Concho Valley Solar, LLC
KOMIPO America, Inc. · Tom Green County · ERCOT
Concho Valley Solar, LLC is a solar power facility with 159.8 MW of ERCOT-reported seasonal capability in Tom Green County, Texas, registered as EIA Plant ID 65793. Merit SI and KOMIPO America are the documented joint developers; Concho Valley Solar, LLC is the registered plant entity or operator. Project filings list 447,000 solar panels for the facility. KOMIPO reports operation beginning in October 2022; ERCOT records the resource year as 2023.
Overview
Key fields
- Reported capacity
- 159.8 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Solar Photovoltaic
Primary generation technology.
- Registry anchor
- Plant 65793
Concho Valley Solar, LLC · Tom Green County · ERCOT
- Operating status
- Operating
Concho Valley Solar, LLC is operating.
- Equipment
- 447,000 panels
Installed equipment documented in public project records.
- Resource stack
- 1 resource
RATLIFF_SOLAR1
Profile
- Grid role
- Utility-scale solar generation in ERCOT's energy-only market.
Structured profile
- Reported capacity
- 159.8 MW
Solar Photovoltaic
- Operating status
- operating
Concho Valley Solar, LLC is operating.
- Location
- Tom Green County
ERCOT
- Operator
- Concho Valley Solar, LLC
- Asset role
- solar
ERCOT · Tom Green County
- Owner
- Concho Valley Solar, LLC
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CVS | 172.8 MW 159.8 MW summer | Solar Photovoltaic Solar · PV | May 2023 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 172.8 MW
- National rank
- #235
- TX rank
- #88
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
1 ERCOT market resource · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Financing
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Operator | Concho Valley Solar, LLC | Owner / developer associated with Concho Valley Solar, LLC. |
| Owner / developer | Owner / developer associated with Concho Valley Solar, LLC. | |
| Owner / developer | Owner / developer associated with Concho Valley Solar, LLC. | |
| Market resources | RATLIFF_SOLAR1 | Linked ERCOT resources. |
| Grid selection | plant:plant-65793 | Canonical asset page /ercot/assets/plant/concho-valley-solar-llc. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Construction InitiatedNovember 1,...
Concho Valley Solar initiated construction of the project near San Angelo in Tom Green County in the fourth quarter of 2021.
- Generator enters operationEIA-860
EIA-860 lists generator CVS with this operating date.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Angelo Solar
Solar · 195 MW
Tom Green County
Galloway 2 Solar Farm
Solar · 110 MW
Concho County
Holstein 1 Solar Farm
Solar · 200 MW
Nolan County