- [boem.gov](https://www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/SFWF%20FEIS.pdf) — boem.gov · tier authoritative

## Data quality

- Capacity discrepancy: EIA plant record reports 130 MW; owner and LIPA describe 132 MW. Both appear valid and reflect different nameplate conventions. The registry entry uses the EIA anchor value of 130 MW, and the equipment/owner configuration (12 × 11 MW turbines = 132 MW) is documented separately. Ownership transition: The asset transitioned from joint Ørsted/Eversource ownership (50/50) to joint Ørsted/Global Infrastructure Partners ownership (50/50) on September 30, 2024. Both ownership structures and the transition date are documented. Eversource remains a tax-equity investor after the sale. No plant-specific price or financing details are publicly available. Construction cost estimate: The renewablesinfo.org plant record identifies an estimated construction cost of approximately $274.8 million based on EIA-average technology costs, explicitly noting that this is not a plant-specific financial report. Historical ownership: Ørsted acquired Deepwater Wind's assets in November 2018, including the predecessor South Fork Wind project. The exact ownership chain from initial development to current joint venture is documented in the events and entity sections.

---

Canonical page: https://askthegrid.com/nyiso/assets/plant/south-fork-wind