Magic Valley Wind Farm I LLC
RWE Clean Energy and Enbridge · Willacy County · ERCOT
Magic Valley Wind Farm I is a 203 MW EIA wind facility near Harlingen in Willacy County, Texas. EIA's May 2026 inventory lists RWE Clean Energy as the registered operator and September 2012 as the service month.
Overview
Key fields
- EIA capacity
- 203 MW
EIA May 2026
- Settlement point
- REDFISH_ALL
ERCOT settlement point.
- Registry anchor
- Plant 57802
RWE Clean Energy
Resource stack
- 2 resources
REDFISH_MV1A · REDFISH_MV1B
Profile
- Grid role
- Utility-scale onshore wind generation in South Texas.
- Physical build
- 112 wind turbines.
Structured profile
- Operating capacity
- 203 MW
EIA May 2026
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| MV1 | 203 MW 203 MW summer | Onshore Wind Turbine Wind · WT | Sep 2012 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 203 MW
- National rank
- #234
- TX rank
- #78
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Wind
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsNearby substations
HIFLD infrastructure inventoryCommercial, land, and environmental record
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Land and environmental record
Related parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Project company | Magic Valley Wind Farm I LLC | EIA May 2026 generator inventory |
| EIA registered operator and continuing project participant | EIA May 2026 generator inventory | |
| Market resources | REDFISH_MV1A, REDFISH_MV1B | Linked ERCOT resources. |
| Grid selection | plant:plant-57802 | Canonical asset page /ercot/assets/plant/magic-valley-wind-farm-i-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Bright Arrow Solar, LLC | 403.6 MW | TX |
| Cartwheel 1 - Storage, LLC | 300 MW | TX |
| Peregrine Solar | 300 MW | TX |
| Fifth Standard Solar PV, LLC (Hybrid) | 287 MW | CA |
| Radfords Run Wind Farm | 278 MW | IL |
| Emily Solar, LLC | 273.6 MW | IL |
| Copper Mountain Solar 3 | 255 MW | NV |
| Copper Mountain Solar 5, LLC | 252 MW | NV |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- EIA Service MonthEIA May 202...
EIA reports September 2012.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Los Vientos Wind 1B
Wind · 201.6 MW
Cameron County
Raymond Wind Farm, LLC
Wind · 200.2 MW
Willacy County
Los Vientos Wind 1A
Wind · 200 MW
Cameron County
La Chalupa, LLC
Wind · 198.5 MW
Cameron County