Canyon Wind Project, LLC
Canyon Wind Project · Scurry County · ERCOT
Canyon Wind Project is a 308.8 MW wind facility in Scurry County, Texas. EIA's May 2026 inventory reports one current generator record dated January 2024 and identifies 111 GE 2.82-127 turbines. Tri Global Energy sold the then-360 MW development to Silverpeak in 2019; that earlier development rating is not the operating EIA capacity.
Overview
Key fields
- Operating capacity
- 308.8 MW
EIA May 2026
- Wind turbines
- 111
EIA annual equipment record
- Turbine model
- GE 2.82-127
EIA annual equipment record
- Operating date
- January 2024
EIA May 2026
- Development-stage scope
- 360 MW
Silverpeak 2019
- Registry anchor
- Plant 60271
Canyon Wind Project, LLC
Resource stack
- 6 resources
CANYONWD_UNIT1 · CANYONWD_UNIT2
Profile
- Grid role
- Utility-scale wind generation in ERCOT.
- Current configuration
- 111 GE 2.82-127 onshore wind turbines.
- Capacity scope
- 308.8 MW operating EIA capacity; the 2019 Silverpeak transaction described a 360 MW development-stage scope.
- Operating date
- January 2024 in the current EIA inventory.
Structured profile
- Operating capacity
- 308.8 MW
EIA May 2026
- Equipment
- 111 GE 2.82-127 turbines
EIA annual equipment record
- Operating date
- January 2024
EIA May 2026
- Registered operator
- Canyon Wind Project, LLC
EIA May 2026
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WT1 | 308.8 MW 308.8 MW summer | Onshore Wind Turbine Wind · WT | Jan 2024 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 308.8 MW
- National rank
- #50
- TX rank
- #18
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
6 ERCOT market resources · Wind
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Owner / operator | Owner / operator for Canyon Wind Project, LLC | |
| Developer / seller | Developer / seller for Canyon Wind Project, LLC | |
| Market resources | CANYONWD_UNIT1, CANYONWD_UNIT2, CANYONWD_UNIT3, CANYONWD_UNIT4, CANYONWD_UNIT5 | 6 linked ERCOT resources. |
| Grid selection | plant:plant-60271 | Canonical asset page /ercot/assets/plant/canyon-wind-project-llc. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Development project sold to SilverpeakSilverpeak ...
Tri Global Energy sold the then-360 MW development-stage project; no price was disclosed.
- Operating generator entered serviceEIA May 202...
EIA reports January 2024 for the 308.8 MW record.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.