Brazoria County Solar Project (Danciger)
Shikun & Binui Energy · Brazoria County · ERCOT
Brazoria County Solar Project (Danciger) is a solar power facility with 200 MW of EIA-reported operating capacity in Brazoria County, Texas, registered as EIA Plant ID 66046. Brazoria County Solar Project, LLC is the registered plant entity or operator. Project filings list 575,000 solar panels for the facility. S&B USA acquired the project from Savion LLC in 2021.
Overview
Key fields
- Reported capacity
- 200 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Solar Photovoltaic
Primary generation technology.
- Registry anchor
- Plant 66046
Brazoria County Solar Project, LLC · Brazoria County · ERCOT
- Operating status
- Operating
Brazoria County Solar Project (Danciger) is operating.
- Grid connection
- San Bernard Substation
138 kV · Electric Reliability Council of Texas
- Equipment
- 575,000 panels
Installed equipment documented in public project records.
- Resource stack
- 2 resources
DAG_UNIT1 · DAG_UNIT2
Profile
- Grid connection
- San Bernard Substation · 138 kV · Electric Reliability Council of Texas.
Structured profile
- Reported capacity
- 200 MW
Solar Photovoltaic
- Interconnection
- San Bernard Substation
138 kV · Electric Reliability Council of Texas
- Location
- Brazoria County
ERCOT
- Operator
- Brazoria County Solar Project, LLC
- Asset role
- solar
ERCOT · Brazoria County
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| BRZ01 | 200 MW 200 MW summer | Solar Photovoltaic Solar · PV | Jul 2022 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 200 MW
- National rank
- #140
- TX rank
- #64
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Operator | Brazoria County Solar Project, LLC | Owner / developer associated with Brazoria County Solar Project (Danciger). |
| Market resources | DAG_UNIT1, DAG_UNIT2 | Linked ERCOT resources. |
| Grid selection | plant:plant-66046 | Canonical asset page /ercot/assets/plant/brazoria-county-solar-project-danciger. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Chapter 313 Application SubmittedSource
Brazoria County Solar Project, LLC submitted an application for a limitation on appraised value under Tax Code Chapter 313 to the Columbia-Brazoria Independent School District.
- Chapter 313 Application ApprovedSource
The Comptroller issued written notice that the application for a limitation on appraised value was completed and approved.
- Generator enters operationEIA-860
EIA-860 lists generator BRZ01 with this operating date.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Cutlass Solar II
Solar · 200 MW
Fort Bend County
Fighting Jays Solar Project
Solar · 227.5 MW
Fort Bend County