Cedro Hill Wind LLC
Clearway Energy Group · Webb County · ERCOT
Cedro Hill is a repowered 160 MW wind facility in Webb County, Texas. Clearway reports that all 100 turbines received new blades and nacelles in a $269 million repower completed in early 2025, increasing the physical site's rating from 150 MW to 160 MW. EIA's May 2026 inventory still contains two 150 MW generator records under Plant ID 57260, a 300 MW registry aggregate that does not match Clearway's current physical-site rating. The two scopes are shown separately rather than added together.
Overview
Key fields
- Current site rating
- 160 MW
Clearway · post-repower
- EIA registry aggregate
- 300 MW
2 × 150 MW records
- Turbines
- 100
Clearway
- Repower investment
- $269M
Clearway
- Settlement point
- CEDROHI_CHW1
ERCOT settlement point.
- Registry anchor
- Plant 57260
Cedro Hill Wind, LLC
Resource stack
- 2 resources
CEDROHIL_CHW1 · CEDROHIL_CHW2
Profile
- Current physical site
- 160 MW after repower · 100 turbines.
- EIA registry
- Two 150 MW records total 300 MW; this is retained as a registry fact, not presented as current physical capacity.
- Repower
- $269 million investment; blades and nacelles replaced on all turbines.
Structured profile
- Current physical capacity
- 160 MW
Clearway
- Original capacity
- 150 MW
Clearway
- EIA registry aggregate
- 300 MW
EIA May 2026
- Repower investment
- $269 million
Clearway
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 150 MW 150 MW summer | Onshore Wind Turbine Wind · WT | Dec 2010 | Operating |
| 2 | 150 MW 150 MW summer | Onshore Wind Turbine Wind · WT | Dec 2010 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 300 MW
- National rank
- #71
- TX rank
- #25
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Wind
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsNearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Financing
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Project company and EIA registered operator | Cedro Hill Wind, LLC | EIA May 2026 generator inventory |
| Current owner and repower sponsor | Clearway Cedro Hill repower | |
| Market resources | CEDROHIL_CHW1, CEDROHIL_CHW2 | Linked ERCOT resources. |
| Grid selection | plant:plant-57260 | Canonical asset page /ercot/assets/plant/cedro-hill-wind-llc. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Original facility entered serviceEIA May 202...
EIA reports December 2010 for both registry records.
- Repower Financing ClosedClearway Ce...
Clearway closed $261 million of construction, term, and letter-of-credit facilities.
- Repowered Facility AnnouncedClearway Ce...
Clearway announced completion of the 160 MW repower.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Torrecillas Wind Energy, LLC
Wind · 300 MW
Webb County
Javelina Wind Energy, LLC
Wind · 249.7 MW
Webb County
Karankawa Wind LLC
Wind · 307.1 MW
San Patricio County