Largest battery storage plants in CAISO
Battery and battery-hybrid power plants ranked by EIA-reported nameplate capacity. Rankings use EIA-anchored plant records in CAISO.
- Plants
- 254
- EIA nameplate capacity
- 27.1 GW
- Largest
- 1,848 MW
Ranked operating records
Sum across this peer set
Dynegy Moss Landing Power Plant Hybrid
Battery storage capacity ranking
254 matching plants·ranked by nameplate capacity
| Rank | Plant | Capacity | ||||
|---|---|---|---|---|---|---|
| 51 | Peregrine Energy Storage LLCPeregrine Energy Storage, LLC | 200 MW | Batteries | Peregrine Energy Storage, LLC | San Diego County | |
| 52 | Silver State South StorageSilver State South Storage, LLC | 200 MW | Batteries | Silver State South Storage, LLC | Clark County | |
| 53 | Sandrini Solar 100EDPR CA Solar Park II LLC | 195.4 MW | Batteries, Solar Photovoltaic | EDPR CA Solar Park II LLC | Kern County | |
| 54 | McFarland CAES Clean Energy | 185 MW | Batteries | AES Clean Energy | Yuma County | |
| 55 | Blythe Solar IV, LLCBlythe Solar IV, LLC | 184.4 MW | Batteries, Solar Photovoltaic | Blythe Solar IV, LLC | Riverside County | |
| 56 | Elkhorn Battery Energy Storage SystemPacific Gas & Electric Co. | 182.5 MW | Batteries | Pacific Gas & Electric Co. | Monterey County | |
| 57 | RE Mustang LLCMN8 Energy LLC | 175 MW | Batteries, Solar Photovoltaic | MN8 Energy LLC | Kings County | |
| 58 | Blythe Solar 110, LLCBlythe Solar 110, LLC | 172.8 MW | Solar Photovoltaic, Batteries | Blythe Solar 110, LLC | Riverside County | |
| 59 | Lockhart Solar PV, LLCTerra-Gen Operating Co-Solar | 169.4 MW | Batteries, Solar Photovoltaic | Terra-Gen Operating Co-Solar | San Bernardino County | |
| 60 | Sanborn BESS 3Terra-Gen Operating Co-BESS | 169 MW | Batteries | Terra-Gen Operating Co-BESS | Kern County | |
| 61 | BigBeau Solar, LLCBig Beau Solar, LLC | 168 MW | Batteries, Solar Photovoltaic | Big Beau Solar, LLC | Kern County | |
| 62 | Resurgence SolarResurgence Solar | 165 MW | Solar Photovoltaic, Batteries | Resurgence Solar | San Bernardino County | |
| 63 | Stanton Energy Reliability Center HybridWellhead Services, Inc | 161 MW | Batteries, Natural Gas Fired Combustion Turbine | Wellhead Services, Inc | Orange County | |
| 64 | Atlas IXAtlas IX LLC | 150 MW | Batteries | Atlas IX LLC | La Paz County | |
| 65 | Hudson - High Desert HybridMN8 Energy LLC | 150 MW | Batteries, Solar Photovoltaic | MN8 Energy LLC | San Bernardino County | |
| 66 | Maverick Solar 6, LLCMaverick Solar 6, LLC | 150 MW | Batteries, Solar Photovoltaic | Maverick Solar 6, LLC | Riverside County | |
| 67 | Lockhart Solar PV IITerra-Gen Operating Co-Solar | 144.1 MW | Solar Photovoltaic, Batteries | Terra-Gen Operating Co-Solar | San Bernardino County | |
| 68 | North Central ValleyNorth Central Valley Energy Storage, LLC | 132 MW | Batteries | North Central Valley Energy Storage, LLC | San Joaquin County | |
| 69 | CED West Side Canal Battery StorageRWE Clean Energy | 131 MW | Batteries | RWE Clean Energy | Imperial County | |
| 70 | Lancaster Area BatteryAES Distributed Energy | 127 MW | Batteries | AES Distributed Energy | Los Angeles County | |
| 71 | AVEP BESSLeeward Asset Management, LLC | 126 MW | Batteries | Leeward Asset Management, LLC | Kern County | |
| 72 | LeConte Energy StorageLeConte Energy Storage, LLC | 125 MW | Batteries | LeConte Energy Storage, LLC | Imperial County | |
| 73 | Tumbleweed Energy StorageTumbleweed Energy Storage, LLC | 125 MW | Batteries | Tumbleweed Energy Storage, LLC | Kern County | |
