Corazon Energy LLC
Eni New Energy US Inc. · Webb County · ERCOT
Corazon Energy LLC is a solar power facility with 200 MW of EIA-reported operating capacity in Webb County, Texas, registered as EIA Plant ID 64538. Corazon Energy LLC is the registered plant entity or operator. Project filings list 658,000 solar panels and 66 inverters for the facility.
Overview
Key fields
- Reported capacity
- 200 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Solar Photovoltaic
Primary generation technology.
- Registry anchor
- Plant 64538
Corazon Energy LLC · Webb County · ERCOT
- Operating status
- Operating
Corazon Energy LLC is operating.
- Grid connection
- Corazon Solar 345-kV Substation
345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station
- Equipment
- 658,000 panels / 66 inverters
Installed equipment documented in public project records.
- Project financing
- $216.1M
A construction credit agreement of up to $216.1 million was arranged in April 2021 to finance design, construction and operation of the 200 MW AC Corazon project; the North American Development Bank (NADB) participated with a $62.9 million loan and served as coordinating lead arranger alongside a syndicate of three other lenders.
Resource stack
- 2 resources
CORAZON_ESR1 · CORAZON_UNIT1
Profile
- Grid role
- Utility-scale solar generation in ERCOT's energy-only market.
- Grid connection
- Corazon Solar 345-kV Substation · 345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station.
- Context
- BayWa r.e. described Corazon I as among the largest projects in Texas, producing more than 500 GWh annually and materially supported by a dedicated $216.1 million construction financing facility that included a $62.9 million loan from the North American Development Bank.
- Physical build
- Corazon I (Corazon Energy LLC, EIA 64538) is a 200 MW AC utility-scale solar PV park on ~2,000 acres in Webb County, TX. Project documentation (NADB / BayWa r.e.) states the scope includes approximately 658,000 bifacial monocrystalline PV modules (nominal 400–410 W each) mounted on single-axis tracking arrays, 66 inverters collecting to 34.5 kV, underground collection cables, one step-up substation to 345 kV and a ~3.7-mile aerial transmission line to the ETT Lobo 345 kV station. (NADB procurement/engineering documents list construction start July 2020 and expected commercial operation August 2021; BayWa r.e. and press coverage confirm 266 MWdc / 200 MWac nameplate and commissioning in 2021.)
- Financing
- A construction credit agreement of up to $216.1 million was arranged in April 2021 to finance design, construction and operation of the 200 MW AC Corazon project; the North American Development Bank (NADB) participated with a $62.9 million loan and served as coordinating lead arranger alongside a syndicate of three other lenders.
Structured profile
- Reported capacity
- 200 MW
Solar Photovoltaic
- Operating status
- operating
Corazon Energy LLC is operating.
- Interconnection
- Corazon Solar 345-kV Substation
345 kV · Electric Transmission Texas (ETT) — Lobo 345 kV station
- Location
- Webb County
ERCOT
- Operator
- Corazon Energy LLC
- Asset role
- solar
ERCOT · Webb County
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| KOV4A | 200 MW 200 MW summer | Solar Photovoltaic Solar · PV | Aug 2021 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 200 MW
- National rank
- #140
- TX rank
- #64
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Battery / storage, Solar
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Financing
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Operator | Owner / developer associated with Corazon Energy LLC. | |
| Financing arranger | Participated in the construction facility with a $62.9 million loan and served as coordinating lead arranger for the up-to-$216.1 million credit agreement signed in April 2021. | |
| Market resources | CORAZON_ESR1, CORAZON_UNIT1 | Linked ERCOT resources. |
| Grid selection | plant:plant-64538 | Canonical asset page /ercot/assets/plant/corazon-energy-llc. |
Reporting portfolio
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Timeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Project Certification (NADB)BayWa Coraz...
Project certification recorded (NADB project record shows certification date December 11, 2020 for the BayWa Corazon solar project in Webb County).
- Commercial operation (developer report)BayWa r.e. ...
BayWa r.e. reports the Corazon I solar plant began commercial operations in August 2021.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.