| 74 | Rabbitbrush Solar, LLCLeeward Asset Management, LLC | 120 MW | Batteries, Solar Photovoltaic | Leeward Asset Management, LLC | Kern County | |
| 75 | Beaumont BESSTerra-Gen Operating Co-BESS 2 | 116.6 MW | Batteries | Terra-Gen Operating Co-BESS 2 | Riverside County | |
| 76 | Edwards Sanborn E5Terra-Gen Operating Co-Hybrid | 115 MW | Batteries, Solar Photovoltaic | Terra-Gen Operating Co-Hybrid | Kern County | |
| 77 | Border Hybrid Energy CenterCalPeak Power, LLC | 114.6 MW | Natural Gas Fired Combustion Turbine, Batteries | CalPeak Power, LLC | San Diego County | |
| 78 | Daggett 1Daggett Solar Power 1 LLC | 113.5 MW | Batteries | Daggett Solar Power 1 LLC | San Bernardino County | |
| 79 | Separator (Etiwanda) BESSSouthern California Edison Co | 112.5 MW | Batteries | Southern California Edison Co | San Bernardino County | |
| 80 | Desert Harvest II LLCDesert Harvest II LLC | 105 MW | Solar Photovoltaic, Batteries | Desert Harvest II LLC | Riverside County | |
| 81 | AES ES Alamitos, LLCAES ES Alamitos, LLC | 100 MW | Batteries | AES ES Alamitos, LLC | Los Angeles County | |
| 82 | Cald BESSCald BESS LLC | 100 MW | Batteries | Cald BESS LLC | Los Angeles County | |
| 83 | Luna StorageAES Distributed Energy | 100 MW | Batteries | AES Distributed Energy | Los Angeles County | |
| 84 | Pome BESSMN8 Energy LLC | 100 MW | Batteries | MN8 Energy LLC | San Diego County | |
| 85 | Sanborn BESS 1Terra-Gen Operating Co-BESS | 100 MW | Batteries | Terra-Gen Operating Co-BESS | Kern County | |
| 86 | Sanborn BESS 2Terra-Gen Operating Co-BESS | 100 MW | Batteries | Terra-Gen Operating Co-BESS | Kern County | |
| 87 | SaticoyVentura Energy Storage, LLC | 100 MW | Batteries | Ventura Energy Storage, LLC | Ventura County | |
| 88 | CaballeroCaballero CA Storage LLC | 99.7 MW | Batteries | Caballero CA Storage LLC | San Luis Obispo County | |
| 89 | Electrolyte BESSHenrietta BESS LLC | 99.4 MW | Batteries | Henrietta BESS LLC | Kings County | |
| 90 | Lead BESS 1Hanford BESS LLC | 99.4 MW | Batteries | Hanford BESS LLC | Kings County | |
| 91 | SF Azalea, LLCIdemitsu Renewables | 98 MW | Batteries, Solar Photovoltaic | Idemitsu Renewables | Kern County | |
| 92 | Acid BESSMalaga BESS LLC | 97 MW | Batteries | Malaga BESS LLC | Fresno County | |
| 93 | Placerita ESSTerra-Gen Operating Co-BESS 2 | 88 MW | Batteries | Terra-Gen Operating Co-BESS 2 | Los Angeles County | |
| 94 | Resurgence Solar IIResurgence Solar II | 88 MW | Batteries, Solar Photovoltaic | Resurgence Solar II | San Bernardino County | |
| 95 | Fresno Cogen PartnersWellhead Services, Inc | 86.8 MW | Natural Gas Fired Combustion Turbine, Batteries | Wellhead Services, Inc | Fresno County | |
| 96 | Valley Center 85Terra-Gen Operating Co-BESS 2 | 85 MW | Batteries | Terra-Gen Operating Co-BESS 2 | San Diego County | |
| 97 | Edwards Sanborn S1Terra-Gen Operating Co-Hybrid | 84.6 MW | Batteries, Solar Photovoltaic | Terra-Gen Operating Co-Hybrid | Kern County | |
| 98 | Estrella Solar & StorageAES Clean Energy | 84 MW | Solar Photovoltaic, Batteries | AES Clean Energy | Los Angeles County | |
| 99 | AES ES Alamitos 2 LLCAES Clean Energy | 82 MW | Batteries | AES Clean Energy | Los Angeles County | |
| 100 | Bottleneck Energy StorageVESI 12 LLC | 80 MW | Batteries | VESI 12 LLC | Tulare County |
Capacity is EIA-reported nameplate capacity, not seasonal capability or available operating capacity. A plant can include multiple generators and technologies; hybrid plants may appear in multiple peer groups.